Grout Curtain Construction At Bolivar Dam, Ohio
View through CrossRef
Abstract
Bolivar Dam, located in eastern Ohio, is an embankment dam constructed by the U.S. Army Corps of Engineers in 1937 as part of the Muskingum River Basin Project for flood control. As a result of seepage concerns observed at the dam during several flood events over the life of the project, seepage reduction measures, including a partial-depth seepage barrier wall through the embankment and a grout curtain in the left abutment, were designed and constructed. These dam safety modifications were constructed between 2014 and 2016. During flood events, Bolivar Dam experiences excessive seepage through the glacial outwash foundation as well as through a network of open joints within the left bedrock abutment. Seepage in the bedrock abutment could erode/scour the dam embankment at the bedrock contact, potentially leading to dam failure. To lower this potential risk of dam failure in the left abutment, a grout curtain was constructed between the new seepage barrier wall and an existing grout curtain across the emergency spillway. The new grout curtain is designed to impede groundwater seepage, resulting in reduced groundwater velocity/energy downstream of the grout curtain, thereby decreasing its potential to scour or transport fine-grained embankment material. The double-line grout curtain is approximately 65 ft (19.8 m) deep and 400 ft (121.9 m) long and was completed in November 2015 as part of a major dam safety modification project. Two thin limestone units encountered during drilling proved to be problematic and posed various challenges during construction. It was common during drilling to lose water circulation within the vicinity of these limestone units, which then required the use of downstaged grouting methods. The majority of the grout volume for the project was placed within these downstaged intervals. This article presents the risk-informed decisions that were made during both design and construction of the grout curtain and includes various lessons that were learned during this process.
Association of Environmental and Engineering Geologists
Title: Grout Curtain Construction At Bolivar Dam, Ohio
Description:
Abstract
Bolivar Dam, located in eastern Ohio, is an embankment dam constructed by the U.
S.
Army Corps of Engineers in 1937 as part of the Muskingum River Basin Project for flood control.
As a result of seepage concerns observed at the dam during several flood events over the life of the project, seepage reduction measures, including a partial-depth seepage barrier wall through the embankment and a grout curtain in the left abutment, were designed and constructed.
These dam safety modifications were constructed between 2014 and 2016.
During flood events, Bolivar Dam experiences excessive seepage through the glacial outwash foundation as well as through a network of open joints within the left bedrock abutment.
Seepage in the bedrock abutment could erode/scour the dam embankment at the bedrock contact, potentially leading to dam failure.
To lower this potential risk of dam failure in the left abutment, a grout curtain was constructed between the new seepage barrier wall and an existing grout curtain across the emergency spillway.
The new grout curtain is designed to impede groundwater seepage, resulting in reduced groundwater velocity/energy downstream of the grout curtain, thereby decreasing its potential to scour or transport fine-grained embankment material.
The double-line grout curtain is approximately 65 ft (19.
8 m) deep and 400 ft (121.
9 m) long and was completed in November 2015 as part of a major dam safety modification project.
Two thin limestone units encountered during drilling proved to be problematic and posed various challenges during construction.
It was common during drilling to lose water circulation within the vicinity of these limestone units, which then required the use of downstaged grouting methods.
The majority of the grout volume for the project was placed within these downstaged intervals.
This article presents the risk-informed decisions that were made during both design and construction of the grout curtain and includes various lessons that were learned during this process.
Related Results
Assessment of Post-Tensioned Grout Durability by Accelerated Robustness and Corrosion Testing
Assessment of Post-Tensioned Grout Durability by Accelerated Robustness and Corrosion Testing
The corrosion of steel in post-tensioned tendons has been associated with deficient grout materials containing high free sulfate ion concentrations. In a Florida bridge in 2011, te...
Corrosion of Post-Tensioned Tendons with Deficient Grout, Part 3: Segregated Grout with Elevated Sulfate and Vestigial Chloride Content
Corrosion of Post-Tensioned Tendons with Deficient Grout, Part 3: Segregated Grout with Elevated Sulfate and Vestigial Chloride Content
Severe corrosion of post-tensioned (PT) tendons with pre-packaged thixotropic grout was documented in Florida bridges after less than 8 years of service. In those bridges, corrosio...
An Assessment of the Thermal Performance of Wood Curtain Wall Frames
An Assessment of the Thermal Performance of Wood Curtain Wall Frames
<p>The thermal performance of three different wood framed curtain walls was analyzed and compared to the performance of two thermally broken aluminum curtain walls and one fi...
An Assessment of the Thermal Performance of Wood Curtain Wall Frames
An Assessment of the Thermal Performance of Wood Curtain Wall Frames
<p>The thermal performance of three different wood framed curtain walls was analyzed and compared to the performance of two thermally broken aluminum curtain walls and one fi...
Corrosion of Post-Tensioned Tendons with Deficient Grout, Part 2: Segregated Grout with Elevated Sulfate Content
Corrosion of Post-Tensioned Tendons with Deficient Grout, Part 2: Segregated Grout with Elevated Sulfate Content
Corrosion failure of post-tensioning (PT) tendons with pre-packaged thixotropic grout has been documented in Florida bridges. Analysis of the deficient grout in Florida PT bridges,...
Test Methods to Identify Robustness of Grout Materials to Resist Corrosion
Test Methods to Identify Robustness of Grout Materials to Resist Corrosion
Abstract
The application of prestressed concrete including post-tension construction technology has seen wide acceptance for highway bridges as it provides structura...
Study of Honeycomb Air Curtain for a Freezer Room to Enhance Protection against Warm Air Infiltration
Study of Honeycomb Air Curtain for a Freezer Room to Enhance Protection against Warm Air Infiltration
The objective of this research is to present the energy-saving effect of applying an air curtain to prevent the penetration of warm air through a freezer door. Retail business is h...
The Properties of Masonry Grout in Concrete Masonry
The Properties of Masonry Grout in Concrete Masonry
This paper presents the results of a research project on the properties of masonry grout and grouted concrete masonry. Seventy-two grout specimens were tested to investigate the ef...