Drilling Akpo: 22 Wells Required, 22 Wells Delivered For Production Start Up and Plateau

View through CrossRef
ABSTRACT Akpo field is located in block OML 130, 200 km offshore Nigeria in 1400 m water depth. At plateau production, Akpo produces 175,000 bbls/day of condensate and exports 320 mmscfd of gas to Bonny NLNG plant. It is the first Deep Offshore development for TOTAL in Nigeria, soon to be followed by Usan in OPL 222 and Egina in OML 130 TOTAL, with 24% interest, is the Operator on OML 130 on behalf of Petrobras of Brazil, Sapetro of Nigeria, CNOOC of China and NNPC of Nigeria. Akpo reservoirs consist in a 620 million barrels recoverable reserves of a critical fluid made of very light oil up to 53° API and classified as condensate, with wellhead shut-in pressures up to 400 bars, wellhead temperatures up to 116 °C and very high GLR (Gas Liquid Ratio). Reservoir management requires massive pressure maintenance facilities and extensive use of intelligent and selective completions. Akpo achieved first production on 4th March, 2009, ahead of schedule, and completed the ramp-up of all the facilities within only 3.5 months from the initial start-up date. The paper addresses the well construction of AKPO development from the project preparation to the production start up and in particular presentsThe leading edge deep offshore well architectures designed to meet the production objectives in such high pressure and temperature conditions.The drilling plan implemented to meet the aggressive target of 22 wells to be delivered for the production plateau.The operation support and organization put in place for the first deep offshore development drilling campaign of Total in Nigeria.The achievements, the operational difficulties and how they have been addressed, and finally the lessons learned from the first 22 well drilling phase. AKPO DEVELOPMENT Akpo plateau production is 175,000 bpd of condensates and 550 mmscfd of produced gas, with 320 mmscfd exported to Bonny NLNG plant, 220 mmscfd re-injected and the remainder used as fuel gas. Akpo is therefore a giant condensate field with estimated 620 Mbbls reserves, but also a gas field with 1Tcf planned export gas. Akpo is a standalone development based on a spread moored Floating Production Storage and Offloading (FPSO) with a storage capacity of 2 million barrels of condensate. The stabilized condensate is exported via offloading lines and a deep water buoy located 2 km away from the FPSO. A total of 44 subsea wells (22 producers, 20 water injectors, and 2 gas injectors) will be drilled in dispersed and clustered subsea architecture. In total, there are 110 km of subsea flowlines connected to the surface production facilities by 14 steel catenary risers. The subsea network comprises 4 production loops, 1 gas injection line, 4 water injection lines, 1 gas export line. It is connected from 10 manifolds installed on the seabed. The water injection wells are connected using " In Line tee?? pieces in various locations along the water injection flowlines. Akpo achieved Project sanction on 25th April, 2005 when OML 130 was awarded by the Nigerian authorities. Akpo first gas production occurred on 4th March 2009. The production plateau of 17500 bpd was reached in September 09.
Title: Drilling Akpo: 22 Wells Required, 22 Wells Delivered For Production Start Up and Plateau
Description:
ABSTRACT Akpo field is located in block OML 130, 200 km offshore Nigeria in 1400 m water depth.
At plateau production, Akpo produces 175,000 bbls/day of condensate and exports 320 mmscfd of gas to Bonny NLNG plant.
It is the first Deep Offshore development for TOTAL in Nigeria, soon to be followed by Usan in OPL 222 and Egina in OML 130 TOTAL, with 24% interest, is the Operator on OML 130 on behalf of Petrobras of Brazil, Sapetro of Nigeria, CNOOC of China and NNPC of Nigeria.
Akpo reservoirs consist in a 620 million barrels recoverable reserves of a critical fluid made of very light oil up to 53° API and classified as condensate, with wellhead shut-in pressures up to 400 bars, wellhead temperatures up to 116 °C and very high GLR (Gas Liquid Ratio).
Reservoir management requires massive pressure maintenance facilities and extensive use of intelligent and selective completions.
Akpo achieved first production on 4th March, 2009, ahead of schedule, and completed the ramp-up of all the facilities within only 3.
5 months from the initial start-up date.
The paper addresses the well construction of AKPO development from the project preparation to the production start up and in particular presentsThe leading edge deep offshore well architectures designed to meet the production objectives in such high pressure and temperature conditions.
The drilling plan implemented to meet the aggressive target of 22 wells to be delivered for the production plateau.
The operation support and organization put in place for the first deep offshore development drilling campaign of Total in Nigeria.
The achievements, the operational difficulties and how they have been addressed, and finally the lessons learned from the first 22 well drilling phase.
AKPO DEVELOPMENT Akpo plateau production is 175,000 bpd of condensates and 550 mmscfd of produced gas, with 320 mmscfd exported to Bonny NLNG plant, 220 mmscfd re-injected and the remainder used as fuel gas.
Akpo is therefore a giant condensate field with estimated 620 Mbbls reserves, but also a gas field with 1Tcf planned export gas.
Akpo is a standalone development based on a spread moored Floating Production Storage and Offloading (FPSO) with a storage capacity of 2 million barrels of condensate.
The stabilized condensate is exported via offloading lines and a deep water buoy located 2 km away from the FPSO.
A total of 44 subsea wells (22 producers, 20 water injectors, and 2 gas injectors) will be drilled in dispersed and clustered subsea architecture.
In total, there are 110 km of subsea flowlines connected to the surface production facilities by 14 steel catenary risers.
The subsea network comprises 4 production loops, 1 gas injection line, 4 water injection lines, 1 gas export line.
It is connected from 10 manifolds installed on the seabed.
The water injection wells are connected using " In Line tee?? pieces in various locations along the water injection flowlines.
Akpo achieved Project sanction on 25th April, 2005 when OML 130 was awarded by the Nigerian authorities.
Akpo first gas production occurred on 4th March 2009.
The production plateau of 17500 bpd was reached in September 09.

