Javascript must be enabled to continue!
A Study on the Risk Probability of Risk Mitigation Alternatives at Non-Compliance Airport with Runway Strip Criteria
View through CrossRef
A runway strip is defined as the surface surrounding a runway established or suitable for reducing the risk of damage to aircraft in the event of a runway excursion. This study aims to implement the RSARA and LRSARA models at an airport not meeting the runway strip dimension criteria required by standards for aerodrome physical characteristics. The airport is considering alternatives to secure the runway strip criteria such as the displaced threshold and runway length extension, which is predicted to reduce the runway excursion probability. As the results of this study, it was discovered that the risk probability increases with the increases of the displaced runway distance due to relatively reduced runway length. Therefore, a reduced runway length to meet runway strip criteria may not be the most effective risk mitigation alternative, and it should be acknowledged that such a strategy can harm aviation Safety.
Taiwan Association of Engineering and Technology Innovation
Title: A Study on the Risk Probability of Risk Mitigation Alternatives at Non-Compliance Airport with Runway Strip Criteria
Description:
A runway strip is defined as the surface surrounding a runway established or suitable for reducing the risk of damage to aircraft in the event of a runway excursion.
This study aims to implement the RSARA and LRSARA models at an airport not meeting the runway strip dimension criteria required by standards for aerodrome physical characteristics.
The airport is considering alternatives to secure the runway strip criteria such as the displaced threshold and runway length extension, which is predicted to reduce the runway excursion probability.
As the results of this study, it was discovered that the risk probability increases with the increases of the displaced runway distance due to relatively reduced runway length.
Therefore, a reduced runway length to meet runway strip criteria may not be the most effective risk mitigation alternative, and it should be acknowledged that such a strategy can harm aviation Safety.
Related Results
Theoretical study of laser-cooled SH<sup>–</sup> anion
Theoretical study of laser-cooled SH<sup>–</sup> anion
The potential energy curves, dipole moments, and transition dipole moments for the <inline-formula><tex-math id="M13">\begin{document}${{\rm{X}}^1}{\Sigma ^ + }$\end{do...
Analisis Field Performance Pesawat Airbus A350-Xwb pada Beberapa Bandar Udara di Wilayah Yaman
Analisis Field Performance Pesawat Airbus A350-Xwb pada Beberapa Bandar Udara di Wilayah Yaman
Performa tinggal landas dan mendarat merupakan aspek penting dalam pengoperasian pesawat terbang, terutama terkait kebutuhan panjang landasan (runway requirement). Faktor-faktor se...
Multi-Airport System Development Model: Case Study of Airports in Indonesia
Multi-Airport System Development Model: Case Study of Airports in Indonesia
Indonesia's air transportation business has grown substantially to suit the community's transportation needs. An increasing number of people travel by airline each year. By way of ...
Runway Strength Analysis Using ACR-PCR at Sultan Mahmud Badaruddin II Airport
Runway Strength Analysis Using ACR-PCR at Sultan Mahmud Badaruddin II Airport
Aircraft Classification Rating-Pavement Classification Rating (ACR-PCR) is a system to determine the PCR value of runway pavement strength and recommended for runway maintenance ...
Predicting the Remaining Service Life of Civil Airport Runway considering Reliability and Damage Accumulation
Predicting the Remaining Service Life of Civil Airport Runway considering Reliability and Damage Accumulation
Based on the MEPDG method, the operation process of MEPDG was analyzed and the MEPDG correction method applied to the remaining life prediction of airport pavement was obtained. Ac...
SEJARAH BANDARA MATAHORA DI PULAU WANGI-WANGI KABUPATEN WAKATOBI (2007-2017)
SEJARAH BANDARA MATAHORA DI PULAU WANGI-WANGI KABUPATEN WAKATOBI (2007-2017)
ABSTRAK: Permasalahan pokok dalam penelitian ini adalah: (1) Apa latar belakang pembangunan Bandara Matahora di Pulau Wangi-Wangi Kabupaten Wakatobi, (2) Apa kendala yang dihadapi ...
Simulation as a tool for calculating the airports’ runway capacity
Simulation as a tool for calculating the airports’ runway capacity
The basic parameter for evaluating the efficiency of airport operations is capacity. Investment planning in the aviation industry is a complex process, requiring consideration of m...
OPTIMIZATION INTERNATIONAL AIRPORT CAPACITY I GUSTI NGURAH RAI BALI
OPTIMIZATION INTERNATIONAL AIRPORT CAPACITY I GUSTI NGURAH RAI BALI
This study discuss about optimization capacity on land new to I Gusti Airport International Ngurah Rai, Bali with review evaluation capacity moment this . Development Airport Ngura...

