Javascript must be enabled to continue!
Design, Fabrication, and Installation of the Neptune Export Lateral PLETs
View through CrossRef
Abstract
As development projects in deep water Gulf of Mexico move further away from existing infrastructure, it becomes advantageous to consider subsea tie-in of their export systems with existing deepwater pipeline systems offering spare transport capacity. The Commercial Agreements between Owners of such systems and third parties utilizing these tie-in locations normally mandate that the latter provide a spare connection for Owner's use. This necessitates incorporating large heavy wyes, a spare male hub and spare subsea valve into the Pipeline End Termination (PLET), with consequent increase in size and weight. The resulting functional design has to be optimized to obtain a PLET size and weight that satisfies installation vessel constraints. The subject matter describes the successful design of such large and heavy PLETs for second end installation by the J-technique. Although several PLETs have been installed by this technique, to date, the Neptune PLETs are the largest and heaviest " second-end?? installed in water depths upto 4000 ft, and required modifications to the installation vessel, Allseas' DP pipelay vessel Solitaire.
Introduction
In early 2007, Enbridge Offshore Facilities, L.L.C. (Enbridge) installed 20-inch oil and 12-inch gas export pipelines for the transportation of production from the Neptune TLP in Green Canyon block 613. These export pipeline systems originate as steel catenary risers from the TLP, and terminate at PLETs P3 (gas) and P7 (oil) in Green Canyon Block 650. The PLET piping is jumper-connected to the adjacent gas and oil wye sled assemblies (WSA, W3 and W7) incorporated in the Mad Dog laterals of the Caesar and Cleopatra Pipelines of the Mardi Gras Transportation System.
The Neptune export PLETs incorporate subsea wyes, valves and connector hubs, and provide spare oil and gas connection hubs for tie-in of future laterals, at the same locations in block GC 650. The P3 and P7 PLET design incorporates provisions for the safe passage of pigs specially designed to traverse multi-diameter pipeline systems. This Paper describes the design, fabrication and installation of the Neptune oil and gas export lateral PLETs in 4200 ft depths in Green Canyon Block 650, Gulf of Mexico.
PLET design
The PLET Structure is comprised of a mudmat, main structural frame and an installation yoke. The main structural frame supports the piping and components (wye, valves, hubs), while the mudmat distributes the load to the seabed while minimizing settlement. The yoke is hinged to the structural frame, to minimize torsion related rotation of the PLET pipeline assembly during installation and lay down of the PLET onto the seabed.
To ensure a low center of gravity, the wye is oriented horizontally, and the mudmat is attached to the bottom of the PLET framing. This assists in minimizing pipeline bending moment at the PLET/pipeline interface, and in mitigating rotation tendency of the PLET as it is lowered from the surface to the seabed. The water depth for the gas PLET P3 is 4221 ft, while the oil PLET P7 is in 4267 ft depth.
Title: Design, Fabrication, and Installation of the Neptune Export Lateral PLETs
Description:
Abstract
As development projects in deep water Gulf of Mexico move further away from existing infrastructure, it becomes advantageous to consider subsea tie-in of their export systems with existing deepwater pipeline systems offering spare transport capacity.
The Commercial Agreements between Owners of such systems and third parties utilizing these tie-in locations normally mandate that the latter provide a spare connection for Owner's use.
This necessitates incorporating large heavy wyes, a spare male hub and spare subsea valve into the Pipeline End Termination (PLET), with consequent increase in size and weight.
The resulting functional design has to be optimized to obtain a PLET size and weight that satisfies installation vessel constraints.
The subject matter describes the successful design of such large and heavy PLETs for second end installation by the J-technique.
Although several PLETs have been installed by this technique, to date, the Neptune PLETs are the largest and heaviest " second-end?? installed in water depths upto 4000 ft, and required modifications to the installation vessel, Allseas' DP pipelay vessel Solitaire.
Introduction
In early 2007, Enbridge Offshore Facilities, L.
L.
C.