Related Results

AKPO: A Giant Deep Offshore Development
AKPO: A Giant Deep Offshore Development
ABSTRACT Since TOTAL Girassol in Angola, the world first deep water project ever, deep offshore developments have become more common place but all of them had and...
AKPO Project Start-Up and Operation
AKPO Project Start-Up and Operation
ABSTRACT Akpo field is located in block OML 130, 200 km offshore Nigeria in 1400 m water depth. At plateau production, Akpo produces 175,000 bbls/day of condensat...
AKPO: A Giant Deep Offshore Development
AKPO: A Giant Deep Offshore Development
Summary All deep water offshore projects are challenging. They are large developments, difficult to implement and often beyond the limits of proven technologies at t...
Akpo Project: The Successful Implementation of Steel Catenary Risers
Akpo Project: The Successful Implementation of Steel Catenary Risers
Abstract After Bonga and Erha, Akpo is the third SCR network installed and the largest in term of numbers of risers in deep offshore Nigeria. The paper explains w...
Casing Drilling with Retrievable Drilling Assemblies
Casing Drilling with Retrievable Drilling Assemblies
Abstract Retrievable Casing Drilling* tools have been used to drill more than 600,000 ft of hole in over 120 wells encompassing six casing sizes ranging from 4-1/...
Planning Drilling Fluid Programs in Southeast Asia
Planning Drilling Fluid Programs in Southeast Asia
Planning the drilling fluids program is one of the most important steps in Planning the drilling fluids program is one of the most important steps in preparation for the drilling o...
Drilling Variables At Technical Limit Of Drilling Rate
Drilling Variables At Technical Limit Of Drilling Rate
Abstract Recorded drilling times may show significant variations from well to well even for the same total depth in the same field. Apart from the formation chara...
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Drilling in deeper formations and in high pressure and high temperature (HPHT) environments is a new frontier for the oil industry. Fifty years ago, no one would have imagined dril...

Back to Top