Erosion Study for a 400 MMcf/D Completion: Cannonball Field, Offshore Trinidad
View through CrossRef
Abstract
The Cannonball Field is a one Tcf gas condensate development offshore Trinidad producing at a sustained rate in excess of 800 MMcf/D from three wells. The completion design selected was 7⅝ inch production tubing with an open-hole gravel pack. The initial well (CAN01) has produced at 333 MMcf/D. These rates are higher than typically experienced which has raised concerns concerns about the resultant potential for metal erosion. As a result, a rigorous erosion study was initiated. The objective was to quantitatively evaluate erosion at various rates over the life cycle of the well to appropriately design the completion and select the appropriate materials.
The erosion nodes within the completion - changes in flow direction (e.g. a tee such as in the wellhead) and/or flow constrictions - were identified as: the tree; a landing nipple profile near the surface; and a formation isolation device (FID) positioned in the gravel pack assembly. The key parameters were defined as particles of sharp sand, with a diameter of 50 microns, at a concentration of 0.1 lbs/MMcf. Erosion rates were calculated using the erosion model - Sand Production Pipe Saver (SPPS) - developed by the Erosion/Corrosion Research Center, University of Tulsa, USA. Erosion rates were calculated over the life cycle starting at initial rates of 280 and 400 MMcf/D. Erosion rates were also calculated with and without a liquid film (a protective layer on the pipe wall that can reduce the erosion rate). Erosion results (without a liquid film) at all nodes exceeded BP's erosion limit; however, the erosion results with a thin liquid film were mostly below the company's erosion limit. Determination of the presence and thickness of the liquid film was critical. A multi-phase pipeline simulation calculated that a sufficient liquid film would exist at all critical areas. Erosion of the tree was further assessed by computation fluid dynamics (CFD) models, which identified several hot spots; thus, additional cladding of all flow-wetted surfaces and rounding of the outlet corner was required. The Cannonball completion design, including the tree, was determined to be capable of sustained rates up to a maximum 400 MMcf/D. The three (3) well development, where initial rates have been as high as 333 MMcf/D, has been on production for several years without any erosion issues.
Title: Erosion Study for a 400 MMcf/D Completion: Cannonball Field, Offshore Trinidad
Description:
Abstract
The Cannonball Field is a one Tcf gas condensate development offshore Trinidad producing at a sustained rate in excess of 800 MMcf/D from three wells.
The completion design selected was 7⅝ inch production tubing with an open-hole gravel pack.
The initial well (CAN01) has produced at 333 MMcf/D.
These rates are higher than typically experienced which has raised concerns concerns about the resultant potential for metal erosion.
As a result, a rigorous erosion study was initiated.
The objective was to quantitatively evaluate erosion at various rates over the life cycle of the well to appropriately design the completion and select the appropriate materials.
The erosion nodes within the completion - changes in flow direction (e.
g.
a tee such as in the wellhead) and/or flow constrictions - were identified as: the tree; a landing nipple profile near the surface; and a formation isolation device (FID) positioned in the gravel pack assembly.
The key parameters were defined as particles of sharp sand, with a diameter of 50 microns, at a concentration of 0.
1 lbs/MMcf.
Erosion rates were calculated using the erosion model - Sand Production Pipe Saver (SPPS) - developed by the Erosion/Corrosion Research Center, University of Tulsa, USA.
Erosion rates were calculated over the life cycle starting at initial rates of 280 and 400 MMcf/D.
Erosion rates were also calculated with and without a liquid film (a protective layer on the pipe wall that can reduce the erosion rate).
Erosion results (without a liquid film) at all nodes exceeded BP's erosion limit; however, the erosion results with a thin liquid film were mostly below the company's erosion limit.
Determination of the presence and thickness of the liquid film was critical.
A multi-phase pipeline simulation calculated that a sufficient liquid film would exist at all critical areas.
Erosion of the tree was further assessed by computation fluid dynamics (CFD) models, which identified several hot spots; thus, additional cladding of all flow-wetted surfaces and rounding of the outlet corner was required.
The Cannonball completion design, including the tree, was determined to be capable of sustained rates up to a maximum 400 MMcf/D.
The three (3) well development, where initial rates have been as high as 333 MMcf/D, has been on production for several years without any erosion issues.
Related Results
Offshore Mahogany Field Development to Support Trinidad's LNG Plant
Offshore Mahogany Field Development to Support Trinidad's LNG Plant
Abstract
In the mid-1990's, BP Amoco embarked on an accelerated exploration programme offshore Trinidad, discovering in excess of 10 Tscf gas reserves. This led i...
Recent Innovations in Offshore Completion and Workover Systems
Recent Innovations in Offshore Completion and Workover Systems
ABSTRACT
Humble Oil &Refining Company has developed an offshore completion and workover system, for use with multi-well fixed platform development, which util...
Research on Communication Stability of Inter-Cannonball Network Based on OPNET
Research on Communication Stability of Inter-Cannonball Network Based on OPNET
In modern warfare, achieving strikes against military targets commonly involves utilizing methods such as fire coverage and missile precision guidance. While effective, fire covera...
Benefits of an Integrated Power and Hydrogen Offshore Grid in a Net-Zero North Sea Energy System
Benefits of an Integrated Power and Hydrogen Offshore Grid in a Net-Zero North Sea Energy System
The North Sea Offshore Grid concept has been envisioned as a promising alternative to: 1) ease the integration of offshore wind and onshore energy systems, and 2) increase the cros...
Prospects for Offshore Petroleum Resources
Prospects for Offshore Petroleum Resources
EXTENDED ABSTRACT
Extending the geographic scope of offshore exploration has traditionally been perceived as the frontier for offshore petroleum development. Corr...
Flow Analysis: A Critical Step in Completion Design and Optimization. A Case Study of Multizone Completion Designs
Flow Analysis: A Critical Step in Completion Design and Optimization. A Case Study of Multizone Completion Designs
Abstract
Multizone completion systems are used worldwide as an efficient method to maximize reserves recovery. There are several assets in the deepwater Gulf of Mexi...
Moving Path Analysis of a Cannonball Colliding onto Water
Moving Path Analysis of a Cannonball Colliding onto Water
When a cannonball collides onto water, it can ricochet several times because normal force is generated larger than the weight. In order to determine the moving path, an analysis is...
Petroleum Industry of Trinidad
Petroleum Industry of Trinidad
Trinidad, British West Indies, is an island near the north coast of SouthAmerica, situated between latitudes 10? and 11? N., and opposite the numerousoutlets of the Orinoco River D...