Seismic Application in Horizontal Well Drilling - Brazeau River Nisku D Pool
View through CrossRef
Abstract
Since 1992, two 300–400 m long horizontal wells have been drilled in the Brazeau River Nisku D pool at a true vertical depth of 3200 m. The pool has been under vertical hydrocarbon miscible flood for over fifteen years. The purpose of these horizontal wells was to increase ultimate pool recovery by reducing well drawdown leading to improved GOR behavior.
The initial discovery and vertical well development were based on 2-D seismic data. As the GOR increased, alternative seismic and drilling technologies were used to optimize pool recovery.
Three component vertical seismic profiling was conducted to locate the porous zone and to aid in the design of the length, depth and azimuth of the first horizontal well drilled in 1992. In late 1993, a 3-D over the pool seismic program was conducted which was used to map the Nisku base structure and porosity to determine the deepest corridor along which the second horizontal well would traverse. This led to the second horizontal well, drilled in 1994. In all, three forms of seismic technologies, including 2-D seismic, have been used in the development of the Nisku D Pool.
Both horizontal wells were drilled as reentries from existing wellbores and open hole completed, to minimize cost. The initial oil rate of the first horizontal well was 250 m3/d with an expected incremental reserves of approximately 190 000 m3, or seven percent of the OOIP. The second horizontal well had an initial rate of 200 m3/d, and is expected to contribute another 81 000 m3 of incremental reserves. In both instances, producing GOR was reduced to the initial solution GOR of approximately 140 m3/m3, from a pre-reentry high of over 2500 m3/m3. The low GOR was maintained for over 6 months. The reentry costs were paid out within the first year of production.
3-D seismic with reservoir characterization over the pool has proven to be superior in providing a more complete understanding of the reservoir and, with a properly planned acquisition program, can be effectively used for the design of horizontal wells to maximize pool recovery.
Introduction
The Brazeau River Nisku D pool, located 150 km southwest of Edmonton, Alberta, is a pinnacle reef containing sweet light volatile oil having a density of approximately 800 kg/m3 and a solution GOR of 140 m3/m3. Figure 1 shows the location of the D pool along with other producing Nisku reefs in the area. The Nisku D pool was discovered in June 1978 with the drilling of well 7-33-48-12 WSM. Average porosity ranges from 7 to 10 percent and the average net pay is 40 m. Average pool permeability is approximately 50 mD. The original oil-in-place of 2700 103m3 was established by material balance. Table 1 summarizes the reservoir and fluid properties of the pool.
History
The pool was initially under primary production using wells 5–34 and 7–33 until October 1980 when it was shut in. By this time, the reservoir pressure had declined from an initial 34 500 kPa to 20 000 kPa, 480 kPa below the bubble point pressure and created an estimated three percent critical gas saturation. A vertical lean hydrocarbon miscible flood with a minimum operating pressure of 36 000 kPa was implemented in August 1981 with gas injection at 10–33. The pressure history is shown in Figure 2. A third producer, 15–28, was added in 1983.
Gas breakthrough occurred at 7–33 six months after injection started, followed by the 5–34 a year later. Gas broke through at the 15–28 well in 1985. As shown in Figure 3, the pool produced at a relatively stable oil rate of 400 m3/d until 1987 when decline began due to limited capacity to handle the increasing gas production as GOR increases, as shown in Figure 4. Due to high GOR's, the 7–33 well was suspended in 1988, and the 5–34 in 1991.
P. 769
Title: Seismic Application in Horizontal Well Drilling - Brazeau River Nisku D Pool
Description:
Abstract
Since 1992, two 300–400 m long horizontal wells have been drilled in the Brazeau River Nisku D pool at a true vertical depth of 3200 m.
The pool has been under vertical hydrocarbon miscible flood for over fifteen years.
The purpose of these horizontal wells was to increase ultimate pool recovery by reducing well drawdown leading to improved GOR behavior.
The initial discovery and vertical well development were based on 2-D seismic data.
As the GOR increased, alternative seismic and drilling technologies were used to optimize pool recovery.
Three component vertical seismic profiling was conducted to locate the porous zone and to aid in the design of the length, depth and azimuth of the first horizontal well drilled in 1992.
In late 1993, a 3-D over the pool seismic program was conducted which was used to map the Nisku base structure and porosity to determine the deepest corridor along which the second horizontal well would traverse.
