Javascript must be enabled to continue!
Subsea Pelican Oil Field Scale Management and Production Enhancement
View through CrossRef
Abstract
This abstract presents the evolving scale management strategy over the life of the Pelican field and the recent success in enhancing late life production.
The subsea Pelican gas lifted field is a water injection supported oil field tied back to the Cormorant Alpha platform and has been in production since 1996.
In early field life, the initial scaling assessment predicted barite scale deposition in the tubing, prompting the adoption of preventive inhibition measures. Scale dissolver treatments and inhibitors were dutifully employed throughout most the field's life, but some wells experienced productivity decline due to scale inhibitor injection and some well abandonments recovered clean tubing with no scale deposits.
As new wells were to be drilled in late field life, a reassessment of the scale management strategy was required and core studies were commissioned to assess the inhibitor impact on return permeability, which revealed a significant reduction in productivity. Moreover, a study by Heriot Watt University indicated that the risk of barite scaling was confined to the reservoir, with a low probability of deposition in the wellbore and this led to the suspension of further inhibitor treatments.
However, during the period 2016 to 2018 a significant production decline in the Pelican field was observed. After a rigorous well performance and scaling tendency reviews, the decline was attributed to calcite deposition which ran contrary to both production and abandonment experience. Challenging accepted field practice, required multiple gated approval processes before finally obtaining approval to proceed with the subsea intervention to restore productivity.
Consequently, extensive carbonate scale was removed from high up in the tubing through to the reservoir section in the biggest producer PuP18s1 in 2019 with the MSS1 rig. A combination of multiple runs of chemical dissolver and CT milling were employed to remove scale restrictions to increase well production rate. Scale treatment of the P18S1 well successfully increased production from the Pelican field by 40%.
After successful scale removal, a remediation strategy was put in place, involving yearly acid dissolver treatment bullheading to the subsea wells. This approach has achieved stable production from 2021 to 2023, with three successful acid dissolver treatments and no significant decline in the production rate.
Title: Subsea Pelican Oil Field Scale Management and Production Enhancement
Description:
Abstract
This abstract presents the evolving scale management strategy over the life of the Pelican field and the recent success in enhancing late life production.
The subsea Pelican gas lifted field is a water injection supported oil field tied back to the Cormorant Alpha platform and has been in production since 1996.
In early field life, the initial scaling assessment predicted barite scale deposition in the tubing, prompting the adoption of preventive inhibition measures.
Scale dissolver treatments and inhibitors were dutifully employed throughout most the field's life, but some wells experienced productivity decline due to scale inhibitor injection and some well abandonments recovered clean tubing with no scale deposits.
As new wells were to be drilled in late field life, a reassessment of the scale management strategy was required and core studies were commissioned to assess the inhibitor impact on return permeability, which revealed a significant reduction in productivity.
Moreover, a study by Heriot Watt University indicated that the risk of barite scaling was confined to the reservoir, with a low probability of deposition in the wellbore and this led to the suspension of further inhibitor treatments.
However, during the period 2016 to 2018 a significant production decline in the Pelican field was observed.
After a rigorous well performance and scaling tendency reviews, the decline was attributed to calcite deposition which ran contrary to both production and abandonment experience.
Challenging accepted field practice, required multiple gated approval processes before finally obtaining approval to proceed with the subsea intervention to restore productivity.
Consequently, extensive carbonate scale was removed from high up in the tubing through to the reservoir section in the biggest producer PuP18s1 in 2019 with the MSS1 rig.
A combination of multiple runs of chemical dissolver and CT milling were employed to remove scale restrictions to increase well production rate.
Scale treatment of the P18S1 well successfully increased production from the Pelican field by 40%.
After successful scale removal, a remediation strategy was put in place, involving yearly acid dissolver treatment bullheading to the subsea wells.
This approach has achieved stable production from 2021 to 2023, with three successful acid dissolver treatments and no significant decline in the production rate.
Related Results
Design Principles For Multi-Well 'Subsea Production Equipment
Design Principles For Multi-Well 'Subsea Production Equipment
ABSTRACT
Use of multi-well subsea production systems has recently increased due to the early production this type of system offers for large oil fields and the ec...
Subsea Factory–Standardization of the Brownfield Factory
Subsea Factory–Standardization of the Brownfield Factory
Abstract
As part of the corporate technology strategy Statoil has launched a technology plan for the Subsea Factory concept. The plan describes how to combine subsea...
Simple Subsea Trees for Shallow Water: An Economical Alternative
Simple Subsea Trees for Shallow Water: An Economical Alternative
Abstract
Simple, diver assisted subsea completions have been installed and operated successfully in many shallow water oil fields around the world. Although these...
Ormen Lange Subsea Production System
Ormen Lange Subsea Production System
Abstract
This paper presents the concept and the technical solutions developed and applied to the Ormen Lange subsea production system. First, the key technical c...
Inspection of Subsea Conductors Using an Innovative Drop-Down Camera
Inspection of Subsea Conductors Using an Innovative Drop-Down Camera
Abstract
Subsea conductors are the foundational elements of offshore drilling operations, serving a dual purpose as both the structural framework and the main condui...
Innovative Technology for Ultradeepwater Gravity-Based Separators
Innovative Technology for Ultradeepwater Gravity-Based Separators
Abstract
The Troll subsea separation station is now in operation and is establishing a working track record. The Troll subsea separation station separates water a...
Evolution Of Subsea Production Systems: A Worldwide Overview
Evolution Of Subsea Production Systems: A Worldwide Overview
ABSTRACT
The evolution in the use of subsea technology has seen advancement -from I well in the Gulf of Mexico in 1961 to over 750 wells in a tide variety of loca...
Technology Focus: Subsea Systems (August 2025)
Technology Focus: Subsea Systems (August 2025)
_
From a broader and high-level perspective—considering importance, impact, significance, and criticality—subsea systems and advanced offshore engineering play an...