How Saudi Aramco Harnesses Technology at Manifa Field Megaproject

View through CrossRef
Manifa Field Saudi Aramco says its Manifa field is an example of how it is combining its technology and innovation capabilities to develop one of the most challenging megaprojects in the history of the company. Measuring approximately 45 km in length and 18 km in width, the Manifa field in Saudi Arabia is considered the fifth largest oil field in the world. It was discovered in 1957 with first sustained production in 1964. By 1977, 17 wells had been drilled, mostly offshore. Because of poor demand, the field was mothballed in 1984. But in 2006, a grassroots field redevelopment plan kicked off with major capital spending, and drilling and development started in 2010. The field was successfully put back into production in April 2013, three months ahead of schedule, and the field achieved 500,000 BOPD by July 2013. By the time the field reaches its full potential at the end of the year, the Manifa field will have the capacity to produce 900,000 BOPD of Arabian heavy crude, 90 MMscf/D of gas, and 65,000 B/D of condensate. The project consists of 42 km of causeways, 3 km of bridges, 27 drilling islands, 13 offshore platforms, 15 onshore drilling islands, water supply wells, injection facilities, multiple pipelines, and a 420-MW heat and electricity plant. Shifting Strategy As Saudi Aramco aims to push forward from its traditional role as a buyer and consumer of technology to an enabler and creator of new technologies—its new global technology and R&D strategy—the company has introduced several technologies during the development of Manifa. The Manifa crude oil increment has been a monumental achievement in the company’s history in terms of production, technology, and manpower, said Shadi Hanbzazah, supervisor at the Manifa production engineering unit. Saudi Aramco combined onshore and offshore development and a causeway in a single project. Water depths are between 4m and 6m. To adequately cover operations in the field, 27 man-made islands were developed and connected by a causeway. “The field development strategy was aimed to transform the field from being 70% offshore field development to 70% onshore field development through the creation of 27 man-made islands, each the size of 10 soccer fields, connected with 41 km of causeway while 13 offshore platforms were installed for the field’s deeper water locations,” said Hanbzazah. The field’s geography in the shallow waters of the Arabian Gulf ’s fragile ecology required unique, environmentally friendly access solutions involving a novel causeway design linking drilling islands. “We collaborated with both local and international academic institutions to optimize the design of the Manifa causeway,” said Khaled A. Al-Buraik, vice president of engineering and development at Saudi Aramco. “The Arabian Gulf was studied taking into account numerous environmental considerations to minimize traffic in shallow waters and allow natural marine growth. The design mapped and considered coral reef for formations and the habitats of marine life.” Although a major driver for the causeway concept for the Manifa development was to improve project economics, carefully placing the artificial islands on the Gulf also helped ensure a minimum environmental footprint. As a result, the Manifa field became the largest extended-reach hydrocarbon producer project in the world. “Thus, Manifa contains the largest number of extended- reach wells (ERWs) as two-thirds of the wells in the field are ERWs by industry standards, some with a total depth of 37,000 ft, departing beyond 26,000 ft from surface locations,” said Hanbzazah.
Society of Petroleum Engineers (SPE)
Title: How Saudi Aramco Harnesses Technology at Manifa Field Megaproject
Description:
Manifa Field Saudi Aramco says its Manifa field is an example of how it is combining its technology and innovation capabilities to develop one of the most challenging megaprojects in the history of the company.
Measuring approximately 45 km in length and 18 km in width, the Manifa field in Saudi Arabia is considered the fifth largest oil field in the world.
It was discovered in 1957 with first sustained production in 1964.
By 1977, 17 wells had been drilled, mostly offshore.
Because of poor demand, the field was mothballed in 1984.
But in 2006, a grassroots field redevelopment plan kicked off with major capital spending, and drilling and development started in 2010.
The field was successfully put back into production in April 2013, three months ahead of schedule, and the field achieved 500,000 BOPD by July 2013.
By the time the field reaches its full potential at the end of the year, the Manifa field will have the capacity to produce 900,000 BOPD of Arabian heavy crude, 90 MMscf/D of gas, and 65,000 B/D of condensate.
The project consists of 42 km of causeways, 3 km of bridges, 27 drilling islands, 13 offshore platforms, 15 onshore drilling islands, water supply wells, injection facilities, multiple pipelines, and a 420-MW heat and electricity plant.
Shifting Strategy As Saudi Aramco aims to push forward from its traditional role as a buyer and consumer of technology to an enabler and creator of new technologies—its new global technology and R&D strategy—the company has introduced several technologies during the development of Manifa.
The Manifa crude oil increment has been a monumental achievement in the company’s history in terms of production, technology, and manpower, said Shadi Hanbzazah, supervisor at the Manifa production engineering unit.
Saudi Aramco combined onshore and offshore development and a causeway in a single project.
Water depths are between 4m and 6m.
To adequately cover operations in the field, 27 man-made islands were developed and connected by a causeway.
“The field development strategy was aimed to transform the field from being 70% offshore field development to 70% onshore field development through the creation of 27 man-made islands, each the size of 10 soccer fields, connected with 41 km of causeway while 13 offshore platforms were installed for the field’s deeper water locations,” said Hanbzazah.
The field’s geography in the shallow waters of the Arabian Gulf ’s fragile ecology required unique, environmentally friendly access solutions involving a novel causeway design linking drilling islands.
“We collaborated with both local and international academic institutions to optimize the design of the Manifa causeway,” said Khaled A.
Al-Buraik, vice president of engineering and development at Saudi Aramco.
“The Arabian Gulf was studied taking into account numerous environmental considerations to minimize traffic in shallow waters and allow natural marine growth.
The design mapped and considered coral reef for formations and the habitats of marine life.
” Although a major driver for the causeway concept for the Manifa development was to improve project economics, carefully placing the artificial islands on the Gulf also helped ensure a minimum environmental footprint.
As a result, the Manifa field became the largest extended-reach hydrocarbon producer project in the world.
“Thus, Manifa contains the largest number of extended- reach wells (ERWs) as two-thirds of the wells in the field are ERWs by industry standards, some with a total depth of 37,000 ft, departing beyond 26,000 ft from surface locations,” said Hanbzazah.

