Javascript must be enabled to continue!
The water-carbon constraints’ impact on the development of coal power industry in the Yellow River Basin
View through CrossRef
Abstract
In order to study the influence of water and carbon constraint policies on coal power industry under different scenarios, the government can adjust policies timely according to the simulation results. In this paper, a system dynamics model of coal power industry development under water-carbon dual constraints is constructed. Eight provinces in the Yellow River Basin are selected as the research objects, and the year 2020 is taken as the base year and 2021–2030 is taken as the research time zone to carry out an empirical study. The results show that: (1) under the existing water and carbon quota allocation policy, the profit of coal and power industry in the Yellow River basin will decrease obviously, and the development pressure of coal and power enterprises in the Yellow River basin will increase. (2) Water-carbon constraint has obvious extrusion effect on coal power industry. According to the calculation in this paper, the extrusion capacity will reach 395.17 TWh. (3) The water and carbon quota policy does not constrain the coal power industry at the same time. The existing water quota allocation method matches the ‘2030’ water consumption target, but the carbon quota allocation scheme has weak constraint on the coal and power industry in the Yellow River Basin, so the carbon quota should be tightened. (4) After the tightening of carbon quota, the coal emission reduction technology should be upgraded and improved before 2025. After 2025, the coal emission reduction technology can be mainly restricted by quota. (5) New energy planning should be combined with its own development situation and quota allocation policy. When the amount of coal and electricity extruded by water-carbon constraint is not enough to meet the target of new energy installation, it should be planned according to its own development situation and extrusion amount. When the amount of coal power extruded by water-carbon constraint is enough to meet the target of new energy installation, the amount of coal extruded should be taken as the main planning basis.
Title: The water-carbon constraints’ impact on the development of coal power industry in the Yellow River Basin
Description:
Abstract
In order to study the influence of water and carbon constraint policies on coal power industry under different scenarios, the government can adjust policies timely according to the simulation results.
In this paper, a system dynamics model of coal power industry development under water-carbon dual constraints is constructed.
Eight provinces in the Yellow River Basin are selected as the research objects, and the year 2020 is taken as the base year and 2021–2030 is taken as the research time zone to carry out an empirical study.
The results show that: (1) under the existing water and carbon quota allocation policy, the profit of coal and power industry in the Yellow River basin will decrease obviously, and the development pressure of coal and power enterprises in the Yellow River basin will increase.
(2) Water-carbon constraint has obvious extrusion effect on coal power industry.
According to the calculation in this paper, the extrusion capacity will reach 395.
17 TWh.
(3) The water and carbon quota policy does not constrain the coal power industry at the same time.
The existing water quota allocation method matches the ‘2030’ water consumption target, but the carbon quota allocation scheme has weak constraint on the coal and power industry in the Yellow River Basin, so the carbon quota should be tightened.
(4) After the tightening of carbon quota, the coal emission reduction technology should be upgraded and improved before 2025.
After 2025, the coal emission reduction technology can be mainly restricted by quota.
(5) New energy planning should be combined with its own development situation and quota allocation policy.
When the amount of coal and electricity extruded by water-carbon constraint is not enough to meet the target of new energy installation, it should be planned according to its own development situation and extrusion amount.
When the amount of coal power extruded by water-carbon constraint is enough to meet the target of new energy installation, the amount of coal extruded should be taken as the main planning basis.
Related Results
Potable Water Sources, Household Hygiene, and Sanitation Practices in Ikpoba Okha LGA, Edo State: Implications for Public Health and Sustainable Water Management
Omoregie, Andrew Edosa.1 Omoregie Abieyuwa Peace2 Okoro, Enyinnaya Okoro.3
1 College of Medi
Potable Water Sources, Household Hygiene, and Sanitation Practices in Ikpoba Okha LGA, Edo State: Implications for Public Health and Sustainable Water Management
Omoregie, Andrew Edosa.1 Omoregie Abieyuwa Peace2 Okoro, Enyinnaya Okoro.3
1 College of Medi
BACKGROUND
Access to potable drinking water and sufficient sanitation continues to be an urgent global concern, particularly in developing regions where con...
Research on water immersion damage characteristics and equivalent width of coal pillar
Research on water immersion damage characteristics and equivalent width of coal pillar
Abstract
Affected by weakening effect of water in the goaf, the bearing capacity of coal pillar reduced, and coal pillar rock burst is prone to occur, which is a serious th...
The impact of water resource constraints on industrial linkages in the Yellow River basin
The impact of water resource constraints on industrial linkages in the Yellow River basin
PurposeLow water resource utilization rate, water environment pollution, and water ecology deterioration are unfavorable factors restricting the high-quality development of the Yel...
The CO2 storage in coal seams at the influence of coal fines migration
The CO2 storage in coal seams at the influence of coal fines migration
Abstract: the pressure of the coal seam decays to a certain value due to the production of CH4, the production wells are switched to CO2 injection wells. The injection of CO2 can i...
Constraining simulation uncertainties in a hydrological model of the Congo River Basin including a combined modelling approach for channel-wetland exchanges
Constraining simulation uncertainties in a hydrological model of the Congo River Basin including a combined modelling approach for channel-wetland exchanges
Compared to other large river basins of the world, such as the Amazon, the Congo River Basin appears to be the most ungauged and less studied. This is partly because the basin lack...
Integrated hydrological modelling for sustainable water allocation planning : Mkomazi Basin, South Africa case study
Integrated hydrological modelling for sustainable water allocation planning : Mkomazi Basin, South Africa case study
Allocation of freshwater resources between societal needs and natural ecological systems is of great concern for water managers. This development has challenged decision-makers reg...
Flodfund - Bronzealderdeponeringer fra Gudenåen
Flodfund - Bronzealderdeponeringer fra Gudenåen
River findsBronze Age metalwork from the river GudenåBronze Age metalwork (primarily swords and other weapons) found in European rivers has aroused interest for many years, but lit...

