Abstract
In Yibal, a mature oil field in Oman, a number of optimisations have been implemented as a result of constantly challenging historically accepted procedures and by aligning the objectives of PDO, the Drilling Contractor and Service Contractors through the use of incentives. Although these may not include any step changes in technology, in combination they have realised a 25% reduction in drilling costs over a 2 year period (see fig. 1).
Introduction
The Yibal field, situated in the desert of North Oman, was discovered in 1962. The main oil reservoir is located within the Upper Shuaiba formation at 1370m TVD. The oil column attains a maximum thickness of 100 m with no primary gascap present and hydrostatic pressures. The STOIIP is estimated at 550 million m3 with an expected ultimate recovery factor of 55 %.
Since coming on production in the early 1970's the field has produced approximately half of its ultimate recoverable reserves but it is still responsible for almost one third of the current production target of 135,000 m3/day.
Since the middle of 1994 additional horizontal drainage points in the field have been provided by drilling side-tracks instead of new wells (see figure 1), and with 438 wells present in Yibal and the rapid production rate decline there are many side-track candidates available. Any new Yibal well requires 5 or 6 casing strings (due to the presence of shallow gas, artesian flow, requirement for sweet aquifer isolation, and isolation of a gas reservoir) and costs in the order of US$ 1.6 million with an average duration of 30 days. In comparison, a side-track takes on average 18 days and costs just under US$ 1.0 million. In the first half of 1996, 15 horizontal sidetracks were drilled, each producing initially 500-1000 m3/day.
Although the wells are shallow their complexity is increased by the horizontal design and the frequent presence of total losses and unstable shales. In this environment of repetitive but complex and very intensive work, it is a continuous challenge to obtain increased optimisation of the drilling operation. However this challenge must be undertaken in order to reduce or even maintain the UTC per barrel of oil for PDO.
Title: Drilling Optimisations in Yibal Field, Oman
Description:
Abstract
In Yibal, a mature oil field in Oman, a number of optimisations have been implemented as a result of constantly challenging historically accepted procedures and by aligning the objectives of PDO, the Drilling Contractor and Service Contractors through the use of incentives.
Although these may not include any step changes in technology, in combination they have realised a 25% reduction in drilling costs over a 2 year period (see fig.
1).
Introduction
The Yibal field, situated in the desert of North Oman, was discovered in 1962.
The main oil reservoir is located within the Upper Shuaiba formation at 1370m TVD.
The oil column attains a maximum thickness of 100 m with no primary gascap present and hydrostatic pressures.
The STOIIP is estimated at 550 million m3 with an expected ultimate recovery factor of 55 %.
Since coming on production in the early 1970's the field has produced approximately half of its ultimate recoverable reserves but it is still responsible for almost one third of the current production target of 135,000 m3/day.
Since the middle of 1994 additional horizontal drainage points in the field have been provided by drilling side-tracks instead of new wells (see figure 1), and with 438 wells present in Yibal and the rapid production rate decline there are many side-track candidates available.
Any new Yibal well requires 5 or 6 casing strings (due to the presence of shallow gas, artesian flow, requirement for sweet aquifer isolation, and isolation of a gas reservoir) and costs in the order of US$ 1.
6 million with an average duration of 30 days.
In comparison, a side-track takes on average 18 days and costs just under US$ 1.
0 million.
In the first half of 1996, 15 horizontal sidetracks were drilled, each producing initially 500-1000 m3/day.
Although the wells are shallow their complexity is increased by the horizontal design and the frequent presence of total losses and unstable shales.
In this environment of repetitive but complex and very intensive work, it is a continuous challenge to obtain increased optimisation of the drilling operation.
However this challenge must be undertaken in order to reduce or even maintain the UTC per barrel of oil for PDO.
Related Results
Drilling Variables At Technical Limit Of Drilling Rate
Drilling Variables At Technical Limit Of Drilling Rate
Abstract
Recorded drilling times may show significant variations from well to well even for the same total depth in the same field. Apart from the formation chara...
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Drilling in deeper formations and in high pressure and high temperature (HPHT) environments is a new frontier for the oil industry. Fifty years ago, no one would have imagined dril...
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Abstract
Pit less Drilling technology is a technology that eliminates the requirement for earthen pits or sumps to capture waste fluid. In this paper we will examine...
Planning Drilling Fluid Programs in Southeast Asia
Planning Drilling Fluid Programs in Southeast Asia
Planning the drilling fluids program is one of the most important steps in Planning the drilling fluids program is one of the most important steps in preparation for the drilling o...
Casing Drilling with Retrievable Drilling Assemblies
Casing Drilling with Retrievable Drilling Assemblies
Abstract
Retrievable Casing Drilling* tools have been used to drill more than 600,000 ft of hole in over 120 wells encompassing six casing sizes ranging from 4-1/...
Numerical Modelling of Cuttings Transport With Foam in Inclined Wells
Numerical Modelling of Cuttings Transport With Foam in Inclined Wells
Abstract
In this study, a 1-D transient state mechanistic model of cuttings transport with foam in inclined wells has been developed. The model is solved numerica...
STUDY OF THE DYNAMİCS OF THE İMPACT OF DRİLLİNG FLUİD SLURRY ON THE WELL
BOTTOM
STUDY OF THE DYNAMİCS OF THE İMPACT OF DRİLLİNG FLUİD SLURRY ON THE WELL
BOTTOM
Currently, the study of the effect of drilling fluid slurry on the well bottom during the drilling of oil and gas wells remains one of the urgent problems in the center of attentio...
Introduction of Game-changing Drilling Technology
Introduction of Game-changing Drilling Technology
SPE/IADC Member
Abstract
This paper describes the structured process of drilling technology introduction in Petroleum Developmen...