Javascript must be enabled to continue!
Probabilistic Exergoeconomic Analysis of Transcorp Power Plant Ughelli
View through CrossRef
In this study, the probabilistic exergoeconomic analysis was performed for four industrial gas turbine (GT) units comprising of two (GT16 and GT19) units of 100MW GE engine and two (GT8 and GT12) units of 25MW Hitachi engine at Transcorp Power Limited, Ughelli. These four industrial GT engine units were modelled and simulated using natural gas as fuel. The design point (DP) simulation results of the modelled GT engines were validated with the available DP thermodynamic data from original equipment manufacturer (OEM). This was done before the off-design point (ODP) simulation was carried out which represents the plant operations. The results obtained from exergy analysis at full load operation show that the turbine has the highest exergy efficiency followed by compressor and combustion having the least. For turbines these were 96.13% for GT8 unit, 98.02% for GT12 unit, 96.26% for GT16 unit, and 96.30% for GT19 unit. Moreover, the combustion chamber has the highest exergy destruction efficiency of 55.16% GT8 unit, 56.58% GT12 unit, 43.90% GT16 unit, and 43.30% GT19 unit respectively. The exergy analysis results obtained from the four units show that the combustion chamber (CC) is the most significant exergy destruction with lowest exergy efficiency and highest exergy destruction efficiency of plant components. The exergoeconomic analysis results from four units showed combustion chamber energy destruction cost of 531.08 $/h GT8 unit, 584.53 $/h GT12 unit, 2351.81$/h GT16, and 2315.93$/h GT19 unit. The probabilistic results analysis based on the input parameters distributions evaluated and discussed.
Title: Probabilistic Exergoeconomic Analysis of Transcorp Power Plant Ughelli
Description:
In this study, the probabilistic exergoeconomic analysis was performed for four industrial gas turbine (GT) units comprising of two (GT16 and GT19) units of 100MW GE engine and two (GT8 and GT12) units of 25MW Hitachi engine at Transcorp Power Limited, Ughelli.
These four industrial GT engine units were modelled and simulated using natural gas as fuel.
The design point (DP) simulation results of the modelled GT engines were validated with the available DP thermodynamic data from original equipment manufacturer (OEM).
This was done before the off-design point (ODP) simulation was carried out which represents the plant operations.
The results obtained from exergy analysis at full load operation show that the turbine has the highest exergy efficiency followed by compressor and combustion having the least.
For turbines these were 96.
13% for GT8 unit, 98.
02% for GT12 unit, 96.
26% for GT16 unit, and 96.
30% for GT19 unit.
Moreover, the combustion chamber has the highest exergy destruction efficiency of 55.
16% GT8 unit, 56.
58% GT12 unit, 43.
90% GT16 unit, and 43.
30% GT19 unit respectively.
The exergy analysis results obtained from the four units show that the combustion chamber (CC) is the most significant exergy destruction with lowest exergy efficiency and highest exergy destruction efficiency of plant components.
The exergoeconomic analysis results from four units showed combustion chamber energy destruction cost of 531.
08 $/h GT8 unit, 584.
53 $/h GT12 unit, 2351.
81$/h GT16, and 2315.
93$/h GT19 unit.
The probabilistic results analysis based on the input parameters distributions evaluated and discussed.
Related Results
Inventory and pricing management in probabilistic selling
Inventory and pricing management in probabilistic selling
Context: Probabilistic selling is the strategy that the seller creates an additional probabilistic product using existing products. The exact information is unknown to customers u...
New Correlations for Predicting Niger Delta Oil Reservoirs Recovery Factors
New Correlations for Predicting Niger Delta Oil Reservoirs Recovery Factors
Abstract
The importance of estimating an asset's expected oil recovery factor (RF) cannot be overemphasized. It remains an essential step in asset valuation and can ...
ANALYSIS OF THE OPERATION MODE OF THE SOLAR POWER PLANT
ANALYSIS OF THE OPERATION MODE OF THE SOLAR POWER PLANT
The article examines the load change schedule of the solar power plant in the Ukraine-Moldova energy union. The analysis of data averaged at minute and 15-minute intervals in the p...
IMPACT OF PETROCHEMICAL ACTIVITIES ON THE PHYSICOCHEMICAL AND MICROBIOLOGICAL QUALITY OF SURFACE WATER, GROUND WATER AND SOIL IN OTU-JEREMI, IWEREHKAN AND OKPARE COMMUNITIES, UGHELLI SOUTH LOCAL GOVERNMENT AREA, DELTA STATE, NIGERIA
IMPACT OF PETROCHEMICAL ACTIVITIES ON THE PHYSICOCHEMICAL AND MICROBIOLOGICAL QUALITY OF SURFACE WATER, GROUND WATER AND SOIL IN OTU-JEREMI, IWEREHKAN AND OKPARE COMMUNITIES, UGHELLI SOUTH LOCAL GOVERNMENT AREA, DELTA STATE, NIGERIA
The effects of petrochemical activities on the physicochemical and microbiological properties of surface water, ground water and soil from three different communities (Otu-Jeremi, ...
ProPower: A new tool to assess the value of probabilistic forecasts in power systems management
ProPower: A new tool to assess the value of probabilistic forecasts in power systems management
Objective and BackgroundEnsemble weather forecasts have been promoted by meteorologists for use due to their inherent capability of quantifying forecast uncertainty. Despite this a...
[RETRACTED] Keto Max Power - BURN FATINSTEAD OF CARBS with Keto Max Power! v1
[RETRACTED] Keto Max Power - BURN FATINSTEAD OF CARBS with Keto Max Power! v1
[RETRACTED]Keto Max Power Reviews: Warning! Don’t Buy Dragons Den Pills Fast Until You Read This UK Latest Report Weight gain’s principle of “energy intake exceeding energy spent”...
Optimisation in Neurosymbolic Learning Systems
Optimisation in Neurosymbolic Learning Systems
In the last few years, Artificial Intelligence (AI) has reached the public consciousness through high-profile applications such as chatbots, image generators, speech synthesis and ...
Diversity of Plant community in Satun Geopark
Diversity of Plant community in Satun Geopark
Background and Objectives: The diversity of species and plant communities varies among the areas. Understanding of species and their habitats is vital on conservation and sustainab...

