Failure Index Reduction Strategy for Artificial Lift Systems in Cira Infantas Field
View through CrossRef
Abstract
The Cira Infantas Field is located in the Middle Magdalena Valley Basin. It was discovered in 1918, the first oil producing field in Colombia, reaching a peak production of 53,000 BOPD in 1939. The field has been subject to different methods of secondary recovery, gas injection and waterflooding since then. In 2006, a waterflooding redevelopment with injection-production system optimization was started. In the first year, oil production increased from 4,500 BOPD to 9,800 BOPD and injection increased from 12,000 BWIPD to 36,000 BWIPD.
After an increase of the Failure Index in 2012, the artificial lift team developed a strategy to reduce this performance indicator based on process improvements including supply chain, design, storage, installation procedures, well start up and well surveillance.
As of December 2014, the field has 1000 producing wells and 408 injectors. The most common artificial lift system (ALS) is Beam Pump (BP) with 760 wells; followed by Progressive Cavity Pump (PCP) with 135 wells; Electrical Submersible Pump (ESP) with 99 wells and Electrical Submersible Progressive Cavity Pump (ESPCP) with 6 wells. The main failure causes are associated with sand, corrosion (CO2 is present), poor monitoring and operation procedures among others.
The application of the Root Cause Failure Analysis, RCFA was the first step to identify the artificial lift problems to be solved. One of the first conclusions showed the necessity to redefine the production range for the different ALS. This is an example that the problems are not always associated to the reservoir fluids, leading the team to define a strategy that covers all stages where ALS's are involved. The new implemented strategy yield a reduction in the ALS failure index from 0.67 to 0.47 in just 24 months. The savings enabled the operation to carry out additional well work (Workover & Well service) without additional funding.
Title: Failure Index Reduction Strategy for Artificial Lift Systems in Cira Infantas Field
Description:
Abstract
The Cira Infantas Field is located in the Middle Magdalena Valley Basin.
It was discovered in 1918, the first oil producing field in Colombia, reaching a peak production of 53,000 BOPD in 1939.
The field has been subject to different methods of secondary recovery, gas injection and waterflooding since then.
In 2006, a waterflooding redevelopment with injection-production system optimization was started.
In the first year, oil production increased from 4,500 BOPD to 9,800 BOPD and injection increased from 12,000 BWIPD to 36,000 BWIPD.
After an increase of the Failure Index in 2012, the artificial lift team developed a strategy to reduce this performance indicator based on process improvements including supply chain, design, storage, installation procedures, well start up and well surveillance.
As of December 2014, the field has 1000 producing wells and 408 injectors.
The most common artificial lift system (ALS) is Beam Pump (BP) with 760 wells; followed by Progressive Cavity Pump (PCP) with 135 wells; Electrical Submersible Pump (ESP) with 99 wells and Electrical Submersible Progressive Cavity Pump (ESPCP) with 6 wells.
The main failure causes are associated with sand, corrosion (CO2 is present), poor monitoring and operation procedures among others.
The application of the Root Cause Failure Analysis, RCFA was the first step to identify the artificial lift problems to be solved.
One of the first conclusions showed the necessity to redefine the production range for the different ALS.
This is an example that the problems are not always associated to the reservoir fluids, leading the team to define a strategy that covers all stages where ALS's are involved.
The new implemented strategy yield a reduction in the ALS failure index from 0.
67 to 0.
47 in just 24 months.
The savings enabled the operation to carry out additional well work (Workover & Well service) without additional funding.
Related Results
Fundamental study on rope vibration suppression by middle transfer floor using risk information
Fundamental study on rope vibration suppression by middle transfer floor using risk information
Lifts are essential for means of vertical transportation. Recently, the lifts installed in the high-rise buildings are long travel, thus the lift ropes are becoming longer. The nat...
Frequency of Common Chromosomal Abnormalities in Patients with Idiopathic Acquired Aplastic Anemia
Frequency of Common Chromosomal Abnormalities in Patients with Idiopathic Acquired Aplastic Anemia
Objective: To determine the frequency of common chromosomal aberrations in local population idiopathic determine the frequency of common chromosomal aberrations in local population...
Gas Lift Journey to Maximize the Asset Value in Platong Field, Gulf of Thailand
Gas Lift Journey to Maximize the Asset Value in Platong Field, Gulf of Thailand
Abstract
Operating Platong field in the Gulf of Thailand (GoT) is challenging because of the small compartmentalized reservoirs in the fluvial deposition environm...
Gas Lift - Past & Future
Gas Lift - Past & Future
Abstract
This paper will describe the evolution of gas lift systems over the past few decades, making parallels with other artificial lift technologies (ESP, SRP, an...
Pig Lift: A New Artificial Lift Method
Pig Lift: A New Artificial Lift Method
Abstract
Artificial lift of oil wells is a fairly broad subject. There are many different methods available but in a few cases none of them turns out to be a fit ...
Field Scale Research on Artificial Lift
Field Scale Research on Artificial Lift
Abstract
A field test loop to conduct experiments on artificial lift has been built and it is already in operation. A detailed description of the test loop is p...
Artificial Lift Selection Strategy to Maximize Unconventional Oil and Gas Assets Value
Artificial Lift Selection Strategy to Maximize Unconventional Oil and Gas Assets Value
Abstract
The challenges of producing and lifting unconventional oil and gas economically is no doubt the most daunting phase of unconventional oil and gas developmen...
Artificial Lift, A Major Unresolved Issue for SAGD
Artificial Lift, A Major Unresolved Issue for SAGD
Abstract
Most SAGD projects currently operate at high enough pressure to utilize steam/gas lift. However, there are expected to be many applications where lower p...