Research on DC component decay time constant of 1000 kV AC filter circuit breakers in UHV converter station
View through CrossRef
In hierarchically connected UHV DC projects, the 1000 kV AC filter sub‐bank in converter station is provided with two 500 kV circuit breakers. To determine the test DC component decay time constant when breakers break short‐circuit current, relevant DC project was modelled in electromagnetic transient program (EMTP) for calculations. It is pointed out that for UHV AC filter circuit breakers, the decay time constant of DC component of short‐circuit current should be determined solely based on the single‐phase to earth fault current. Calculations and analyses were made of the AC and DC components and the DC component decay time constant of filter single‐phase to earth fault current, and the time constant calculated was converted to the test value of breakers with rated short‐circuit breaking current of 63 kA. According to the research results, a time constant of 75 or 90 ms is recommended for the two 500 kV circuit breakers, and it is lower than 120 ms as required by the relevant standards, providing technical support for future breaker tests.
Institution of Engineering and Technology (IET)
Title: Research on DC component decay time constant of 1000 kV AC filter circuit breakers in UHV converter station
Description:
In hierarchically connected UHV DC projects, the 1000 kV AC filter sub‐bank in converter station is provided with two 500 kV circuit breakers.
To determine the test DC component decay time constant when breakers break short‐circuit current, relevant DC project was modelled in electromagnetic transient program (EMTP) for calculations.
It is pointed out that for UHV AC filter circuit breakers, the decay time constant of DC component of short‐circuit current should be determined solely based on the single‐phase to earth fault current.
Calculations and analyses were made of the AC and DC components and the DC component decay time constant of filter single‐phase to earth fault current, and the time constant calculated was converted to the test value of breakers with rated short‐circuit breaking current of 63 kA.
According to the research results, a time constant of 75 or 90 ms is recommended for the two 500 kV circuit breakers, and it is lower than 120 ms as required by the relevant standards, providing technical support for future breaker tests.
Related Results
PERUBAHAN SUHU LINGKUNGAN TERHADAP WAKTU TRIP PADA MINI CIRCUIT BREAKER 6A TIPE C
PERUBAHAN SUHU LINGKUNGAN TERHADAP WAKTU TRIP PADA MINI CIRCUIT BREAKER 6A TIPE C
ABSTRACT
The purpose of this research is to know about the effect of current rate increasing and ambient temperature change on tripping time miniature circuit breakers 6A typ...
Blunt Chest Trauma and Chylothorax: A Systematic Review
Blunt Chest Trauma and Chylothorax: A Systematic Review
Abstract
Introduction: Although traumatic chylothorax is predominantly associated with penetrating injuries, instances following blunt trauma, as a rare and challenging condition, ...
CFD Simulation and Optimization of a Cake Filtration System
CFD Simulation and Optimization of a Cake Filtration System
Abstract
This study presents a simulation of filter cake formation during the filtration of rice hull ash and liquid mixture using ANSYS Fluent software. Filter cake...
Design and Simulation Converter with Buck-boost Converter as The Voltage Stabilizer
Design and Simulation Converter with Buck-boost Converter as The Voltage Stabilizer
Buck-boost Converter is the device with the function to convert DC Voltage input to the setpoint DC Voltage output. Buck-boost converter can be used for regulating unstable voltage...
Research on overvoltage and minimum air clearance on 1000 kV AC side of converter transformer in ±1100 kV Guquan converter station
Research on overvoltage and minimum air clearance on 1000 kV AC side of converter transformer in ±1100 kV Guquan converter station
In the hierarchically connected ultra‐high voltage (UHV) DC projects, the minimum air clearance on the 1000 kV AC side of converter transformer directly affects the layout and area...
Katalis Plat Kuningan Berbentuk Sarang Lebah untuk Mengurangi Emisi Kendaraan Bermotor
Katalis Plat Kuningan Berbentuk Sarang Lebah untuk Mengurangi Emisi Kendaraan Bermotor
Meningkatnya jumlah kendaraan bermotor berdampak langsung terhadap pencemaran udara akibat gas buang. Pencemaran udara di perkotaan didominasi oleh emisi kendaraan bermotor, disert...
Design of Buck Converter Based on Maximum Power Point Tracking for Photovoltaic Applications
Design of Buck Converter Based on Maximum Power Point Tracking for Photovoltaic Applications
e MPPT converter ensures that the PV system operates at the maximum power point, which is the point where the solar panels can generate the most power. This is done by adjusting th...
Evaluation of decay times in coupled spaces: Bayesian decay model selection
Evaluation of decay times in coupled spaces: Bayesian decay model selection
This paper applies Bayesian probability theory to determination of the decay times in coupled spaces. A previous paper [N. Xiang and P. M. Goggans, J. Acoust. Soc. Am. 110, 1415–14...