Javascript must be enabled to continue!
Engineered Bit Design and Drilling Parameters Mark Breakthrough Drilling Performance in Interbedded Damaging Carbonates
View through CrossRef
Abstract
West Kuwait's 22-in. section comprises a vertical hole through 3,500 feet of interbedded carbonates varying significantly in compressive strength, and drilled commonly with minimal or no fluid returns. The section is typically drilled with roller-cone tungsten carbide insert (TCI) bits because large polycrystalline diamond compact (PDC) bits are extremely costly and require expensive performance motors to support their generated torque. PDC bits are also at risk of impact damage when drilling through the interbedded formations in this interval. Operators tend to apply higher drilling parameters while in the lower compressive strength intervals to achieve higher rates of penetration (ROP). Consequently, when the TCI bit enters the following harder formations with the same high operating parameters, it often suffers severe cutting structure damage. The result is reduced ROP. Greater weight on bit is then applied, causing further bit damage and possible sealed bearing failure.
An engineering project was launched to develop a TCI bit specifically for the interbedded carbonates of this section. The primary challenges of the project were:
Ensure the bit finishes the section in one run Improve dull condition of bit coming out of hole Surpass current field average ROP consistently Maintain efficient cleaning at lower flow rates for drilling in complete fluid-loss scenario
Based on data and experience in drilling the application, an engineering process took place where several designs improvements with potential to improve performance were identified and trialled. Field engineers then worked onsite to identify how to drill the interval with optimal parameters for each sub-layer. The final design included:
Specialized TCI cutting structure for carbonate drilling High impact-resistant insert geometry Simulated hydraulic efficiency to improve hole cleaning Improved high aspect ratio elastomer seals designed to endure longer runs Specialized tungsten carbide to improve cutting structure durability
The engineering process yielded a design that successfully drills the complete section in one fast run - the fastest of the section - with an improved field average penetration rate to 63%, saving the operator more than 38% in associated cost for drilling the section. The application-engineered cutting structure enabled the use of lower drilling parameters than normal, thereby improving drilling efficiency and enhancing the post-drilling dull condition from the average of 3-3-BT to 1-2-WT.
The paper shows a case study in Kuwait demonstrating the engineering and results of designing a TCI bit matched to application.
Title: Engineered Bit Design and Drilling Parameters Mark Breakthrough Drilling Performance in Interbedded Damaging Carbonates
Description:
Abstract
West Kuwait's 22-in.
section comprises a vertical hole through 3,500 feet of interbedded carbonates varying significantly in compressive strength, and drilled commonly with minimal or no fluid returns.
The section is typically drilled with roller-cone tungsten carbide insert (TCI) bits because large polycrystalline diamond compact (PDC) bits are extremely costly and require expensive performance motors to support their generated torque.
PDC bits are also at risk of impact damage when drilling through the interbedded formations in this interval.
Operators tend to apply higher drilling parameters while in the lower compressive strength intervals to achieve higher rates of penetration (ROP).
Consequently, when the TCI bit enters the following harder formations with the same high operating parameters, it often suffers severe cutting structure damage.
The result is reduced ROP.
Greater weight on bit is then applied, causing further bit damage and possible sealed bearing failure.
An engineering project was launched to develop a TCI bit specifically for the interbedded carbonates of this section.
The primary challenges of the project were:
Ensure the bit finishes the section in one run Improve dull condition of bit coming out of hole Surpass current field average ROP consistently Maintain efficient cleaning at lower flow rates for drilling in complete fluid-loss scenario
Based on data and experience in drilling the application, an engineering process took place where several designs improvements with potential to improve performance were identified and trialled.
Field engineers then worked onsite to identify how to drill the interval with optimal parameters for each sub-layer.
The final design included:
Specialized TCI cutting structure for carbonate drilling High impact-resistant insert geometry Simulated hydraulic efficiency to improve hole cleaning Improved high aspect ratio elastomer seals designed to endure longer runs Specialized tungsten carbide to improve cutting structure durability
The engineering process yielded a design that successfully drills the complete section in one fast run - the fastest of the section - with an improved field average penetration rate to 63%, saving the operator more than 38% in associated cost for drilling the section.
The application-engineered cutting structure enabled the use of lower drilling parameters than normal, thereby improving drilling efficiency and enhancing the post-drilling dull condition from the average of 3-3-BT to 1-2-WT.
The paper shows a case study in Kuwait demonstrating the engineering and results of designing a TCI bit matched to application.
Related Results
Benchmarking Drilling Performance of PDC and Hybrid Bits in an Offshore Interbedded Environment, Based on Bit Design and Features
Benchmarking Drilling Performance of PDC and Hybrid Bits in an Offshore Interbedded Environment, Based on Bit Design and Features
Abstract
Interbedded formations are challenging to drill due to its potential to trigger torsional instability issues while drilling at low depth-of-cut (DOC), which...
Drilling Interbedded and Hard Formations with PDC Bits Considering Structural Integrity Limits
Drilling Interbedded and Hard Formations with PDC Bits Considering Structural Integrity Limits
Abstract
Although PDC bits dominate the footage drilled in the oilfield, transitions at interbedded formations and high lateral vibrations are still problematic for ...
Rock Bit Imbalance Force Prediction
Rock Bit Imbalance Force Prediction
Abstract
It is important to be able to predict the instantaneous forces and moments at the bit during drilling, but the rock/bit interaction process is not thorou...
Rock/Bit Imbalance Force Prediction
Rock/Bit Imbalance Force Prediction
Abstract
It is important to be able to predict the instantaneous forces and moments at the bit during drilling, but the rock/bit interaction process is not thorou...
Smarter, Faster, Smoother: Dual-Diameter Shaped-Cutter Bits Crush Middle East Interbeds and Torque Limits
Smarter, Faster, Smoother: Dual-Diameter Shaped-Cutter Bits Crush Middle East Interbeds and Torque Limits
Abstract
This paper addresses persistent drilling inefficiencies in the Middle East, specifically the underperformance of conventional polycrystalline diamond com...
A Coupled Axial-Torsional-Lateral Bit-Rock Interaction Model
A Coupled Axial-Torsional-Lateral Bit-Rock Interaction Model
The nonlinear interaction at the bit/rock interface is recognized as a root cause of drilling instabilities and thus plays a fundamental role in the modeling of the self-excited vi...
Real-Time Drilling Insights: Synchronous Bit Bounce for Cutter Failure Prediction
Real-Time Drilling Insights: Synchronous Bit Bounce for Cutter Failure Prediction
Abstract
As the wells become more complex, identifying the locations of critical bit wear becomes increasingly difficult. The analytical models currently used in ...
Predicting Drill Bit Remaining Useful Life and Identifying Drilling Disfunctions by Physics-Based Inversion and Data-Driven Model - Case Study of Utah Geothermal Wells
Predicting Drill Bit Remaining Useful Life and Identifying Drilling Disfunctions by Physics-Based Inversion and Data-Driven Model - Case Study of Utah Geothermal Wells
Abstract
Drilling through hot rocks in geothermal wells often leads to multiple unplanned trips due to issues such as drilling dysfunctions, thermal degradation of c...