On-Line Subsea Multiphase Flow Measurement

View through CrossRef
Abstract This paper describes the final detailed design, engineering, and installation phase of a Joint Industry Programme to qualify a robust subsea multiphase flowmeter module for long-terminstallation on a North Sea manifold tie-in. Multiphase subsea production has become a common method of hydrocardon recovery in all areas of offshore E and P. In the North Sea, many developments are subsea satellites with multiphase well-fluids being commingled prior to processing. The system described meets this challenge by offering a cost effective solution to real-time well monitoring asan alternative to the conventional test separator, removing the need for test lines and shutting in wells for testing. The multiphase instrument allows on-line ell fluid analysis, and is also an important tool forreservoir management and field analysis, and provides a means of implementing field allocationmetering thereby simplifying small/marginal field developments. This project is one of the first subsea multiphase flowmeter installations engineered for long-term subsea service, and designed as an integratedcomponent of the subsea production control system. Introduction The long term objective of this development is to demonstrate the effectiveness of subsea multiphase measurement. Amerada Hess United (AHL) is committed to the develoment of new technology to support and enhance its business activities of locating, developing and producing offshore hydrocarbon resources. To this end AHL have launched a Business Driven New Technology Initiative which seeks to identify key technology requirements, to initiate R&D projects, to fulfill them, and to ensure that the results are commercially exploited. Amongst the spearhead areas are health and safety, the environment, drilling costs, mini-field developments, reservoir characterization and performance, and geological basin modeling. This project is to run concurrently with the South Scott Development, which includes a production control system for installation in May 1995. The subsea multiphase flowmeter will be installed on the South Scott manifold, and will provide on-line well fluid analysis for up to four producing wells. The financing for this project has been led by Amerada Hess Norge, with Amerada Hess (UK) Ltd contributing project co-ordination and monitoring. Further project funding has been made by Kvaerner FSSL Ltd. This joint industry approach has been made to establish a commercially viable solution to real-time multiphase metering based on a leading instrument technology, the Ruenta MPFM1900. The project has been conducted in three phases. Phase 1 was completed in 1992. ref 1. This involved the purchase and testing of a basic fraction meter version of the device. The meter was installed and tested in the new independent 3-phase laboratory at the National Engineering Laboratory (NEL) in East Kilbride, near Glasgow. The aims of Phase 1 were to prove the integrity of the technology, and determine by experimentation the application limitations of the instrument. This was successfully completed. A great deal of time and effort was invested at this stage into modeling real flow conditions on the test skid. The NEL team and the industrial collaborators are extremely satisfied with the results so obtained.
Title: On-Line Subsea Multiphase Flow Measurement
Description:
Abstract This paper describes the final detailed design, engineering, and installation phase of a Joint Industry Programme to qualify a robust subsea multiphase flowmeter module for long-terminstallation on a North Sea manifold tie-in.
Multiphase subsea production has become a common method of hydrocardon recovery in all areas of offshore E and P.
In the North Sea, many developments are subsea satellites with multiphase well-fluids being commingled prior to processing.
The system described meets this challenge by offering a cost effective solution to real-time well monitoring asan alternative to the conventional test separator, removing the need for test lines and shutting in wells for testing.
The multiphase instrument allows on-line ell fluid analysis, and is also an important tool forreservoir management and field analysis, and provides a means of implementing field allocationmetering thereby simplifying small/marginal field developments.
This project is one of the first subsea multiphase flowmeter installations engineered for long-term subsea service, and designed as an integratedcomponent of the subsea production control system.
Introduction The long term objective of this development is to demonstrate the effectiveness of subsea multiphase measurement.
Amerada Hess United (AHL) is committed to the develoment of new technology to support and enhance its business activities of locating, developing and producing offshore hydrocarbon resources.
To this end AHL have launched a Business Driven New Technology Initiative which seeks to identify key technology requirements, to initiate R&D projects, to fulfill them, and to ensure that the results are commercially exploited.
Amongst the spearhead areas are health and safety, the environment, drilling costs, mini-field developments, reservoir characterization and performance, and geological basin modeling.
This project is to run concurrently with the South Scott Development, which includes a production control system for installation in May 1995.
The subsea multiphase flowmeter will be installed on the South Scott manifold, and will provide on-line well fluid analysis for up to four producing wells.
The financing for this project has been led by Amerada Hess Norge, with Amerada Hess (UK) Ltd contributing project co-ordination and monitoring.
Further project funding has been made by Kvaerner FSSL Ltd.
This joint industry approach has been made to establish a commercially viable solution to real-time multiphase metering based on a leading instrument technology, the Ruenta MPFM1900.
The project has been conducted in three phases.
Phase 1 was completed in 1992.
ref 1.
This involved the purchase and testing of a basic fraction meter version of the device.
The meter was installed and tested in the new independent 3-phase laboratory at the National Engineering Laboratory (NEL) in East Kilbride, near Glasgow.
The aims of Phase 1 were to prove the integrity of the technology, and determine by experimentation the application limitations of the instrument.
This was successfully completed.
A great deal of time and effort was invested at this stage into modeling real flow conditions on the test skid.
The NEL team and the industrial collaborators are extremely satisfied with the results so obtained.

Related Results

Implementation of multiphase metering on unmanned wellhead platform
Implementation of multiphase metering on unmanned wellhead platform
Abstract In 1997 TotalFinaElf installed a multiphase meter on an offshore unmanned wellhead platform in the Middle East. The decision to go for the multiphase met...
MMS 1200: Cooperation on a Subsea Multiphase Flow Meter Application
MMS 1200: Cooperation on a Subsea Multiphase Flow Meter Application
Abstract PETROBRAS (Brazil) and FLIJENTA (Norway and USA) are since beginning of 1996 working on this multiphase flow metering route development under a Technolog...
Subsea Factory–Standardization of the Brownfield Factory
Subsea Factory–Standardization of the Brownfield Factory
Abstract As part of the corporate technology strategy Statoil has launched a technology plan for the Subsea Factory concept. The plan describes how to combine subsea...
Technology Focus: Subsea Systems (August 2025)
Technology Focus: Subsea Systems (August 2025)
_ From a broader and high-level perspective—considering importance, impact, significance, and criticality—subsea systems and advanced offshore engineering play an...
Simple Subsea Trees for Shallow Water: An Economical Alternative
Simple Subsea Trees for Shallow Water: An Economical Alternative
Abstract Simple, diver assisted subsea completions have been installed and operated successfully in many shallow water oil fields around the world. Although these...
Ormen Lange Subsea Production System
Ormen Lange Subsea Production System
Abstract This paper presents the concept and the technical solutions developed and applied to the Ormen Lange subsea production system. First, the key technical c...
Multiphase Flow Measurement Using Multiple Energy Gamma Ray Absorption (MEGRA) Composition Measurement
Multiphase Flow Measurement Using Multiple Energy Gamma Ray Absorption (MEGRA) Composition Measurement
Abstract Some multiphase flowmeters use the principle of Dual Energy Gamma Ray Absorption (DEGRA) composition measurement to determine the individual water, oil a...
Multiphase Flow Metering:An Evaluation of Discharge Coefficients
Multiphase Flow Metering:An Evaluation of Discharge Coefficients
Abstract The orifice discharge coefficient (CD) is the constant required to correct theoretical flow rate to actual flow rate. It is known that single phase orifi...