Brownfield Projects Cost & Schedule Optimization

View through CrossRef
Abstract The brownfield projects deal with existing facilities/assets to upgrade or modify. These projects can be minor (e.g., change a few cable trays) to major (e.g., remove an old gas turbine). These projects are smaller in Capex spending compared to new greenfield projects, and sensitive to completion schedules, because of the facility's operational/production state. Normally some of the work is performed during shutdown of the facility, so there is economic pressure to resume operations as soon possible. Eighty percent of these projects are schedule-driven, and cost is relatively high if benchmarked with green field projects, which are usually cost-driven projects. There is a need to plan and execute these projects to optimize the cost and schedule, to achieve company's financial goals and production targets simultaneously. These strategies may vary from project to project, and there are many common actions that can be applied to all brownfield projects. It is a challenge for the project management team (PMT) to execute a brownfield project within the planned budget and schedule, due to uncertainties and constraints. In this paper we will discuss the risks and challenges faced by brownfield PMTs, and how to mitigate risks with planning and execution strategy at different stages of the project life cycle: i.e., concept selection, FEED, detail engineering, project proposal, contract award, execute construction, and commissioning of the facility.
Title: Brownfield Projects Cost & Schedule Optimization
Description:
Abstract The brownfield projects deal with existing facilities/assets to upgrade or modify.
These projects can be minor (e.
g.
, change a few cable trays) to major (e.
g.
, remove an old gas turbine).
These projects are smaller in Capex spending compared to new greenfield projects, and sensitive to completion schedules, because of the facility's operational/production state.
Normally some of the work is performed during shutdown of the facility, so there is economic pressure to resume operations as soon possible.
Eighty percent of these projects are schedule-driven, and cost is relatively high if benchmarked with green field projects, which are usually cost-driven projects.
There is a need to plan and execute these projects to optimize the cost and schedule, to achieve company's financial goals and production targets simultaneously.
These strategies may vary from project to project, and there are many common actions that can be applied to all brownfield projects.
It is a challenge for the project management team (PMT) to execute a brownfield project within the planned budget and schedule, due to uncertainties and constraints.
In this paper we will discuss the risks and challenges faced by brownfield PMTs, and how to mitigate risks with planning and execution strategy at different stages of the project life cycle: i.
e.
, concept selection, FEED, detail engineering, project proposal, contract award, execute construction, and commissioning of the facility.

Related Results

Focus on slow rotators - first results from stellar occultations campaign on long-period asteroids
Focus on slow rotators - first results from stellar occultations campaign on long-period asteroids
<p><strong>Most asteroids are slow rotators  </strong>      ...
Cometary Physics Laboratory: spectrophotometric experiments
Cometary Physics Laboratory: spectrophotometric experiments
<p><strong><span dir="ltr" role="presentation">1. Introduction</span></strong&...
North Syrian Mortaria and Other Late Roman Personal and Utility Objects Bearing Inscriptions of Good Luck
North Syrian Mortaria and Other Late Roman Personal and Utility Objects Bearing Inscriptions of Good Luck
<span style="font-size: 11pt; color: black; font-family: 'Times New Roman','serif'">&Pi;&Eta;&Lambda;&Iota;&Nu;&Alpha; &Iota;&Gamma;&Delta...
Morphometry of an hexagonal pit crater in Pavonis Mons, Mars
Morphometry of an hexagonal pit crater in Pavonis Mons, Mars
&lt;p&gt;&lt;strong&gt;Introduction:&lt;/strong&gt;&lt;/p&gt; &lt;p&gt;Pit craters are peculiar depressions found in almost every terrestria...
Un manoscritto equivocato del copista santo Theophilos († 1548)
Un manoscritto equivocato del copista santo Theophilos († 1548)
<p><font size="3"><span class="A1"><span style="font-family: 'Times New Roman','serif'">&Epsilon;&Nu;&Alpha; &Lambda;&Alpha;&Nu;&...
A Touch of Space Weather - Outreach project for visually impaired students
A Touch of Space Weather - Outreach project for visually impaired students
&lt;p&gt;&lt;em&gt;&lt;span data-preserver-spaces=&quot;true&quot;&gt;'A Touch of Space Weather' is a project that brings space weather science into...
Ballistic landslides on comet 67P/Churyumov&#8211;Gerasimenko
Ballistic landslides on comet 67P/Churyumov&#8211;Gerasimenko
&lt;p&gt;&lt;strong&gt;Introduction:&lt;/strong&gt;&lt;/p&gt;&lt;p&gt;The slow ejecta (i.e., with velocity lower than escape velocity) and l...

Back to Top