Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Main Cryogenic Heat Exchanger Replacement at Brunei LNG

View through CrossRef
Introduction This paper addresses the economical and technical justification for the rejuvenation of the existing, 33 years old, Brunei LNG plant to extend its lifetime with a third 20-year contract period to 2033. After an introduction into the history of the development of the Brunei LNG plant, and its growth aspirations for the 21st century, the paper will further focus on the current Asset Reference Plan (ARP) and in particular the technical challenges of the replacement of the Main Cryogenic heat exchangers in four out of the five Brunei LNG production trains. Brunei LNG History The construction of Brunei LNG started in 1968, and first LNG was exported to Japan in 1972. The shareholders of the BLNG plant are the Brunei Government (50%), Mitsubishi Corporation (25%) and Shell (25%). Shell Global Solutions, has also been the technical advisor of the Brunei LNG plant since the initial phases of the project. The BLNG project was the first to use the Propane Mixed refrigerant (C3/MR) process, with spool wound main cryogenic heat exchangers. In the original plant, eleven boilers generated the steam for the turbine driven refrigerant compressors. Treated river water is used as cooling medium in an open cooling cycle. Each liquefaction train has a separate gas treating section that consists of an acid gas removal unit, dehydration unit and mercury removal unit. Originally, the BLNG project included four trains with a design capacity of 1.05 MTPA. During construction, the scope was increased with a fifth train of the same capacity. This fifth train started production in 1974. As the main cryogenic heat exchanger of the fifth train was produced later than the original four, an updated design was installed in train 5. First Rejuvenation Between 1992 and 1994, the first rejuvenation and debottlenecking project was carried out at BLNG. In subsequent years plant debottlenecking projects have been implemented and the production capacity reached a maximum of 7.3 MTPA or almost 140% of initial design capacity by 2003 (Fig. 1).
Title: Main Cryogenic Heat Exchanger Replacement at Brunei LNG
Description:
Introduction This paper addresses the economical and technical justification for the rejuvenation of the existing, 33 years old, Brunei LNG plant to extend its lifetime with a third 20-year contract period to 2033.
After an introduction into the history of the development of the Brunei LNG plant, and its growth aspirations for the 21st century, the paper will further focus on the current Asset Reference Plan (ARP) and in particular the technical challenges of the replacement of the Main Cryogenic heat exchangers in four out of the five Brunei LNG production trains.
Brunei LNG History The construction of Brunei LNG started in 1968, and first LNG was exported to Japan in 1972.
The shareholders of the BLNG plant are the Brunei Government (50%), Mitsubishi Corporation (25%) and Shell (25%).
Shell Global Solutions, has also been the technical advisor of the Brunei LNG plant since the initial phases of the project.
The BLNG project was the first to use the Propane Mixed refrigerant (C3/MR) process, with spool wound main cryogenic heat exchangers.
In the original plant, eleven boilers generated the steam for the turbine driven refrigerant compressors.
Treated river water is used as cooling medium in an open cooling cycle.
Each liquefaction train has a separate gas treating section that consists of an acid gas removal unit, dehydration unit and mercury removal unit.
Originally, the BLNG project included four trains with a design capacity of 1.
05 MTPA.
During construction, the scope was increased with a fifth train of the same capacity.
This fifth train started production in 1974.
As the main cryogenic heat exchanger of the fifth train was produced later than the original four, an updated design was installed in train 5.
First Rejuvenation Between 1992 and 1994, the first rejuvenation and debottlenecking project was carried out at BLNG.
In subsequent years plant debottlenecking projects have been implemented and the production capacity reached a maximum of 7.
3 MTPA or almost 140% of initial design capacity by 2003 (Fig.
1).

Related Results

LNG Regasification Vessel - The First Offshore LNG Facility
LNG Regasification Vessel - The First Offshore LNG Facility
Abstract Active studies have been made on the offshore LNG receiving terminal by many people around world. Especially in USA, many actual LNG receiving terminal p...
Development of Innovative LNG Production, Transportation, and Regasification System
Development of Innovative LNG Production, Transportation, and Regasification System
Abstract Development of economic means of gas transportation to long distance has been important technical and economic tasks in gas industries. In addition to th...
LNG Trials of a New 16' Flexible Hose Based LNG Transfer System
LNG Trials of a New 16' Flexible Hose Based LNG Transfer System
Abstract The development of offshore LNG projects, whether for sheltered or harsh environments, represents a vehicle for progress consistent with the LNG market g...
Trade/Investment in LNG - Asia/Pacific Region
Trade/Investment in LNG - Asia/Pacific Region
History/Growth of LNG Business As the world-wide demand for natural gas grows, so too does the international trade in LNG. The growth in gas demand, which in the ...
Floating LNG: New Rule Note for the Classification of LNG FPSO
Floating LNG: New Rule Note for the Classification of LNG FPSO
Abstract Offshore LNG terminals are today broadly considered by the industry to respond to the world thirst of energy in a rapid and efficient manner. In order to...
Reimagine LNG – An Overview of the LNG Market Potentially Leading to a Future AFLOAT
Reimagine LNG – An Overview of the LNG Market Potentially Leading to a Future AFLOAT
Objective / Scope LNG has proven its worth, to meet energy demands throughout the globe at scale, whilst providing the cleanest fossil fuel. To complement the eme...
LNG Imports Into North America and Implications
LNG Imports Into North America and Implications
Abstract The need for LNG to fill the natural gas supply gap in North America may increase dramatically to 2015 and beyond as natural gas demand increases at rate...

Back to Top