Javascript must be enabled to continue!
Sistem Tapping Fasa Keseimbangan Beban Berbasis Internet of Things
View through CrossRef
Load imbalance that occurs continuously will decrease in the reliability of a system, the maximum limit for load imbalance, according to IEEE Std 446-1995 is 20% in each phase. The design of a prototype for the management of 1-phase loading electrical energy using the Blynk platform as a user interfaces, monitor and controller. The phase shift method reduces the percentage value of the load imbalance in the electrical energy distribution system. An Energy Meter is used for measuring the electrical quantities and detecting unbalanced phases. Arduino Mega and ESP 8266-01 are used to communicate data as sending and receiving commands from Blynk, testing before balancing the measured load on the Energy Meter. The R phase has a current of 0.36 Ampere, The S phase is 0.71 Ampere, and 0.00 Ampere in the T phase. The percentage before load imbalance shows a value of 100%. After balancing the load, the measured current becomes 0.41 Ampere in the R phase, 0.44 Ampere in the S phase, and the 0.39 Ampere for T phase. The value of the load imbalance decreased to 17.7%.
Institut Teknologi Dirgantara Adisutjipto (IDTA)
Title: Sistem Tapping Fasa Keseimbangan Beban Berbasis Internet of Things
Description:
Load imbalance that occurs continuously will decrease in the reliability of a system, the maximum limit for load imbalance, according to IEEE Std 446-1995 is 20% in each phase.
The design of a prototype for the management of 1-phase loading electrical energy using the Blynk platform as a user interfaces, monitor and controller.
The phase shift method reduces the percentage value of the load imbalance in the electrical energy distribution system.
An Energy Meter is used for measuring the electrical quantities and detecting unbalanced phases.
Arduino Mega and ESP 8266-01 are used to communicate data as sending and receiving commands from Blynk, testing before balancing the measured load on the Energy Meter.
The R phase has a current of 0.
36 Ampere, The S phase is 0.
71 Ampere, and 0.
00 Ampere in the T phase.
The percentage before load imbalance shows a value of 100%.
After balancing the load, the measured current becomes 0.
41 Ampere in the R phase, 0.
44 Ampere in the S phase, and the 0.
39 Ampere for T phase.
The value of the load imbalance decreased to 17.
7%.
Related Results
Rancang Bangun Modul Pembelajaran Transformator 1 Fasa dan 3 Fasa dengan Daya 120/360 VA
Rancang Bangun Modul Pembelajaran Transformator 1 Fasa dan 3 Fasa dengan Daya 120/360 VA
Transformator adalah salah satu komponen penting dalam sistem tenaga listrik. Maka dengan begitu harus adanya pemahaman yang baik mengenai karakteristik transformator. Sehingga per...
Analisa Pengaruh Tegangan Harmonik Terhadap Regulasi Tegangan Eksitasi Generator Satu Fasa
Analisa Pengaruh Tegangan Harmonik Terhadap Regulasi Tegangan Eksitasi Generator Satu Fasa
Esensinya setiap generator listrik satu fasa maupun tiga fasa telah dilengkapi dengan sistem eksitasi. Sistem eksitasi generator ada tiga, yaitu sistem eksitasi statis, dinamis, da...
Optimisasi Penjadwalan Pembangkit pada Microgrid dengan Mempertimbangkan Respons Beban
Optimisasi Penjadwalan Pembangkit pada Microgrid dengan Mempertimbangkan Respons Beban
Abstract – In a smart grid, the adequacy of electricity supply is not only determined by generation, but the electrical demand can also be involved. Demand response is one way to m...
Umjetničko djelo Brede Beban u kontekstu feminističke i postkolonijalne teorije
Umjetničko djelo Brede Beban u kontekstu feminističke i postkolonijalne teorije
I find the key reason in studying this artistic oeuvre in the fact that Breda Beban’s overall oeuvre is less known to the Croatian expert public, and that she has mostly been viewe...
Edukasi Balance Exercise Untuk Meningkatkan Keseimbangan Pada Anak- Anak di TPA Al-Huda Pabelan
Edukasi Balance Exercise Untuk Meningkatkan Keseimbangan Pada Anak- Anak di TPA Al-Huda Pabelan
Keseimbangan merupakan keadaan dari benda Ketika aksi beban yang dihasilkan atau yang bekerja pada benda tersebut adalah nol. Kemampuan dari suatu benda tersebut untuk seimbang dal...
Pengujian Sensor Beban Dinacell Pada Elevator (Studi Pada Elevator Otis)
Pengujian Sensor Beban Dinacell Pada Elevator (Studi Pada Elevator Otis)
Elevator memiliki peranan yang sangant penting dalam aktivitas bangunan yang memiliki beberapa tingkat lantai oleh karena itu dari segi keamanan merupakan hal yang mutlak harus dim...
The Geography of Cyberspace
The Geography of Cyberspace
The Virtual and the Physical
The structure of virtual space is a product of the Internet’s geography and technology. Debates around the nature of the virtual — culture, s...
Kata Fasad dalam Al Quran (Analisis Semantik Al Quran)
Kata Fasad dalam Al Quran (Analisis Semantik Al Quran)
This study aims to find out the concept of the word Fasa>d in the Qur'an and the development of its meaning. The approach used is the semantic approach of the Qur'an proposed by...