(Enbridge) installed 20-inch oil and 12-inch gas export pipelines for the transportation of production from the Neptune TLP in Green Canyon block 613.
These export pipeline systems originate as steel catenary risers from the TLP, and terminate at PLETs P3 (gas) and P7 (oil) in Green Canyon Block 650.
The PLET piping is jumper-connected to the adjacent gas and oil wye sled assemblies (WSA, W3 and W7) incorporated in the Mad Dog laterals of the Caesar and Cleopatra Pipelines of the Mardi Gras Transportation System.
The Neptune export PLETs incorporate subsea wyes, valves and connector hubs, and provide spare oil and gas connection hubs for tie-in of future laterals, at the same locations in block GC 650.
The P3 and P7 PLET design incorporates provisions for the safe passage of pigs specially designed to traverse multi-diameter pipeline systems.
This Paper describes the design, fabrication and installation of the Neptune oil and gas export lateral PLETs in 4200 ft depths in Green Canyon Block 650, Gulf of Mexico.
PLET design
The PLET Structure is comprised of a mudmat, main structural frame and an installation yoke.
The main structural frame supports the piping and components (wye, valves, hubs), while the mudmat distributes the load to the seabed while minimizing settlement.
The yoke is hinged to the structural frame, to minimize torsion related rotation of the PLET pipeline assembly during installation and lay down of the PLET onto the seabed.
To ensure a low center of gravity, the wye is oriented horizontally, and the mudmat is attached to the bottom of the PLET framing.
This assists in minimizing pipeline bending moment at the PLET/pipeline interface, and in mitigating rotation tendency of the PLET as it is lowered from the surface to the seabed.
The water depth for the gas PLET P3 is 4221 ft, while the oil PLET P7 is in 4267 ft depth.
Related Results
Increased life expectancy of heart failure patients in a rural center by a multidisciplinary program
Increased life expectancy of heart failure patients in a rural center by a multidisciplinary program
Abstract
Funding Acknowledgements
Type of funding sources: None.
INTRODUCTION Patients with heart failure (HF)...
A holistic aerosol model for Uranus and Neptune, including Dark Spots
A holistic aerosol model for Uranus and Neptune, including Dark Spots
<p>Previous studies of the reflectance spectra of Uranus and Neptune concentrated on individual, narrow wavelength regions, inferring solutions for the vertical struc...
Primary PCI: a reasonable treatment for STEMI care during the COVID-19 pandemic
Primary PCI: a reasonable treatment for STEMI care during the COVID-19 pandemic
Abstract
Funding Acknowledgements
Type of funding sources: None.
Introduction
...
Neptune Frost
Neptune Frost
Distributed by Kino Lorber Edu, 333 West 39 St, Suite 503, New York, NY 10018; 212-629-6880Produced by Lin-Manuel Miranda and Stephen HendelDirected by Saul Williams and Anisia Uze...
Export concentration and diversification impact on economic growth in the developed and developing countries of the world
Export concentration and diversification impact on economic growth in the developed and developing countries of the world
There is much evidence that export diversity has a positive effect on economic growth, but there is some evidence that the concentration of exports may be also related to economic ...
Girassol Export Lines
Girassol Export Lines
Abstract
This paper will describe the development of a new pipeline concept for the export of oil from a large capacity FPSO to an offloading buoy. The installati...
Installation of Deepwater Pipelines With Sled Assemblies Using The New J-Lay System of the DCV Balder
Installation of Deepwater Pipelines With Sled Assemblies Using The New J-Lay System of the DCV Balder
Abstract
This paper describes the most important features required for installing deepwater pipelines, pipelines with in-line sled assemblies, PLETs, and SCRs. Th...
Neptune Project: Spar Hull, Mooring and Topsides Installation
Neptune Project: Spar Hull, Mooring and Topsides Installation
Abstract
This paper describes the installation of the Neptune Spar at Viosca Knoll Block 826, approximately 90 miles south of Mobile, Alabama in the Gulf of Mexic...