The process of mining granite in PT Aditya Buana Inter is mined with an open pit (quarry)system. The granite blasting system at PT Aditya Buana Inter consisted of 5 blasting and with 386holes of explosive holes obtained, the total institutional volume was 199.996 m3 (BCM) and the totalvolume of blasting was 13001, 7 m3 (BCM) of the target company of 16,000 m3 (BCM) / month. Drillingand blasting activities to produce blasting volumes of course there are factors that influence theseactivities. Factors that influence drilling and blasting activities affect the costs incurred and the volumeof blasting results produced, the factors that influence these activities include: weather, frontconditions, equipment damage, less optimal blasting geometry measurements. The activity is certainlynot inseparable from the costs that must be incurred by PT Aditya Buana Inter both fixed costs andvariable costs. The total costs incurred by PT Aditya Buana Inter on September 2, 2018 to October4, 2018 are Rp 352,677,200.00 which includes fixed costs of Rp 170,616,020.00 and variable costs(variable costs) of Rp 182,061,000.00, and variable costs per m3 the volume of blasting yield is Rp14,003 /m3. Break even points obtained from calculations for units are 812,468 m3 and in rupiah Rp181,992,901.00. PT Aditya Buana Inter income from the sale of split stone is Rp 472,846,080.00obtained from the sales volume of 2110.92 m3 with a selling price of Rp 224,000 /m3, the profit (L)obtained is Rp 90,610,140.00. Calculation of Break Even Point analysis can determine the minimumamount of volume of rock from the blasting that will be produced and to find out the condition of thecompany not making a profit and also not losing.
Title: ANALISIS BREAK EVEN POINT HASIL PELEDAKAN BATU GRANIT PADA UNIT PELEDAKAN PT ADITYA BUANA INTER DI KECAMATAN MERAWANG KABUPATEN BANGKA
Description:
The process of mining granite in PT Aditya Buana Inter is mined with an open pit (quarry)system.
The granite blasting system at PT Aditya Buana Inter consisted of 5 blasting and with 386holes of explosive holes obtained, the total institutional volume was 199.
996 m3 (BCM) and the totalvolume of blasting was 13001, 7 m3 (BCM) of the target company of 16,000 m3 (BCM) / month.
Drillingand blasting activities to produce blasting volumes of course there are factors that influence theseactivities.
Factors that influence drilling and blasting activities affect the costs incurred and the volumeof blasting results produced, the factors that influence these activities include: weather, frontconditions, equipment damage, less optimal blasting geometry measurements.
The activity is certainlynot inseparable from the costs that must be incurred by PT Aditya Buana Inter both fixed costs andvariable costs.
The total costs incurred by PT Aditya Buana Inter on September 2, 2018 to October4, 2018 are Rp 352,677,200.
00 which includes fixed costs of Rp 170,616,020.
00 and variable costs(variable costs) of Rp 182,061,000.
00, and variable costs per m3 the volume of blasting yield is Rp14,003 /m3.
Break even points obtained from calculations for units are 812,468 m3 and in rupiah Rp181,992,901.
00.
PT Aditya Buana Inter income from the sale of split stone is Rp 472,846,080.
00obtained from the sales volume of 2110.
92 m3 with a selling price of Rp 224,000 /m3, the profit (L)obtained is Rp 90,610,140.
00.
Calculation of Break Even Point analysis can determine the minimumamount of volume of rock from the blasting that will be produced and to find out the condition of thecompany not making a profit and also not losing.
Related Results
DAMPAK TEKNOLOGI TERHADAP PROSES BELAJAR MENGAJAR
DAMPAK TEKNOLOGI TERHADAP PROSES BELAJAR MENGAJAR
DAFTAR PUSTAKAAditama, M. H. R., & Selfiardy, S. (2022). Kehidupan Mahasiswa Kuliah Sambil Bekerja di Masa Pandemi Covid-19. Kidspedia: Jurnal Pendidikan Anak Usia Dini, 3(...