This led to the second horizontal well, drilled in 1994.
In all, three forms of seismic technologies, including 2-D seismic, have been used in the development of the Nisku D Pool.
Both horizontal wells were drilled as reentries from existing wellbores and open hole completed, to minimize cost.
The initial oil rate of the first horizontal well was 250 m3/d with an expected incremental reserves of approximately 190 000 m3, or seven percent of the OOIP.
The second horizontal well had an initial rate of 200 m3/d, and is expected to contribute another 81 000 m3 of incremental reserves.
In both instances, producing GOR was reduced to the initial solution GOR of approximately 140 m3/m3, from a pre-reentry high of over 2500 m3/m3.
The low GOR was maintained for over 6 months.
The reentry costs were paid out within the first year of production.
3-D seismic with reservoir characterization over the pool has proven to be superior in providing a more complete understanding of the reservoir and, with a properly planned acquisition program, can be effectively used for the design of horizontal wells to maximize pool recovery.
Introduction
The Brazeau River Nisku D pool, located 150 km southwest of Edmonton, Alberta, is a pinnacle reef containing sweet light volatile oil having a density of approximately 800 kg/m3 and a solution GOR of 140 m3/m3.
Figure 1 shows the location of the D pool along with other producing Nisku reefs in the area.
The Nisku D pool was discovered in June 1978 with the drilling of well 7-33-48-12 WSM.
Average porosity ranges from 7 to 10 percent and the average net pay is 40 m.
Average pool permeability is approximately 50 mD.
The original oil-in-place of 2700 103m3 was established by material balance.
Table 1 summarizes the reservoir and fluid properties of the pool.
History
The pool was initially under primary production using wells 5–34 and 7–33 until October 1980 when it was shut in.
By this time, the reservoir pressure had declined from an initial 34 500 kPa to 20 000 kPa, 480 kPa below the bubble point pressure and created an estimated three percent critical gas saturation.
A vertical lean hydrocarbon miscible flood with a minimum operating pressure of 36 000 kPa was implemented in August 1981 with gas injection at 10–33.
The pressure history is shown in Figure 2.
A third producer, 15–28, was added in 1983.
Gas breakthrough occurred at 7–33 six months after injection started, followed by the 5–34 a year later.
Gas broke through at the 15–28 well in 1985.
As shown in Figure 3, the pool produced at a relatively stable oil rate of 400 m3/d until 1987 when decline began due to limited capacity to handle the increasing gas production as GOR increases, as shown in Figure 4.
Due to high GOR's, the 7–33 well was suspended in 1988, and the 5–34 in 1991.
P.
769.
Related Results
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Abstract
Horizontal drilling technology has been the fastest growing segment of the oil and gas industry over the last few years. With the diversity of reservoirs...
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Abstract
Horizontal drilling technology has been the fastest growing segment of the oil and gas industry over the last few years. With the diversity of reservoirs...
Planning Drilling Fluid Programs in Southeast Asia
Planning Drilling Fluid Programs in Southeast Asia
Planning the drilling fluids program is one of the most important steps in Planning the drilling fluids program is one of the most important steps in preparation for the drilling o...
Application of Multiphase Flow Methods to Horizontal Underbalanced Drilling
Application of Multiphase Flow Methods to Horizontal Underbalanced Drilling
Abstract
Multiphase flow can be present in all aspects of underbalanced drilling. This paper outlines the ways in which multiphase flow pressure loss calculations...
Rock Breaking Mechanism and Trajectory Stabilization of Horizontal Well Section with Flexible Drilling Tool
Rock Breaking Mechanism and Trajectory Stabilization of Horizontal Well Section with Flexible Drilling Tool
ABSTRACT
This paper examines the mechanics of rock-breaking and trajectory issues in ultra-short radius radial horizontal wells with flexible drilling tools that ...
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Drilling in deeper formations and in high pressure and high temperature (HPHT) environments is a new frontier for the oil industry. Fifty years ago, no one would have imagined dril...
Drilling Variables At Technical Limit Of Drilling Rate
Drilling Variables At Technical Limit Of Drilling Rate
Abstract
Recorded drilling times may show significant variations from well to well even for the same total depth in the same field. Apart from the formation chara...
Introduction of Game-changing Drilling Technology
Introduction of Game-changing Drilling Technology
SPE/IADC Member
Abstract
This paper describes the structured process of drilling technology introduction in Petroleum Developmen...