Javascript must be enabled to continue!
Process scheduling analysis and dynamic optimization maintaining the operation margin for acetylene fixed-bed hydrogenation reactor
View through CrossRef
AbstractThe full cycle operation optimization of acetylene hydrogenation reactor should be carried out rigidly according to the operation optimization scheme within the operation cycle. However, in the actual industrial process, for meeting the temporary process scheduling requirements, the acetylene hydrogenation reactor needs to temporarily adjust the operation strategy in the remaining operation cycle after running according to results of the dynamic optimization for a certain period, which brings more changes and challenges to the operation optimization problem. Based on the margin estimation and the control optimization framework of slowly-time-varying systems, the kind of full-cycle dynamic optimization problem in which the operation optimization scheme is temporarily changed during the operation cycle is researched in this paper.The methods of changing the operation optimization scheme include as follows: changed the operation cycle, maximized economic benefit and changed the optimization goal, maximized the operation cycle. In this paper, the effect of process scheduling change on the full-cycle optimization is analyzed by dynamic optimization model maintaining the operation margin, established the full-cycle scheduling optimization model, and the optimal scheduling strategy is obtained.
Title: Process scheduling analysis and dynamic optimization maintaining the operation margin for acetylene fixed-bed hydrogenation reactor
Description:
AbstractThe full cycle operation optimization of acetylene hydrogenation reactor should be carried out rigidly according to the operation optimization scheme within the operation cycle.
However, in the actual industrial process, for meeting the temporary process scheduling requirements, the acetylene hydrogenation reactor needs to temporarily adjust the operation strategy in the remaining operation cycle after running according to results of the dynamic optimization for a certain period, which brings more changes and challenges to the operation optimization problem.
Based on the margin estimation and the control optimization framework of slowly-time-varying systems, the kind of full-cycle dynamic optimization problem in which the operation optimization scheme is temporarily changed during the operation cycle is researched in this paper.
The methods of changing the operation optimization scheme include as follows: changed the operation cycle, maximized economic benefit and changed the optimization goal, maximized the operation cycle.
In this paper, the effect of process scheduling change on the full-cycle optimization is analyzed by dynamic optimization model maintaining the operation margin, established the full-cycle scheduling optimization model, and the optimal scheduling strategy is obtained.
Related Results
Increased life expectancy of heart failure patients in a rural center by a multidisciplinary program
Increased life expectancy of heart failure patients in a rural center by a multidisciplinary program
Abstract
Funding Acknowledgements
Type of funding sources: None.
INTRODUCTION Patients with heart failure (HF)...
How does bed load transport influence the longitudinal profile of reservoir sedimentation?
How does bed load transport influence the longitudinal profile of reservoir sedimentation?
The construction of the reservoir has destroyed the equilibrium of the natural river and promoted the siltation of a large amount of sediment in the reservoir. The longitudinal pro...
Review of Slurry Bed Reactor for Carbon One Chemistry
Review of Slurry Bed Reactor for Carbon One Chemistry
The slurry bed reactor has many advantages, which make it very suitable for gas-to-liquid processes, especially for the highly exothermic reactions. This chapter reviews three type...
Technical Progress Review and Prospect of Safety Guarantee for Long-Term Service Hydrogenation Reactors
Technical Progress Review and Prospect of Safety Guarantee for Long-Term Service Hydrogenation Reactors
Abstract
The hydrogenation reactor is the core equipment of petrochemical hydroreforming, hydrorefining, hydrocracking and other units, which operates over long term...
Continuous-Flow Hydrogenation of Nitroaromatics in Microreactor with Mesoporous Pd@SBA-15
Continuous-Flow Hydrogenation of Nitroaromatics in Microreactor with Mesoporous Pd@SBA-15
The hydrogenation of nitroaromatics to prepare aromatic amines plays a crucial role in the chemical industry. Traditional hydrogenation has the risk of hydrogen leakage from the eq...
Efeitos do Pilates solo e exercício resistido sobre a obesidade central e o índice de massa corpórea em idosos
Efeitos do Pilates solo e exercício resistido sobre a obesidade central e o índice de massa corpórea em idosos
<!--[if gte mso 9]><xml> <w:WordDocument> <w:View>Normal</w:View> <w:Zoom>0</w:Zoom> <w:TrackMoves /> <w:TrackFormatting /> &l...
DPTM: An Adaptive Scheduler Design Utilizing Timeslot Matching and Release Methods for Concurrent and Multi-task Interleaved Pipelining-oriented CGRA
DPTM: An Adaptive Scheduler Design Utilizing Timeslot Matching and Release Methods for Concurrent and Multi-task Interleaved Pipelining-oriented CGRA
Coarse-grained reconfigurable architectures (CGRAs) are increasingly employed as domain-specific accelerators due to their efficiency and flexibility. However, the existing CGRA ar...
Visual versus Tabular Scheduling Programs
Visual versus Tabular Scheduling Programs
Effective scheduling in construction is crucial for ensuring timely project completion and maintaining budget control. Scheduling programs play an important role in this process by...