Evaluasi Hasil Persilangan Ayam Lurik, Ayam Merawang dan Ayam Komering 267 Evaluasi Hasil Persilangan Ayam Lurik, Ayam Merawang dan Ayam Komering
Evaluasi Hasil Persilangan Ayam Lurik, Ayam Merawang dan Ayam Komering 267 Evaluasi Hasil Persilangan Ayam Lurik, Ayam Merawang dan Ayam Komering
This research was aimed to study the breeding result between Lurik chicken versus Merawang and Komering chicken and between Merawang and Komering chicken.. Experimental v...
Analisis Geometri Peledakan terhadap Fragmentasi Batu Gamping di Quarry D Blok 2 Pt Indocement Tunggal Prakarsa, Tbk. Kecamatan Gunung Putri, Kabupaten Bogor Provinsi Jawa Barat
Analisis Geometri Peledakan terhadap Fragmentasi Batu Gamping di Quarry D Blok 2 Pt Indocement Tunggal Prakarsa, Tbk. Kecamatan Gunung Putri, Kabupaten Bogor Provinsi Jawa Barat
Abstract. PT Indocement Tunggal Prakarsa Tbk is a company engaged in limestone and claystone mining using a quarry mining system. In its blasting activities, the company sets a fra...
KEANEKARAGAMAN JENIS KUPU-KUPU DIKAWASAN HUTAN BATU TIKAR KECAMATAN LUWUK KABUPATEN BANGGAI
KEANEKARAGAMAN JENIS KUPU-KUPU DIKAWASAN HUTAN BATU TIKAR KECAMATAN LUWUK KABUPATEN BANGGAI
ABSTRAKNILLA ERNI NURRACHMAH NINGSIH. 2022. Keanekaragaman Jenis Kupu-kupu di Kawasan Hutan Batu Tikar Kecamatan Luwuk Kabupaten Banggai. (Dibimbing oleh Sulasmi Anggo dan Wahyudin...
OPTIMASI BIAYA PELEDAKAN PADA PEMBONGKARAN LIMESTONE DI QUARRY BATUGAMPING
OPTIMASI BIAYA PELEDAKAN PADA PEMBONGKARAN LIMESTONE DI QUARRY BATUGAMPING
Kegiatan penambangan menggunakan, metode quarry dan proses pembongkaran material limestone menggunakan metode peledakan, agar memenuhi target produksi dan memperlancar proses pemua...
BATU PUN: ARKEOLOGI DAN MITOS DAYAK LUNDAYEH DI LEMBAH KURID DI KRAYAN, NUNUKAN
BATU PUN: ARKEOLOGI DAN MITOS DAYAK LUNDAYEH DI LEMBAH KURID DI KRAYAN, NUNUKAN
Tradisi megalitik di kawasan Krayan telah berkembang seiring dengan perubahan zaman. Salah satunya adalah Batu Pun yang berada di lembah Kurid, di Nunukan. Tampaknya masyarakat Lun...
Studi Penentuan Getaran Peledakan Menggunakan Maximum Instantaneous Charge Per Delay di PT Lotus Sg Lestari
Studi Penentuan Getaran Peledakan Menggunakan Maximum Instantaneous Charge Per Delay di PT Lotus Sg Lestari
Penentuan PPV prediksi dalam kegiatan peledakan menggunakan jumlah bahan peledak maksimum per peledakan yang menyebabkan jumlah data prediksi PPV yang dihasilkan tidak cukup untuk ...
CERITA BATU BAGGA DAN BATU BALAI: SEBUAH KAJIAN STRUKTURAL SASTRA BANDINGAN (A Comparative Study: The Folktale of Batu Bagga and Batu Balai)
CERITA BATU BAGGA DAN BATU BALAI: SEBUAH KAJIAN STRUKTURAL SASTRA BANDINGAN (A Comparative Study: The Folktale of Batu Bagga and Batu Balai)
Beberapa contoh cerita rakyat yang terkenal di Indonesia adalah legenda tentang anak yang durhaka kepada orang tuanya, seperti Malin Kundang dari Minangkabau, Gempu Awang dari Bang...