Enhanced Life Cycle Costing Approach to Tubing Material Selection - New Cost and Revenue Drivers Identified from Experience with Non-Metallics Downhole

View through CrossRef
Abstract ISO 15663 Lifecycle cost (LCC) analysis principles are commonly applied to evaluate the viability of downhole tubing materials. This includes the initial CAPEX, operating or maintenance OPEX, Replacement costs and Revenue impact of tubing failure. Increased implementation of Glass Re-informed Epoxy (GRE) Lined tubing has provided significant evidence of flow assurance benefits of the system. This paper will present a modern adaptation of LCC analysis based on operator data and quantification of these benefits and savings. With over 100,000 GRE Lined completions worldwide there are numerous reported cases of flow enhancements and savings besides corrosion mitigation. The paper is based on extensive research of data collected with agreement from operators representing cost savings or additional revenue that can be factored into LCC analyses with a fair degree of accuracy. Overall operational savings that operators have derived from flow assurance benefits of GRE Lined Tubing, such as improved thermodynamics, scale mitigation, reduced pressure drop, etc. are substantiated using field data from downhole logs, analysis of produced fluids and inspection of retrieved GRE Lined tubing. Operators have reported higher temperature at well head in Oil Producers after steel tubing was replaced using GRE Lined Steel tubing. This has been associated with savings in separation costs at the surface. There are several reports of higher flow rates and reduced pressure drop across GRE lined tubing which translates to higher injectivity or production. Operators have numerous references of improved and stable flow rates for longer durations when compared to bare steel tubing due to the mitigation of carbonate scale deposition which would impact flow dynamics. Such cases represent significant improvements to production efficiency and, consequently, the overall return on investment in the asset. The findings of research on multiple operator flow enhancement case references, while implementing GRE Lined Tubing, are illustrated graphically to represent savings and/or additional revenue in comparison with graphical representations of traditional LCC calculations models based on ISO 15663 key drivers i.e. CAPEX, OPEX, Revenue Impact and Replacement Costs. It is anticipated that this paper will influence a paradigm shift that guides operators to consider the impact of flow enhancement, improved thermodynamics, improved injectivity and/or production, simplification of surface facility requirements and other fringe benefits, in addition to CAPEX, OPEX and Revenue, while evaluating the LCC of tubing material alternatives.
Title: Enhanced Life Cycle Costing Approach to Tubing Material Selection - New Cost and Revenue Drivers Identified from Experience with Non-Metallics Downhole
Description:
Abstract ISO 15663 Lifecycle cost (LCC) analysis principles are commonly applied to evaluate the viability of downhole tubing materials.
This includes the initial CAPEX, operating or maintenance OPEX, Replacement costs and Revenue impact of tubing failure.
Increased implementation of Glass Re-informed Epoxy (GRE) Lined tubing has provided significant evidence of flow assurance benefits of the system.
This paper will present a modern adaptation of LCC analysis based on operator data and quantification of these benefits and savings.
With over 100,000 GRE Lined completions worldwide there are numerous reported cases of flow enhancements and savings besides corrosion mitigation.
The paper is based on extensive research of data collected with agreement from operators representing cost savings or additional revenue that can be factored into LCC analyses with a fair degree of accuracy.
Overall operational savings that operators have derived from flow assurance benefits of GRE Lined Tubing, such as improved thermodynamics, scale mitigation, reduced pressure drop, etc.
are substantiated using field data from downhole logs, analysis of produced fluids and inspection of retrieved GRE Lined tubing.
Operators have reported higher temperature at well head in Oil Producers after steel tubing was replaced using GRE Lined Steel tubing.
This has been associated with savings in separation costs at the surface.
There are several reports of higher flow rates and reduced pressure drop across GRE lined tubing which translates to higher injectivity or production.
Operators have numerous references of improved and stable flow rates for longer durations when compared to bare steel tubing due to the mitigation of carbonate scale deposition which would impact flow dynamics.
Such cases represent significant improvements to production efficiency and, consequently, the overall return on investment in the asset.
The findings of research on multiple operator flow enhancement case references, while implementing GRE Lined Tubing, are illustrated graphically to represent savings and/or additional revenue in comparison with graphical representations of traditional LCC calculations models based on ISO 15663 key drivers i.
e.
CAPEX, OPEX, Revenue Impact and Replacement Costs.
It is anticipated that this paper will influence a paradigm shift that guides operators to consider the impact of flow enhancement, improved thermodynamics, improved injectivity and/or production, simplification of surface facility requirements and other fringe benefits, in addition to CAPEX, OPEX and Revenue, while evaluating the LCC of tubing material alternatives.

Related Results

Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Abstract This paper provides in-depth analysis of a low-cost solution to economically sustain production and avoid high workover costs. This paper conducts the techn...
Jointed Tubing Injector Snubbing on Extended Reach Wells
Jointed Tubing Injector Snubbing on Extended Reach Wells
Abstract OBJECTIVE / SCOPE An injector has been developed that is able to continuously move conventional jointed tubing in and o...
Effects of Buckled Tubing on Coiled Tubing Passibility
Effects of Buckled Tubing on Coiled Tubing Passibility
Abstract Many coiled tubing(CT) operations involve passage through the production tubing. However, due to the adverse wellbore trajectory or tubing geometries, espec...
Distinctive Well Intervention Integrated Solutions Realizing Idle Well Potential in North Sabah
Distinctive Well Intervention Integrated Solutions Realizing Idle Well Potential in North Sabah
Abstract The South Furious field located in the Sabah Inboard Basin, in the South China Sea consists of thin, laminated sandstone reservoirs, plagued by sand product...
Intervention in Wells with Buckled Production Tubing
Intervention in Wells with Buckled Production Tubing
Abstract Sometimes the production tubing in a well can be helically buckled due to problems with the completion design, completion hardware, or installation probl...
Prebending Coiled Tubing and Its Fatigue Life Prediction
Prebending Coiled Tubing and Its Fatigue Life Prediction
Coiled tubing is widely used in oil drilling and production operations. However, extreme high stress variation of coiled tubing during the processes of pulling out, rolling in the ...

Back to Top