Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Control of floor heave with rock bolts-steel piles coupling support technology

View through CrossRef
Abstract The uncontrolled floor heave in gob-side entry retaining is the serious problem of underground coal mining. This phenomenon has gravely restricted the application of pillarless mining that has been increasingly used in coal mines in recent years. This study proposes rock bolts-steel piles coupling support method to control severe floor heaves in gob-side entry retaining. This study employs finite element method to analyze stress-strain state in surrounding rocks around gob-side entry retaining. It was found that essential floor heave was caused by high horizontal stresses, which were transmitted from the sides of the entry, and vertical delamination of floor strata in the post-peak strains zone under the entry span. These processes complement each other and aggravate the floor heave. This paper proposes four floor reinforcement schemes. As a result of the study, the most effective floor reinforcement scheme was determined, which consists of 3 elements: steel piles installed in the corners of the entry, rock bolts installed between the piles and a steel belt that coupled the bolts in entry floor. The combination of the advantages of floor reinforcement with bolts and steel piles was the basis for the design of rock bolts-steel piles coupling technology. As a result, the post-peak strain and stress areas are the smallest, and floor heave reduces by 80%. Compared with other reinforcement methods, the advantages of rock bolts-steel piles coupling technology were successfully defined in controlling effect.
Title: Control of floor heave with rock bolts-steel piles coupling support technology
Description:
Abstract The uncontrolled floor heave in gob-side entry retaining is the serious problem of underground coal mining.
This phenomenon has gravely restricted the application of pillarless mining that has been increasingly used in coal mines in recent years.
This study proposes rock bolts-steel piles coupling support method to control severe floor heaves in gob-side entry retaining.
This study employs finite element method to analyze stress-strain state in surrounding rocks around gob-side entry retaining.
It was found that essential floor heave was caused by high horizontal stresses, which were transmitted from the sides of the entry, and vertical delamination of floor strata in the post-peak strains zone under the entry span.
These processes complement each other and aggravate the floor heave.
This paper proposes four floor reinforcement schemes.
As a result of the study, the most effective floor reinforcement scheme was determined, which consists of 3 elements: steel piles installed in the corners of the entry, rock bolts installed between the piles and a steel belt that coupled the bolts in entry floor.
The combination of the advantages of floor reinforcement with bolts and steel piles was the basis for the design of rock bolts-steel piles coupling technology.
As a result, the post-peak strain and stress areas are the smallest, and floor heave reduces by 80%.
Compared with other reinforcement methods, the advantages of rock bolts-steel piles coupling technology were successfully defined in controlling effect.

Related Results

Numerical study of the interaction of rock bolts with the block-structured rock mass
Numerical study of the interaction of rock bolts with the block-structured rock mass
In order to ground parameters of rock bolting for mine workings, it is necessary to study the stressedly-deformed state of the host rock and the elements of rock bolting. Under cer...
Long Buoyant Flexible Pile Frames for Support of Deepwater Offshore Platforms
Long Buoyant Flexible Pile Frames for Support of Deepwater Offshore Platforms
ABSTRACT This paper is about Long Buoyant Flexible Pile Frames for support of deep-water offshore platforms. These Long Buoyant Flexible Pile Frame structures com...
Casting and installation of segmental precast quadratic concrete driven geothermal energy piles
Casting and installation of segmental precast quadratic concrete driven geothermal energy piles
Geothermal energy pile foundations are used both for structural purposes and to provide sustainable, clean, and cost-effective ground energy for heating and cooling buildings [1]. ...
Pile Groups Under Long-Term Cyclic Thermal Loading
Pile Groups Under Long-Term Cyclic Thermal Loading
This study presents the cyclic load-displacement response of thermal piles in a pile group consisting of thermal and mechanical piles. To investigate the effect of different (i) la...

Back to Top