Shenzi 16-Inch Oil Export SCR CVA Verification
View through CrossRef
Abstract
In 2006 Enterprise developed a 16-inch oil export system from Shenzi field located in Green Canyon Block 653 in the Gulf of Mexico, approximately 120 nautical miles offshore in approximately 4,375 ft of water depth. The oil export system is attached to the Shenzi TLP host facility. The 16-inch oil export SCR system is subject to the CVA (Certified Verification Agent) verification required by MMS (Minerals Management Service) 30 CFR Part 250 [Ref. 1]. NTL No. 2007-G14 [Ref. 2] was issued pursuant to 30 CFR 250.103 to provide clarification and guidance for pipeline riser design, fabrication, and installation under the platform verification program specified in 30 CFR 250.909 through 918. This paper summarizes the 16-inch oil export SCR CVA verification procedure.
This paper presents a systematic SCR CVA verification procedure. The CVA verification procedure includes SCR CVA verification preparation, and verification of SCR design, fabrication, and installation. The verification procedure and table formats developed are unique and applicable to other types of pipeline risers in the Gulf of Mexico.
Introduction
The Shenzi field is located in the deepwater central Gulf of Mexico approximately 120 miles from the Louisiana coast. The field comprises Green Canyon Blocks 609, 610, 653, and 654. Water depth at the site is approximately 4,300 ft. Figure 1 presents the Shenzi Field layout [Ref. 3].
The Shenzi Oil Export Pipeline and SCR will transport crude oil from BHP Billiton's Tension Leg Platform (TLP) in Green Canyon Block 653 in approximately 4500 fsw to the Ship Shoal 332B Platform in approximately 435 fsw. Figure 2 presents an artist's rendering of the Shenzi TLP [Ref. 3].
30 CFR Part 250 was published in the Federal Register on July 19, 2005. The rule became effective on August 18, 2005. 30 CFR 250.909 through 250.918 applies to new pipeline risers attached to the floating platforms in the Gulf of Mexico. The rule defines the CVA nomination, CVA's primary responsibilities, CVA's primary duties during the design phase, CVA's primary duties during the fabrication phase, and the CVA's primary duties during the installation phase. The detailed engineering design of Shenzi 16-inch oil export SCR started at the beginning of 2006. So it was one of the earliest SCRs subjected to the CVA program.
This paper presents a systematic SCR CVA verification procedure developed during Shenzi 16-inch oil export SCR CVA verification project. The verification procedure includes SCR CVA verification preparation, SCR design CVA verification, SCR fabrication CVA verification, and SCR installation CVA verification. The verification procedure and table formats developed are unique and applicable to other types of pipeline risers in the Gulf of Mexico.
SCR Design Data
SCR Data
The API 5L X-65 steel grade has been selected for the oil export SCR. Table 1 summarizes the oil export SCR data, pipe wall thickness tolerances, corrosion allowance, SCR coating data, and VIV suppression device data.
Internal Fluid, Design Pressure and Temperature
Design pressure and temperature are 3,540 psig and 140 ?F. For normal operating condition, the pressure and temperature are 3,220 psig and 120 ?F. For hurricane shut-down condition, the pressure and temperature are 3,540 psig and 120 ?F. The oil density is 54.0 pcf and the pressure reference elevation is 200 ft above mean sea level for all conditions.
Title: Shenzi 16-Inch Oil Export SCR CVA Verification
Description:
Abstract
In 2006 Enterprise developed a 16-inch oil export system from Shenzi field located in Green Canyon Block 653 in the Gulf of Mexico, approximately 120 nautical miles offshore in approximately 4,375 ft of water depth.
The oil export system is attached to the Shenzi TLP host facility.
The 16-inch oil export SCR system is subject to the CVA (Certified Verification Agent) verification required by MMS (Minerals Management Service) 30 CFR Part 250 [Ref.
1].
NTL No.
2007-G14 [Ref.
2] was issued pursuant to 30 CFR 250.
103 to provide clarification and guidance for pipeline riser design, fabrication, and installation under the platform verification program specified in 30 CFR 250.
909 through 918.
This paper summarizes the 16-inch oil export SCR CVA verification procedure.
This paper presents a systematic SCR CVA verification procedure.
The CVA verification procedure includes SCR CVA verification preparation, and verification of SCR design, fabrication, and installation.
The verification procedure and table formats developed are unique and applicable to other types of pipeline risers in the Gulf of Mexico.
Introduction
The Shenzi field is located in the deepwater central Gulf of Mexico approximately 120 miles from the Louisiana coast.
The field comprises Green Canyon Blocks 609, 610, 653, and 654.
