Javascript must be enabled to continue!
Pembaruan Kontrol Sistem Indonesia Low Speed Tunnel
View through CrossRef
AbstractIndonesian Low-Speed Tunnel (ILST) has been in operation since February 1987, whose operation is supported by 10 units of the ILST-facility plant, each ILST-facility plant works according to its duties and can be operated locally (onsite) and remotely (from control room/control desk). Local and remote Operations are made possible by system control’s installation at each ILST-facility plant. The control systems used are the Programmable Logic Controller (PLC), which is installed at each -ILST facility plant as local PLC and central PLC.For remote operations, a communication module is installed at local and central PLC. The PLC used by ILST was SATTControl running CPM operating system which is not commonly used anymore, and the spare parts are difficult to find because the PLC manufacturers have confirmed that they no longer provide technical support or spare parts since 2001.To ensure ILST’s continues operations, ILST’s control system update is carried out. The updates include old PLC checks, new locally available PLC surveys, compatibility with existing PLCs, windows-based hardware and software flexibility, inter PLCs communication, system’s reliability and suited with yearly available budget.Keywords: ILST system control, PLCAbstrakIndonesian Low Speed Tunnel (ILST) telah beroperasi sejak Pebruari 1987, dimana dalam operasinya didukung oleh 10 unit plant fasilitas-ILST, dimana plant fasilitas-ILST bekerja sesuai tugas plant masing-masing dan dapat dioperasikan secara local control (onsite) dan secara remote dari ruang kontrol (desk control). Pengoperasian secara local dan remote tersebut dimungkinkan dengan pemasangan kontrol sistem pada masing-masing plant fasilitas-ILST, kontrol sistem yang digunakan adalah Programmable Logic Controller (PLC), yang dipasang di tiap plant fasilitas-ILST sebagai local PLC dan central PLC.Untuk operasi remote dimana dipasang module komunikasi pada local dan central PLC. PLC yang digunakan ILST adalah SATTControl yang menggunakan operating system CPM yang tak umum lagi digunakan saat ini dan sulit mencari spare part karena produsen PLC telah mengkonfirmasi bahwa tak ada lagi dukungan teknis dan spare parts sejak tahun 2001.Untuk kelangsungan operasi ILST dilakukan pembaruan kontrol sistem ILST, pembaruan meliputi pemeriksaan PLC lama, survey PLC baru di dalam negeri, kecocokan dengan PLC existing, flexibilitas hardware dan software yang berbasis windows, komunikasi antar PLC, kehandalannya dan sesuai dengan dana yang diperoleh tiap tahun.Kata kunci: control system ILST, PLC
Badan Pengkajian dan Penerapan Teknologi (BPPT)
Title: Pembaruan Kontrol Sistem Indonesia Low Speed Tunnel
Description:
AbstractIndonesian Low-Speed Tunnel (ILST) has been in operation since February 1987, whose operation is supported by 10 units of the ILST-facility plant, each ILST-facility plant works according to its duties and can be operated locally (onsite) and remotely (from control room/control desk).
Local and remote Operations are made possible by system control’s installation at each ILST-facility plant.
The control systems used are the Programmable Logic Controller (PLC), which is installed at each -ILST facility plant as local PLC and central PLC.
For remote operations, a communication module is installed at local and central PLC.
The PLC used by ILST was SATTControl running CPM operating system which is not commonly used anymore, and the spare parts are difficult to find because the PLC manufacturers have confirmed that they no longer provide technical support or spare parts since 2001.
To ensure ILST’s continues operations, ILST’s control system update is carried out.
The updates include old PLC checks, new locally available PLC surveys, compatibility with existing PLCs, windows-based hardware and software flexibility, inter PLCs communication, system’s reliability and suited with yearly available budget.
Keywords: ILST system control, PLCAbstrakIndonesian Low Speed Tunnel (ILST) telah beroperasi sejak Pebruari 1987, dimana dalam operasinya didukung oleh 10 unit plant fasilitas-ILST, dimana plant fasilitas-ILST bekerja sesuai tugas plant masing-masing dan dapat dioperasikan secara local control (onsite) dan secara remote dari ruang kontrol (desk control).
