Javascript must be enabled to continue!
Development of Flood Forecasting System for Someshwari-Kangsa Sub-watershed of Bangladesh-India Using Different Machine Learning Techniques
View through CrossRef
<p>Floods are natural disasters caused mainly due to heavy or excessive rainfall. They induce massive economic losses in Bangladesh every year. Physically-based flood prediction models have been used over the years where simplified forms of physical laws are used to reduce calculations' complexity. It sometimes leads to oversimplification and inaccuracy in the prediction. Moreover, a physically-based model requires intensive monitoring datasets for calibration, accurate soil properties information, and a heavy computational facility, creating an impediment for quick, economical and precise short-term prediction. Researchers have tried different approaches like empirical data-driven models, especially machine learning-based models, to offer an alternative approach to the physically-based models but focused on developing only one machine learning (ML) technique at a time (i.e., ANN, MLP, etc.). There are many other techniques, algorithms, and models in machine learning (ML) technology that have the potential to be effective and efficient in flood forecasting. In this study, five different machine learning algorithms- exponent back propagation neural network (EBPNN), multilayer perceptron (MLP), support vector regression (SVR), DT Regression (DTR), and extreme gradient boosting (XGBoost) were used to develop total 180 independent models based on a different combination of time lags for input data and lead time in forecast. Models were developed for Someshwari-Kangsa sub-watershed of Bangladesh's North Central hydrological region with 5772 km<sup>2</sup> drainage area. It is also a data-scarce region with only three hydrological and hydro-meteorological stations for the whole sub-watershed. This region mostly suffers extreme meteorological events driven flooding. Therefore, satellite-based precipitation, temperature, relative humidity, wind speed data, and observed water level data from the Bangladesh Water Development Board (BWDB) were used as input and response variables.</p><p>For comparison, the accuracy of these models was evaluated using different statistical indices - coefficient of determination, mean square error (MSE), mean absolute error (MAE), mean relative error (MRE), explained variance score and normalized centred root mean square error (NCRMSE). Developed models were ranked based on the coefficient of determination (R<sup>2</sup>) value. All the models performed well with R<sup>2</sup> being greater than 0.85 in most cases. Further analysis of the model results showed that most of the models performed well for forecasting 24-hour lead time water level. Models developed using XGBoost algorithm outperformed other models in all metrics. Moreover, each of the algorithms' best-performed models was extended further up to 20 days lead time to generate forecasting horizon. Models demonstrated remarkable consistency in their performance with the coefficient of determination (R<sup>2</sup>) being greater than 0.70 at 20 days lead-time of forecasting horizon in most cases except the DTR-based model. For 10- and 5-days lead time of forecasting horizon, it was greater than 0.75 and 0.80 respectively, for all the model extended. This study concludes that the machine algorithm-based data-driven model can be a powerful tool for flood forecasting in data-scarce regions with excellent accuracy, quick building and running time, and economic feasibility.</p>
Title: Development of Flood Forecasting System for Someshwari-Kangsa Sub-watershed of Bangladesh-India Using Different Machine Learning Techniques
Description:
<p>Floods are natural disasters caused mainly due to heavy or excessive rainfall.
They induce massive economic losses in Bangladesh every year.
Physically-based flood prediction models have been used over the years where simplified forms of physical laws are used to reduce calculations' complexity.
It sometimes leads to oversimplification and inaccuracy in the prediction.
Moreover, a physically-based model requires intensive monitoring datasets for calibration, accurate soil properties information, and a heavy computational facility, creating an impediment for quick, economical and precise short-term prediction.
Researchers have tried different approaches like empirical data-driven models, especially machine learning-based models, to offer an alternative approach to the physically-based models but focused on developing only one machine learning (ML) technique at a time (i.
e.
, ANN, MLP, etc.
).
There are many other techniques, algorithms, and models in machine learning (ML) technology that have the potential to be effective and efficient in flood forecasting.
In this study, five different machine learning algorithms- exponent back propagation neural network (EBPNN), multilayer perceptron (MLP), support vector regression (SVR), DT Regression (DTR), and extreme gradient boosting (XGBoost) were used to develop total 180 independent models based on a different combination of time lags for input data and lead time in forecast.
Models were developed for Someshwari-Kangsa sub-watershed of Bangladesh's North Central hydrological region with 5772 km<sup>2</sup> drainage area.