Related Results

Environmentally Friendly Manifa Field Development — The World’s Largest
Environmentally Friendly Manifa Field Development — The World’s Largest
Abstract The Manifa field development is a megaproject, the world's largest offshore hydrocarbon production increment built in a single phase. Manifa is the world...
Saudi Arabia's Manifa Offshore Field Development: The Role of Technology
Saudi Arabia's Manifa Offshore Field Development: The Role of Technology
This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper OTC 25119, ’Saudi Arabia's Manifa Giant Offshore Field Development: The Role of Technol...
Manifa Oil Field Development Program – Onshore And Offshore Shallow Water Development
Manifa Oil Field Development Program – Onshore And Offshore Shallow Water Development
Abstract The Manifa Oil Field is located approximately 200 km northwest of Dhahran and lies mainly offshore in shallow waters. The field was discovered in 1957, and ...
Implementation of Saudi Aramco's SDGS to Preserve the Environment in Meeting Global Energy Needs
Implementation of Saudi Aramco's SDGS to Preserve the Environment in Meeting Global Energy Needs
The Sustainable Development Goals (SDGs) have become a key guide for global organisations to preserve the environment while meeting global energy needs. Saudi Aramco, one of the wo...
Comparison of Distribution Procedures in Blended Finance
Comparison of Distribution Procedures in Blended Finance
This paper is devoted to the blended (joint) finance mechanism of a megaproject consisting of several projects. One part of the megaproject budget comes from the megaproject manage...
An overview on megaproject management systems
An overview on megaproject management systems
Purpose There is a large amount of published literature on project management. However, there exists a gap between the existing literatu...
Private 5G Practice in Oil and Gas Industry
Private 5G Practice in Oil and Gas Industry
Abstract The Kingdom of Saudi Arabia has taken active steps to adopt cutting-edge technologies such as artificial intelligence (AI), Cloud, 5G, 3D printing, robotics...
Saudi Arabia's Giant Manifa Oilfield Development: Lessons from Integrating Technologies
Saudi Arabia's Giant Manifa Oilfield Development: Lessons from Integrating Technologies
Abstract Discrete technology solutions, such as real time data acquisition, distributed temperature sensing, etc. applied on selected-well basis seem to serve fie...