Pengoperasian secara local dan remote tersebut dimungkinkan dengan pemasangan kontrol sistem pada masing-masing plant fasilitas-ILST, kontrol sistem yang digunakan adalah Programmable Logic Controller (PLC), yang dipasang di tiap plant fasilitas-ILST sebagai local PLC dan central PLC.
Untuk operasi remote dimana dipasang module komunikasi pada local dan central PLC.
PLC yang digunakan ILST adalah SATTControl yang menggunakan operating system CPM yang tak umum lagi digunakan saat ini dan sulit mencari spare part karena produsen PLC telah mengkonfirmasi bahwa tak ada lagi dukungan teknis dan spare parts sejak tahun 2001.
Untuk kelangsungan operasi ILST dilakukan pembaruan kontrol sistem ILST, pembaruan meliputi pemeriksaan PLC lama, survey PLC baru di dalam negeri, kecocokan dengan PLC existing, flexibilitas hardware dan software yang berbasis windows, komunikasi antar PLC, kehandalannya dan sesuai dengan dana yang diperoleh tiap tahun.
Kata kunci: control system ILST, PLC .
Related Results
Construction time of secondary lining of ultra-small spacing parallel overlapping tunnel
Construction time of secondary lining of ultra-small spacing parallel overlapping tunnel
Abstract
Due to the unique spatial structure, stress transfer mechanism, and construction disturbance characteristics of ultra-small spacing parallel overlapping tu...
Safety assessment of the construction of double track tunnels underneah exsiting railway tunnels
Safety assessment of the construction of double track tunnels underneah exsiting railway tunnels
The ground disturbance caused by the tunnel construction will inevitably have an impact on the upper part of the constructed tunnel structure, and the railroad tunnel requires a ve...
Comparison of prevalence of symptoms of carpal tunnel syndrome between dental students and dental practitioners - A cross-sectional study
Comparison of prevalence of symptoms of carpal tunnel syndrome between dental students and dental practitioners - A cross-sectional study
Background: carpal tunnel syndrome (CTS) arises from compression of the median nerve when it passes through the carpal tunnel in the wrist. Dental professionals use vibratory instr...
Influence of Lower Double-Track Tunnel Spacing on the Stress and Deformation Characteristics of Upper Tunnel in Double-Level Condominium Tunnels
Influence of Lower Double-Track Tunnel Spacing on the Stress and Deformation Characteristics of Upper Tunnel in Double-Level Condominium Tunnels
The open-cut tunnels in Aixi Lake, Nanchang, are constructed in a condominium form of highway tunnel and subway tunnel, which are the first superimposed double-level tunnels in Chi...
SISTEM KONTROL DAN PEMANTAUAN KUALITAS AIR PADA PARAMETER OKSIGEN TERLARUT DAN SUHU
SISTEM KONTROL DAN PEMANTAUAN KUALITAS AIR PADA PARAMETER OKSIGEN TERLARUT DAN SUHU
Sektor perikanan Indonesia memegang peranan penting untuk menunjang perekonomian Indonesia. Salah satunya sektor ikan hias seperti ikan Koi. Cuaca yang tidak mendukung dapat mengur...
The Effect of Intersection Angle on the Failure Mechanism of Utility Tunnel
The Effect of Intersection Angle on the Failure Mechanism of Utility Tunnel
Planning utility tunnel network in the area with geological disasters poses serious concerns, especial for the utility tunnel built in the ground fissures developed cities. Many pr...
Optimal Knee Flexion Angle for ACL Femoral Tunnel Drilling and ALL Femoral Tunnel Orientation in Combined ACL and ALL Reconstruction: 3D Simulation Study
Optimal Knee Flexion Angle for ACL Femoral Tunnel Drilling and ALL Femoral Tunnel Orientation in Combined ACL and ALL Reconstruction: 3D Simulation Study
Background:
In combined anterior cruciate ligament (ACL) and anterolateral ligament (ALL) reconstruction, there is a risk of collision between the femoral tunnels of th...
Risk management overview of tunnels using numerical modeling
Risk management overview of tunnels using numerical modeling
PurposeThe purpose of this paper is to introduce the numerical methods in tunnel engineering and their capabilities to indicate the fracture and failure in all kinds of tunneling m...

