Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Design Robustness Saves Marco Polo Oil SCR During Its Installation

View through CrossRef
The Marco Polo TLP, located in Green Canyon Block 608 in 4300 ft water depth exports oil and gas through 12-inch oil and 18-inch gas export SCRs that are connected to Marco Polo 14-inch oil and 18inch/20-inch gas export pipelines. Following completion of the installation of the 14-inch oil export pipeline and during the installation of the 12-inch oil export SCR on the seabed (with about 3,000 ft or 77 SCR pipe joints still to go), the operation had to be abandoned due to bad weather and the SCR pipe lowered to the seabed. During the abandonment operation, a high tension event occurred, causing the transition joint between the 14-inch and 12-inch pipes to slide by about 820 ft toward the TLP. This would have the effect of changing the touchdown position along the SCR and consequently the Three Layer Polyethylene abrasion coating would not be located at the at the touchdown to perform its function. In order to move the SCR touchdown area at least partially to the TLPE region, it was decided that four extra joints would be welded to the SCR resulting in the SCR departure angle to changing from 12 degrees to 10 degrees. This paper presents the methodology used for the original design of the oil export SCR and the design robustness, flexibility and margins that allowed for the design to be modified in the last minutes without compromising the integrity of the SCR. The paper also discuss the steps taken to ensure that the modified design is acceptable and within the code requirements. Some strength and fatigue results are presented.
Title: Design Robustness Saves Marco Polo Oil SCR During Its Installation
Description:
The Marco Polo TLP, located in Green Canyon Block 608 in 4300 ft water depth exports oil and gas through 12-inch oil and 18-inch gas export SCRs that are connected to Marco Polo 14-inch oil and 18inch/20-inch gas export pipelines.
Following completion of the installation of the 14-inch oil export pipeline and during the installation of the 12-inch oil export SCR on the seabed (with about 3,000 ft or 77 SCR pipe joints still to go), the operation had to be abandoned due to bad weather and the SCR pipe lowered to the seabed.
During the abandonment operation, a high tension event occurred, causing the transition joint between the 14-inch and 12-inch pipes to slide by about 820 ft toward the TLP.
This would have the effect of changing the touchdown position along the SCR and consequently the Three Layer Polyethylene abrasion coating would not be located at the at the touchdown to perform its function.
In order to move the SCR touchdown area at least partially to the TLPE region, it was decided that four extra joints would be welded to the SCR resulting in the SCR departure angle to changing from 12 degrees to 10 degrees.
This paper presents the methodology used for the original design of the oil export SCR and the design robustness, flexibility and margins that allowed for the design to be modified in the last minutes without compromising the integrity of the SCR.
The paper also discuss the steps taken to ensure that the modified design is acceptable and within the code requirements.
Some strength and fatigue results are presented.

Related Results

Novedades sobre el enterramiento femenino de la Primera Edad del Hierro de Casa del Carpio (Belvís de la Jara, Toledo)
Novedades sobre el enterramiento femenino de la Primera Edad del Hierro de Casa del Carpio (Belvís de la Jara, Toledo)
Las características de la ubicación de la tumba de Casa del Carpio (Belvís de la Jara, Toledo), las circunstancias de su documentación, y lo excepcional del ajuar documentado han c...
Shenzi 16-Inch Oil Export SCR CVA Verification
Shenzi 16-Inch Oil Export SCR CVA Verification
Abstract In 2006 Enterprise developed a 16-inch oil export system from Shenzi field located in Green Canyon Block 653 in the Gulf of Mexico, approximately 120 nau...
A high performance RC-INV triggering SCR under 0.25 µm process
A high performance RC-INV triggering SCR under 0.25 µm process
Purpose As it is known, the electrostatic discharge (ESD) protection design of integrated circuit is very important, among which the silicon controlled rectifier (SCR) is one of th...
SS: Spar Technology- Developments in Deepwater spar installation
SS: Spar Technology- Developments in Deepwater spar installation
Abstract During the last seven years Heerema Marine Contractors (HMC) has installed more than half of all Spars in the deep waters of the Gulf of Mexico. The dual...
Global disparities in surgeons’ workloads, academic engagement and rest periods: the on-calL shIft fOr geNEral SurgeonS (LIONESS) study
Global disparities in surgeons’ workloads, academic engagement and rest periods: the on-calL shIft fOr geNEral SurgeonS (LIONESS) study
AbstractThe workload of general surgeons is multifaceted, encompassing not only surgical procedures but also a myriad of other responsibilities. From April to May 2023, we conducte...
The decade of Serbian water polo
The decade of Serbian water polo
Water polo was originally developed in the British Isles. The colloquial term "aquatic football" was quickly adopted in many countries and their sport systems. With the adoption of...
SS: MODU Anchor: Improved Predictions of MODU Fluke Anchors Increases the Confidence in Mooring System Design
SS: MODU Anchor: Improved Predictions of MODU Fluke Anchors Increases the Confidence in Mooring System Design
Abstract An overview of the current Norwegian and international requirements for design and installation of fluke anchors is given. Important design and installat...

Back to Top