Numerical Simulation and Analysis of the Three-Step Excavation of an Extra-Large Cross-Section and a Low Flat-Ratio Railway Tunnel

View through CrossRef
Abstract The Xinbaishiyan tunnel in the reconstruction Chengdu-Kunming railway Ermeishan-Mipan section mainly runs through dolomite with dolomitic limestone, with an excavation area of 260 m2, a maximum span of 22.3 m, a maximum height of 14.4 m, a vector height of 7 m, and a rise-span ratio of 0.31. The tunnel has an extra-large cross-section and it is a low flat-ration railway tunnel. This paper mainly describes the the finite element analysis for this tunnel excavation that was used to guide the construction. Finite element software was used to model the tunnel according to the engineering geological conditions of the tunnel. These engineering geological conditions included the rock mass, system bolts, middle pipe shed, steel arch and shotcrete, grouting layer, second lining and so on. Nonlinear construction phase analysis was adopted. The results showed that the maximum vertical deformation of the tunnel vault and the middle of the invert was about 34 mm. The vertical deformation of the tunnel could be divided into an acceleration deformation section, linear deformation section, deceleration deformation section, and stable deformation section. The maximum horizontal deformation in the middle of the side wall was about 12.3 mm. Under the effect of the initial support, the equivalent stress of the side wall gradually increased with the excavation of the steps and the increase of the support structure. The axial force of the bolt in the middle of the side wall was larger than that in other places and the axial force of the middle pipe shed went along with the excavation of the tunnel in waves. The steel arch and the shotcrete had the maximum effective stress at the arch shoulder, which played the role of the deformation and pressure for the surrounding rock. During the construction, the length and height of the three-step method had to be set reasonably. The middle pipe shed and the system bolt supported the rock mass together. In the construction of the extra-large cross section and the flat tunnel, there was no need to set up temporary support, which was convenient for mechanical excavation.
Title: Numerical Simulation and Analysis of the Three-Step Excavation of an Extra-Large Cross-Section and a Low Flat-Ratio Railway Tunnel
Description:
Abstract The Xinbaishiyan tunnel in the reconstruction Chengdu-Kunming railway Ermeishan-Mipan section mainly runs through dolomite with dolomitic limestone, with an excavation area of 260 m2, a maximum span of 22.
3 m, a maximum height of 14.
4 m, a vector height of 7 m, and a rise-span ratio of 0.
31.
The tunnel has an extra-large cross-section and it is a low flat-ration railway tunnel.
This paper mainly describes the the finite element analysis for this tunnel excavation that was used to guide the construction.
Finite element software was used to model the tunnel according to the engineering geological conditions of the tunnel.
These engineering geological conditions included the rock mass, system bolts, middle pipe shed, steel arch and shotcrete, grouting layer, second lining and so on.
Nonlinear construction phase analysis was adopted.
The results showed that the maximum vertical deformation of the tunnel vault and the middle of the invert was about 34 mm.
The vertical deformation of the tunnel could be divided into an acceleration deformation section, linear deformation section, deceleration deformation section, and stable deformation section.
The maximum horizontal deformation in the middle of the side wall was about 12.
3 mm.
Under the effect of the initial support, the equivalent stress of the side wall gradually increased with the excavation of the steps and the increase of the support structure.
The axial force of the bolt in the middle of the side wall was larger than that in other places and the axial force of the middle pipe shed went along with the excavation of the tunnel in waves.
The steel arch and the shotcrete had the maximum effective stress at the arch shoulder, which played the role of the deformation and pressure for the surrounding rock.
During the construction, the length and height of the three-step method had to be set reasonably.
The middle pipe shed and the system bolt supported the rock mass together.
In the construction of the extra-large cross section and the flat tunnel, there was no need to set up temporary support, which was convenient for mechanical excavation.

Related Results

Construction time of secondary lining of ultra-small spacing parallel overlapping tunnel
Construction time of secondary lining of ultra-small spacing parallel overlapping tunnel
Abstract Due to the unique spatial structure, stress transfer mechanism, and construction disturbance characteristics of ultra-small spacing parallel overlapping tu...
Safety assessment of the construction of double track tunnels underneah exsiting railway tunnels
Safety assessment of the construction of double track tunnels underneah exsiting railway tunnels
The ground disturbance caused by the tunnel construction will inevitably have an impact on the upper part of the constructed tunnel structure, and the railroad tunnel requires a ve...
Effects of Excavation Loading Conditions on Ground Deformation and Stress Evolution in Plane-Strain Tunnel Simulations
Effects of Excavation Loading Conditions on Ground Deformation and Stress Evolution in Plane-Strain Tunnel Simulations
The construction of tunnels in urban areas typically affects a large number of buildings and infrastructure. The interaction between ground deformations induced by tunnel excavatio...
Risk management overview of tunnels using numerical modeling
Risk management overview of tunnels using numerical modeling
PurposeThe purpose of this paper is to introduce the numerical methods in tunnel engineering and their capabilities to indicate the fracture and failure in all kinds of tunneling m...
Safety Evaluation of Crossing Tunnel Engineering: A Case Study
Safety Evaluation of Crossing Tunnel Engineering: A Case Study
With the growing demand for transportation, there has been a significant increase in road-related projects, leading to potential risks in the safety of existing structures. This pa...
Comparison of prevalence of symptoms of carpal tunnel syndrome between dental students and dental practitioners - A cross-sectional study
Comparison of prevalence of symptoms of carpal tunnel syndrome between dental students and dental practitioners - A cross-sectional study
Background: carpal tunnel syndrome (CTS) arises from compression of the median nerve when it passes through the carpal tunnel in the wrist. Dental professionals use vibratory instr...
Study on Large Deformation Prediction and Control Technology of Carbonaceous Slate Tunnel in Lixiang Railway
Study on Large Deformation Prediction and Control Technology of Carbonaceous Slate Tunnel in Lixiang Railway
The construction of railway tunnel in carbonaceous slate environment is easy to cause rock mass disturbance, which leads to large deformation of surrounding rock and then threatens...
Railway tunnel portal noise
Railway tunnel portal noise
Railway tunnel portal noise is a concern in environmental impact assessment for railway projects. Railway noise is amplified inside the tunnel due to multiple reflections of highly...