Main Cryogenic Heat Exchanger Replacement at Brunei LNG

View through CrossRef
Introduction This paper addresses the economical and technical justification for the rejuvenation of the existing, 33 years old, Brunei LNG plant to extend its lifetime with a third 20-year contract period to 2033. After an introduction into the history of the development of the Brunei LNG plant, and its growth aspirations for the 21st century, the paper will further focus on the current Asset Reference Plan (ARP) and in particular the technical challenges of the replacement of the Main Cryogenic heat exchangers in four out of the five Brunei LNG production trains. Brunei LNG History The construction of Brunei LNG started in 1968, and first LNG was exported to Japan in 1972. The shareholders of the BLNG plant are the Brunei Government (50%), Mitsubishi Corporation (25%) and Shell (25%). Shell Global Solutions, has also been the technical advisor of the Brunei LNG plant since the initial phases of the project. The BLNG project was the first to use the Propane Mixed refrigerant (C3/MR) process, with spool wound main cryogenic heat exchangers. In the original plant, eleven boilers generated the steam for the turbine driven refrigerant compressors. Treated river water is used as cooling medium in an open cooling cycle. Each liquefaction train has a separate gas treating section that consists of an acid gas removal unit, dehydration unit and mercury removal unit. Originally, the BLNG project included four trains with a design capacity of 1.05 MTPA. During construction, the scope was increased with a fifth train of the same capacity. This fifth train started production in 1974. As the main cryogenic heat exchanger of the fifth train was produced later than the original four, an updated design was installed in train 5. First Rejuvenation Between 1992 and 1994, the first rejuvenation and debottlenecking project was carried out at BLNG. In subsequent years plant debottlenecking projects have been implemented and the production capacity reached a maximum of 7.3 MTPA or almost 140% of initial design capacity by 2003 (Fig. 1).
Title: Main Cryogenic Heat Exchanger Replacement at Brunei LNG
Description:
Introduction This paper addresses the economical and technical justification for the rejuvenation of the existing, 33 years old, Brunei LNG plant to extend its lifetime with a third 20-year contract period to 2033.
After an introduction into the history of the development of the Brunei LNG plant, and its growth aspirations for the 21st century, the paper will further focus on the current Asset Reference Plan (ARP) and in particular the technical challenges of the replacement of the Main Cryogenic heat exchangers in four out of the five Brunei LNG production trains.
Brunei LNG History The construction of Brunei LNG started in 1968, and first LNG was exported to Japan in 1972.
The shareholders of the BLNG plant are the Brunei Government (50%), Mitsubishi Corporation (25%) and Shell (25%).
Shell Global Solutions, has also been the technical advisor of the Brunei LNG plant since the initial phases of the project.
The BLNG project was the first to use the Propane Mixed refrigerant (C3/MR) process, with spool wound main cryogenic heat exchangers.
In the original plant, eleven boilers generated the steam for the turbine driven refrigerant compressors.
Treated river water is used as cooling medium in an open cooling cycle.
Each liquefaction train has a separate gas treating section that consists of an acid gas removal unit, dehydration unit and mercury removal unit.
Originally, the BLNG project included four trains with a design capacity of 1.
05 MTPA.
During construction, the scope was increased with a fifth train of the same capacity.
This fifth train started production in 1974.
As the main cryogenic heat exchanger of the fifth train was produced later than the original four, an updated design was installed in train 5.
First Rejuvenation Between 1992 and 1994, the first rejuvenation and debottlenecking project was carried out at BLNG.
In subsequent years plant debottlenecking projects have been implemented and the production capacity reached a maximum of 7.
3 MTPA or almost 140% of initial design capacity by 2003 (Fig.
1).

Related Results

LNG Regasification Vessel - The First Offshore LNG Facility
LNG Regasification Vessel - The First Offshore LNG Facility
Abstract Active studies have been made on the offshore LNG receiving terminal by many people around world. Especially in USA, many actual LNG receiving terminal p...
Development of Innovative LNG Production, Transportation, and Regasification System
Development of Innovative LNG Production, Transportation, and Regasification System
Abstract Development of economic means of gas transportation to long distance has been important technical and economic tasks in gas industries. In addition to th...
Floating LNG: New Rule Note for the Classification of LNG FPSO
Floating LNG: New Rule Note for the Classification of LNG FPSO
Abstract Offshore LNG terminals are today broadly considered by the industry to respond to the world thirst of energy in a rapid and efficient manner. In order to...
Reimagine LNG – An Overview of the LNG Market Potentially Leading to a Future AFLOAT
Reimagine LNG – An Overview of the LNG Market Potentially Leading to a Future AFLOAT
Objective / Scope LNG has proven its worth, to meet energy demands throughout the globe at scale, whilst providing the cleanest fossil fuel. To complement the eme...
Assessing the role of LNG in global carbon neutrality efforts: A project management review
Assessing the role of LNG in global carbon neutrality efforts: A project management review
This paper review explores the role of LNG in the context of global carbon neutrality efforts. It examines various aspects such as the current state of LNG usage, its environmental...
Fueling the Future: Advancing Energy Sustainability through Computational Modeling and Optimization of LNG Production Units
Fueling the Future: Advancing Energy Sustainability through Computational Modeling and Optimization of LNG Production Units
The global energy landscape is undergoing a transformative shift, and the potential of LNG as a major energy source is a topic of intense debate. In order to meet the growing deman...
How to Digitalize Green LNG and Value Carbon-Neutral LNG Cargos with Blockchain Technology and Digital Assets
How to Digitalize Green LNG and Value Carbon-Neutral LNG Cargos with Blockchain Technology and Digital Assets
Abstract In this paper we present our Blockchain-based solution to digitalize green LNG (liquefied natural gas); how with our digital asset, we create the differenti...
The Need to Factor Asset Risk Into LNG Terminal Agreement Negotiations
The Need to Factor Asset Risk Into LNG Terminal Agreement Negotiations
Abstract As developers race around the globe building liquefied natural gas ("LNG") terminals, companies acquiring capacity at those terminals are analyzing their...