Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Exploration of building adaptations and retrofitting challenges in Ghana

View through CrossRef
Purpose– The Ghanaian banking industry has over the last 20 years witnessed tremendous growth to the extent that rural banks are now expanding their activities into urban centres. Hitherto, rural banks operated in rural and peri-urban areas in Ghana, but nowadays, there is an upsurge of rural banks activities in the urban centres of Ghana; and, they operate from rented premises, most of which are existing buildings in the urban areas. To meet the banking demands and the urban banking competitions such as the introduction of new technologies and regulations, the rural banks endeavour to expand (refurbish) the old/existing buildings with inherent adaptation and retrofitting challenges. Even though, adaptation and retrofit projects may not be popular in Ghana at large scales, this paper through combined methodology of constructive dialogue, case studies and condition survey approaches presents rural banks projects in Ghana as case studies of refurbishment and maintenance to “unearth” and resonate some key challenges of managing adaptation and retrofits in Ghana for future effective projects management solutions during their conception and execution. The paper aims to discuss these issues.Design/methodology/approach– Through combined methodology of constructive dialogue, case studies and condition survey approaches this paper presents rural banks projects in Ghana as case studies of refurbishment and maintenance to “unearth” and resonate some key challenges of adaptation and retrofit projects.Findings– The condition survey revealed unprecedented infrastructural drive by rural banks throughout Ghana and their desire to penetrate the urban areas as well. However, this drive unfortunately as it appeared, is not informed and carried out within the confines and dictates of existing legislations in Ghana. Again, it was found that adaptations and retrofitting will improve and integrate the rural banks in the urban economy through prudent project management practices.Research limitations/implications– Availability of local researches and literature on adaptations and retrofitting as project management practices in Ghana.Practical implications– Retrofitting and adaptation projects in Ghana is crucial for project management practices on low-impact building as Ghana faces energy challenges.Social implications– This research brings to bear realistic programme to build capacity of personnel to strategically integrate the rural banks into the central banking system of Ghana as well as project management practices through better and effective monitoring for social, ethical and equity impacts of their project managers.Originality/value– Apparently, adaptation and retrofit projects are not be popular in Ghana at large scales and this is the first time an academic paper of a kind has been written to guide and manage future adaptation and retrofit projects during their conception and execution as well as project management practices in general.
Title: Exploration of building adaptations and retrofitting challenges in Ghana
Description:
Purpose– The Ghanaian banking industry has over the last 20 years witnessed tremendous growth to the extent that rural banks are now expanding their activities into urban centres.
Hitherto, rural banks operated in rural and peri-urban areas in Ghana, but nowadays, there is an upsurge of rural banks activities in the urban centres of Ghana; and, they operate from rented premises, most of which are existing buildings in the urban areas.
To meet the banking demands and the urban banking competitions such as the introduction of new technologies and regulations, the rural banks endeavour to expand (refurbish) the old/existing buildings with inherent adaptation and retrofitting challenges.
Even though, adaptation and retrofit projects may not be popular in Ghana at large scales, this paper through combined methodology of constructive dialogue, case studies and condition survey approaches presents rural banks projects in Ghana as case studies of refurbishment and maintenance to “unearth” and resonate some key challenges of managing adaptation and retrofits in Ghana for future effective projects management solutions during their conception and execution.
The paper aims to discuss these issues.
Design/methodology/approach– Through combined methodology of constructive dialogue, case studies and condition survey approaches this paper presents rural banks projects in Ghana as case studies of refurbishment and maintenance to “unearth” and resonate some key challenges of adaptation and retrofit projects.
Findings– The condition survey revealed unprecedented infrastructural drive by rural banks throughout Ghana and their desire to penetrate the urban areas as well.
However, this drive unfortunately as it appeared, is not informed and carried out within the confines and dictates of existing legislations in Ghana.
Again, it was found that adaptations and retrofitting will improve and integrate the rural banks in the urban economy through prudent project management practices.
Research limitations/implications– Availability of local researches and literature on adaptations and retrofitting as project management practices in Ghana.
Practical implications– Retrofitting and adaptation projects in Ghana is crucial for project management practices on low-impact building as Ghana faces energy challenges.
Social implications– This research brings to bear realistic programme to build capacity of personnel to strategically integrate the rural banks into the central banking system of Ghana as well as project management practices through better and effective monitoring for social, ethical and equity impacts of their project managers.
Originality/value– Apparently, adaptation and retrofit projects are not be popular in Ghana at large scales and this is the first time an academic paper of a kind has been written to guide and manage future adaptation and retrofit projects during their conception and execution as well as project management practices in general.

Related Results

Energy Retrofitting Technologies of Buildings: A Review-Based Assessment
Energy Retrofitting Technologies of Buildings: A Review-Based Assessment
Demand for energy and resources is increasing day by day. The construction industry plays a major role in the consumption of energy and resources. Buildings that were built before ...
Retrofitting existing buildings for sustainability: Challenges and innovations
Retrofitting existing buildings for sustainability: Challenges and innovations
Retrofitting existing buildings for sustainability is a critical strategy in addressing the environmental impact of the built environment, enhancing economic benefits, and improvin...
Deconstructing the Barriers to ASRH in Contemporary Ghana
Deconstructing the Barriers to ASRH in Contemporary Ghana
Adolescent Sexual Reproductive Health (ASRH) is crucial for the physical, emotional, and social well-being of adolescents. The paper aims to identify the barriers to ASRH in Ghana ...
Sustainable Retrofitting of Existing Buildings: Techniques and Case Studies
Sustainable Retrofitting of Existing Buildings: Techniques and Case Studies
Retrofitting existing buildings for sustainability has become a critical endeavor in the quest for more energy-efficient and environmentally friendly built environments. This abstr...
The Export Competitiveness of Ghana’s Cocoa Industry in West Africa
The Export Competitiveness of Ghana’s Cocoa Industry in West Africa
Ghana in the year 1911 became the world’s largest exporter of cocoa. However, cocoa export in Ghana nearly came to standstill in the 1970s as a result of the outbreak of ...
The influence of logistics management on food security in Ghana
The influence of logistics management on food security in Ghana
Research problem warehouse Food insecurity has been reported to be increasing in Ghana despite recent government logistics infrastructure (warehouses) efforts. It is important to u...
Retrofitting for Lathe Machines
Retrofitting for Lathe Machines
Old machines often breakdown unpredictably increasing your expenses through maintenance costs and lost production. In the present era various modern technologies are been emerging ...

Back to Top