Potentials of GIS-based analyses of Ajaokuta -Kaduna-Kano gas pipeline in Nigeria
View through CrossRef
Abstract. Geographic and Information System (GIS) Potentials and emerging technologies in overcoming topographic challenges during construction of Ajaokuta-Kaduna-Kano (AKK) gas pipeline was reviewed. The increasing utilisation of natural gas in Nigeria require development of more gas pipeline systems to increased supply with the existing gas pipeline infrastructures. Hence, in selecting a route for AKK gas pipeline construction project. This paper report on the effects of topography and probable challenges that may arise as a result of Ajaokuta Kaduna –Kano gas pipeline construction activities and solutions so as to reduce the overall rate of adverse natural gas pipeline incidents and effects on environment. The proposed Ajaokuta-Kaduna-Kano (AKK) gas pipeline is a 614 km-long being developed by the Nigerian National Petroleum Corporation (NNPC) from Ajaokuta to Kano in Nigeria. Gas pipeline routes are defined by the pipeline size(s), terrain, soil erosion, and engineering analysis requirements. Major challenges and impacts of the AKK gas pipeline includes vegetation clearing; hills and contours; loss of biodiversity; loss of farmlands, crops, migration of wildlife, soil erosion, excavation damage and corrosion. GIS Potentials and emerging technologies could address AKK gas pipeline challenges and impact through detection as a higher priority than prevention. These can be addressed through improved technologies by focusing on carrying out topographical study of the area, detection as a higher priority than prevention. Proper selection of gas pipeline routes through GIS could generally reduce potential environmental impacts associated with pipeline construction and typically minimize negative effects on conserving sensitive environments and resources.
Title: Potentials of GIS-based analyses of Ajaokuta -Kaduna-Kano gas pipeline in Nigeria
Description:
Abstract.
Geographic and Information System (GIS) Potentials and emerging technologies in overcoming topographic challenges during construction of Ajaokuta-Kaduna-Kano (AKK) gas pipeline was reviewed.
The increasing utilisation of natural gas in Nigeria require development of more gas pipeline systems to increased supply with the existing gas pipeline infrastructures.
Hence, in selecting a route for AKK gas pipeline construction project.
This paper report on the effects of topography and probable challenges that may arise as a result of Ajaokuta Kaduna –Kano gas pipeline construction activities and solutions so as to reduce the overall rate of adverse natural gas pipeline incidents and effects on environment.
The proposed Ajaokuta-Kaduna-Kano (AKK) gas pipeline is a 614 km-long being developed by the Nigerian National Petroleum Corporation (NNPC) from Ajaokuta to Kano in Nigeria.
Gas pipeline routes are defined by the pipeline size(s), terrain, soil erosion, and engineering analysis requirements.
Major challenges and impacts of the AKK gas pipeline includes vegetation clearing; hills and contours; loss of biodiversity; loss of farmlands, crops, migration of wildlife, soil erosion, excavation damage and corrosion.
GIS Potentials and emerging technologies could address AKK gas pipeline challenges and impact through detection as a higher priority than prevention.
These can be addressed through improved technologies by focusing on carrying out topographical study of the area, detection as a higher priority than prevention.
Proper selection of gas pipeline routes through GIS could generally reduce potential environmental impacts associated with pipeline construction and typically minimize negative effects on conserving sensitive environments and resources.
Related Results
Installation Analysis of Matterhorn Pipeline Replacement
Installation Analysis of Matterhorn Pipeline Replacement
Abstract
The paper describes the installation analysis for the Matterhorn field pipeline replacement, located in water depths between 800-ft to 1200-ft in the Gul...
GIS-based landscape design research
GIS-based landscape design research
Landscape design research is important for cultivating spatial intelligence in landscape architecture. This study explores GIS (geographic information systems) as a tool for landsc...
Modified FMEA quality risk management technique for cross-country petroleum pipeline using GIS
Modified FMEA quality risk management technique for cross-country petroleum pipeline using GIS
PurposeThe aim of this study is to employ the failure mode and effect analysis (FMEA) for risk management in cross-country pipelines, coupled with the utilization of Geographic Inf...
Detection of antibodies to avian leukosis virus in commercial poultry farms in Kaduna State, Northwestern Nigeria
Detection of antibodies to avian leukosis virus in commercial poultry farms in Kaduna State, Northwestern Nigeria
Objective: Since 100 years ago, the avian leukosis virus (ALV) was discovered but has remained a threat to poultry production globally, inducing neoplastic diseases of different pa...
Gas Water Deliverability Considerations
Gas Water Deliverability Considerations
Abstract
When natural gas from high pressure and temperature reservoir is produced, due to cooling of gas in wellbore tubing and in gas gathering pipelines, the a...
Pipeline Resistance
Pipeline Resistance
Pipeline resistance is where an often abstract and wonky climate movement meets the bravery and boldness of Indigenous and other frontline defenders of land and water who inspire d...
“We Own Kano and Kano Owns Us”: Politics, Place, and Identity in Independence-Era Kano
“We Own Kano and Kano Owns Us”: Politics, Place, and Identity in Independence-Era Kano
Abstract
The short period leading up to and following Nigerian independence was one of dramatic political maneuvering and change in Nigeria’s Northern Region. For mu...
Dewatering And Commissioning The Uk Central Area Transmission System (CATS) Pipeline
Dewatering And Commissioning The Uk Central Area Transmission System (CATS) Pipeline
ABSTRACT
A monoethylene glycol swabbing technique was used to successfully dewater the 36" diameter, 410 kilometer, Central Area Transmission System (CATS) gas pi...