It is also a data-scarce region with only three hydrological and hydro-meteorological stations for the whole sub-watershed.
This region mostly suffers extreme meteorological events driven flooding.
Therefore, satellite-based precipitation, temperature, relative humidity, wind speed data, and observed water level data from the Bangladesh Water Development Board (BWDB) were used as input and response variables.
</p><p>For comparison, the accuracy of these models was evaluated using different statistical indices - coefficient of determination, mean square error (MSE), mean absolute error (MAE), mean relative error (MRE), explained variance score and normalized centred root mean square error (NCRMSE).
Developed models were ranked based on the coefficient of determination (R<sup>2</sup>) value.
All the models performed well with R<sup>2</sup> being greater than 0.
85 in most cases.
Further analysis of the model results showed that most of the models performed well for forecasting 24-hour lead time water level.
Models developed using XGBoost algorithm outperformed other models in all metrics.
Moreover, each of the algorithms' best-performed models was extended further up to 20 days lead time to generate forecasting horizon.
Models demonstrated remarkable consistency in their performance with the coefficient of determination (R<sup>2</sup>) being greater than 0.
70 at 20 days lead-time of forecasting horizon in most cases except the DTR-based model.
For 10- and 5-days lead time of forecasting horizon, it was greater than 0.
75 and 0.
80 respectively, for all the model extended.
This study concludes that the machine algorithm-based data-driven model can be a powerful tool for flood forecasting in data-scarce regions with excellent accuracy, quick building and running time, and economic feasibility.
</p>.
Related Results
ASP Flood After a Polymer Flood vs. ASP Flood After a Water Flood
ASP Flood After a Polymer Flood vs. ASP Flood After a Water Flood
Abstract
Alkaline-surfactant-polymer (ASP) flooding is an effective technique to improve oil recovery. It has been applied typically after a water flood. Recently, t...
Probabilistic Flood Hazard Maps at Ungauged Locations Using Multivariate Extreme Values Approach
Probabilistic Flood Hazard Maps at Ungauged Locations Using Multivariate Extreme Values Approach
<p>Flood hazard maps are essential for development and assessment of flood risk management strategies. Conventionally, flood hazard assessment is based on determinist...
Application of storm transposition to the Middle Cedar Watershed
Application of storm transposition to the Middle Cedar Watershed
<p>On June 13, 2008, after many days of rain, the Cedar River flooded the city of Cedar Rapids. With a peak discharge of 139,987 cfs and at 19.12 feet above flood stage, the ...
Selection of Injectable Drug Product Composition using Machine Learning Models (Preprint)
Selection of Injectable Drug Product Composition using Machine Learning Models (Preprint)
BACKGROUND
As of July 2020, a Web of Science search of “machine learning (ML)” nested within the search of “pharmacokinetics or pharmacodynamics” yielded over 100...
Evaluation of Flood Forecasting, Early Warning System and its Role in Flood Management in Indus basin, Pakistan
Evaluation of Flood Forecasting, Early Warning System and its Role in Flood Management in Indus basin, Pakistan
This paper evaluates the effectiveness of Flood Forecasting and Early Warning (FF&EWS) in the Indus basin, Pakistan. It is non-structural measures, used extensively. It forecas...
Enhancing Agro-ecosystem Services through Integrated Watershed Management in Etmadpur Watershed of Agra, Uttar Pradesh, India
Enhancing Agro-ecosystem Services through Integrated Watershed Management in Etmadpur Watershed of Agra, Uttar Pradesh, India
The changing climate affects agriculture sector severely especially in developing countries like India. To overcome such impacts, the Government of India has undertaken several ada...
Current Perspectives on Cystic Echinococcosis: A Systematic Review
Current Perspectives on Cystic Echinococcosis: A Systematic Review
Abstract
Introduction: Hydatidosis, a zoonotic disease caused by the larval stage of Echinococcus granulosus, is a significant public health concern with notable economic impact. I...
Fast flood modelling for pluvial flood management in Innsbruck, Austria
Fast flood modelling for pluvial flood management in Innsbruck, Austria
Fast flood modelling for pluvial flood management in Innsbruck, AustriaThe increasing frequency and intensity of precipitation events leads to urban flooding, often causing signifi...

