Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

The Optimization of Slant-Well Drilling in the Lindbergh Field

View through CrossRef
Summary Since 1985, Dome Petroleum Ltd. has developed slant-well drilling in the Lindbergh heavy-oil field in east-central Alberta. The oil-bearing sands occur in the lower Mannville formations of the Cretaceous period. To date, four pads, each consisting of 15 or 16 wells, have been completed. The experience gained in completing these projects has allowed us to make optimum use of slant-well technology in multiwell pad applications. The heavy-oil reservoirs in the Lindbergh field contain oil with a gravity of 0.98 g/cm3 [12.5° API]. The reservoir is at a vertical depth of 600 m [1,970 ft]. The wells are drilled on 4-ha [10-acre] spacing and placed on primary production for 2 years, after which steam stimulation is used for EOR. This primary production of cold oil has significant economic impact on the development of this field because capital recovery is achieved for drilling and completion before the massive investment into steam generation and distribution facilities. Maximizing this primary recovery requires that low-dogleg-severity (DLS), "straight" holes be drilled. The Lindbergh area is characterized by high agricultural land use. With slant-well technology, the required spacing unit is achieved with minimum surface land usage, optimum hole quality, and minimum environmental impact. In this application, slant-well drilling provides an attractive alternative to conventional directional multiwell pad projects. In the initial stages of slant-well development, drilling times of 5.5 days/well and costs** of $315/m [$81/ft] were experienced. Through an optimization process involving pad design, drilling equipment, casing design, bits and hydraulics, and directional/survey assemblies, significant savings in drilling time and cost were realized. To date, 71 slant wells have been drilled. In the latest project, drilling time averaged approximately 2 days/well and costs were reduced to $177/m [$45/ft]. These savings were achieved with an improvement in directional control and overall hole quality. This paper describes the optimization process and the techniques used to realize these savings.
Society of Petroleum Engineers (SPE)
Title: The Optimization of Slant-Well Drilling in the Lindbergh Field
Description:
Summary Since 1985, Dome Petroleum Ltd.
has developed slant-well drilling in the Lindbergh heavy-oil field in east-central Alberta.
The oil-bearing sands occur in the lower Mannville formations of the Cretaceous period.
To date, four pads, each consisting of 15 or 16 wells, have been completed.
The experience gained in completing these projects has allowed us to make optimum use of slant-well technology in multiwell pad applications.
The heavy-oil reservoirs in the Lindbergh field contain oil with a gravity of 0.
98 g/cm3 [12.
5° API].
The reservoir is at a vertical depth of 600 m [1,970 ft].
The wells are drilled on 4-ha [10-acre] spacing and placed on primary production for 2 years, after which steam stimulation is used for EOR.
This primary production of cold oil has significant economic impact on the development of this field because capital recovery is achieved for drilling and completion before the massive investment into steam generation and distribution facilities.
Maximizing this primary recovery requires that low-dogleg-severity (DLS), "straight" holes be drilled.
The Lindbergh area is characterized by high agricultural land use.
With slant-well technology, the required spacing unit is achieved with minimum surface land usage, optimum hole quality, and minimum environmental impact.
In this application, slant-well drilling provides an attractive alternative to conventional directional multiwell pad projects.
In the initial stages of slant-well development, drilling times of 5.
5 days/well and costs** of $315/m [$81/ft] were experienced.
Through an optimization process involving pad design, drilling equipment, casing design, bits and hydraulics, and directional/survey assemblies, significant savings in drilling time and cost were realized.
To date, 71 slant wells have been drilled.
In the latest project, drilling time averaged approximately 2 days/well and costs were reduced to $177/m [$45/ft].
These savings were achieved with an improvement in directional control and overall hole quality.
This paper describes the optimization process and the techniques used to realize these savings.

Related Results

Drilling Variables At Technical Limit Of Drilling Rate
Drilling Variables At Technical Limit Of Drilling Rate
Abstract Recorded drilling times may show significant variations from well to well even for the same total depth in the same field. Apart from the formation chara...
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Drilling in deeper formations and in high pressure and high temperature (HPHT) environments is a new frontier for the oil industry. Fifty years ago, no one would have imagined dril...
Pointwise semi-slant Riemannian maps into almost Hermitian manifolds and Casorati inequalities
Pointwise semi-slant Riemannian maps into almost Hermitian manifolds and Casorati inequalities
UDC 514 As a natural generalization of slant submanifolds [B.-Y. Chen, Bull. Austral. Math. Soc., 41,  No. 1, 135 (1990)], slant submersions [B. Şahin, Bull. Math. Soc. Sci. Math....
Slant Hole Drilling For Natural Gas
Slant Hole Drilling For Natural Gas
Abstract This paper discusses the slant hole project undertaken by Ocelot Industries Ltd. in the Bantry Field located in Southeastern Alberta. S...
Planning Drilling Fluid Programs in Southeast Asia
Planning Drilling Fluid Programs in Southeast Asia
Planning the drilling fluids program is one of the most important steps in Planning the drilling fluids program is one of the most important steps in preparation for the drilling o...
Casing Drilling with Retrievable Drilling Assemblies
Casing Drilling with Retrievable Drilling Assemblies
Abstract Retrievable Casing Drilling* tools have been used to drill more than 600,000 ft of hole in over 120 wells encompassing six casing sizes ranging from 4-1/...
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Abstract Pit less Drilling technology is a technology that eliminates the requirement for earthen pits or sumps to capture waste fluid. In this paper we will examine...
Numerical Modelling of Cuttings Transport With Foam in Inclined Wells
Numerical Modelling of Cuttings Transport With Foam in Inclined Wells
Abstract In this study, a 1-D transient state mechanistic model of cuttings transport with foam in inclined wells has been developed. The model is solved numerica...

Back to Top