Water depth at the site is approximately 4,300 ft.
Figure 1 presents the Shenzi Field layout [Ref.
3].
The Shenzi Oil Export Pipeline and SCR will transport crude oil from BHP Billiton's Tension Leg Platform (TLP) in Green Canyon Block 653 in approximately 4500 fsw to the Ship Shoal 332B Platform in approximately 435 fsw.
Figure 2 presents an artist's rendering of the Shenzi TLP [Ref.
3].
30 CFR Part 250 was published in the Federal Register on July 19, 2005.
The rule became effective on August 18, 2005.
30 CFR 250.
909 through 250.
918 applies to new pipeline risers attached to the floating platforms in the Gulf of Mexico.
The rule defines the CVA nomination, CVA's primary responsibilities, CVA's primary duties during the design phase, CVA's primary duties during the fabrication phase, and the CVA's primary duties during the installation phase.
The detailed engineering design of Shenzi 16-inch oil export SCR started at the beginning of 2006.
So it was one of the earliest SCRs subjected to the CVA program.
This paper presents a systematic SCR CVA verification procedure developed during Shenzi 16-inch oil export SCR CVA verification project.
The verification procedure includes SCR CVA verification preparation, SCR design CVA verification, SCR fabrication CVA verification, and SCR installation CVA verification.
The verification procedure and table formats developed are unique and applicable to other types of pipeline risers in the Gulf of Mexico.
SCR Design Data
SCR Data
The API 5L X-65 steel grade has been selected for the oil export SCR.
Table 1 summarizes the oil export SCR data, pipe wall thickness tolerances, corrosion allowance, SCR coating data, and VIV suppression device data.
Internal Fluid, Design Pressure and Temperature
Design pressure and temperature are 3,540 psig and 140 ?F.
For normal operating condition, the pressure and temperature are 3,220 psig and 120 ?F.
For hurricane shut-down condition, the pressure and temperature are 3,540 psig and 120 ?F.
The oil density is 54.
0 pcf and the pressure reference elevation is 200 ft above mean sea level for all conditions.
Related Results
Integrated Site Investigation of Seafloor Features and Associated Fauna, Shenzi Field, Deepwater Gulf of Mexico
Integrated Site Investigation of Seafloor Features and Associated Fauna, Shenzi Field, Deepwater Gulf of Mexico
Abstract
The continental slope of the Deepwater Gulf of Mexico is characterized by complex seafloor topography caused in part by shallow salt deformation. Locally...
Export concentration and diversification impact on economic growth in the developed and developing countries of the world
Export concentration and diversification impact on economic growth in the developed and developing countries of the world
There is much evidence that export diversity has a positive effect on economic growth, but there is some evidence that the concentration of exports may be also related to economic ...
Replenishment of Drosophila Male Pheromone After Mating
Replenishment of Drosophila Male Pheromone After Mating
Abstract
Insects exocrine gland products can be involved in sexual communication, defense, territory labelling, aggregation and alarm. In the vinegar fly Drosophila melanog...
Large Diameter SCR Delivery Challenges
Large Diameter SCR Delivery Challenges
Abstract
This paper discusses the challenges of manufacturing and installing large diameter Steel Catenary Risers (SCRs), based on the experiences of manufacturin...
To Pig or Not to Pig: The Marlin Experience With Stuck Pig
To Pig or Not to Pig: The Marlin Experience With Stuck Pig
Abstract
On June 11, 2004, a pig was stuck in the BP deepwater Gulf of Mexico Marlin TLP oil export pipeline. The pig was stuck approximately nine miles from the ...
Variable Creatinine Levels in Critical Care Patients: A Concerning Knowledge Gap
Variable Creatinine Levels in Critical Care Patients: A Concerning Knowledge Gap
An accurate creatinine (Cr) estimate is pivotal for the assessment of renal function. Both patient- and practice-spawned factors palliate the test accuracy of serum creatinine (sCr...
British Food Journal Volume 35 Issue 5 1933
British Food Journal Volume 35 Issue 5 1933
The Fruit Control Act, 1924, is an important one as it provides for the establishment of a Fruit Control Board, and is described as an “Act to make Provision for Control of the Fru...
METHODICAL APPROACHES TO THE EXPORT POTENTIAL ESTIMATION OF AGRICULTURAL ENTERPRISES
METHODICAL APPROACHES TO THE EXPORT POTENTIAL ESTIMATION OF AGRICULTURAL ENTERPRISES
Introduction. The lack of a unified methodology of the export potential assessing of agro-industrial enterprises poses some difficulties in the activities of export-oriented econom...