Javascript must be enabled to continue!
Effectiveness of Simulations on Well Control During HPHT Well Drilling
View through CrossRef
Abstract
The conventional methods of oil and gas wells drilling has been to keep drilling mud in the active mud pit at ambient temperature and pressure to drill oil and gas wells; despite the effect of temperature and pressure on mud properties at bottom hole condition. Although, this practice has proved to be adequate in shallow and conventional wells owing to relatively small difference in temperature between surface and bottom hole and the existence of sufficient margin between pore and fracture pressures. Conversely, lots of changes occur on mud properties especially in drilling High Pressure High Temperature (HPHT) wells leading to increased incidences and serious well control situations.
One of the key characteristics of HPHT wells is the existence of small margin between pore pressure and fracture pressure as well as elevated bottom hole temperature. This property of the well (HPHT) presents series of challenges to both drilling fluid management at bottom hole condition and well control incidents. Literature survey puts well control incident rate for conventional wells at 4 to 5% whereas in non-conventional wells such as the HPHT wells, an alarming rate of 100 to 200% or even greater has been recorded. This represents at least one well control incident in every 20 to 25 wells drilled for conventional wells and at least one to two well control incidents for every non-conventional well like HPHT.
In this study, tier I HPHT well was examined to ascertain the severity of kick intensity and kick volume on well control using Drill Bench. Simulations were performed on 6.5bbls and 1bbls kick taken in 12¼” hole prior to reaching the next casing seat at 13780ft-ss TVD. The research presents results of delay in shut-in the well, kick volume and volume development during well control as well as gas migration. In addition, the study examined implication of well control methods and drilling fluid type on bottom hole pressures and timing to handle well control incident during HPHT well drilling.
Title: Effectiveness of Simulations on Well Control During HPHT Well Drilling
Description:
Abstract
The conventional methods of oil and gas wells drilling has been to keep drilling mud in the active mud pit at ambient temperature and pressure to drill oil and gas wells; despite the effect of temperature and pressure on mud properties at bottom hole condition.
Although, this practice has proved to be adequate in shallow and conventional wells owing to relatively small difference in temperature between surface and bottom hole and the existence of sufficient margin between pore and fracture pressures.
Conversely, lots of changes occur on mud properties especially in drilling High Pressure High Temperature (HPHT) wells leading to increased incidences and serious well control situations.
One of the key characteristics of HPHT wells is the existence of small margin between pore pressure and fracture pressure as well as elevated bottom hole temperature.
This property of the well (HPHT) presents series of challenges to both drilling fluid management at bottom hole condition and well control incidents.
Literature survey puts well control incident rate for conventional wells at 4 to 5% whereas in non-conventional wells such as the HPHT wells, an alarming rate of 100 to 200% or even greater has been recorded.
This represents at least one well control incident in every 20 to 25 wells drilled for conventional wells and at least one to two well control incidents for every non-conventional well like HPHT.
In this study, tier I HPHT well was examined to ascertain the severity of kick intensity and kick volume on well control using Drill Bench.
Simulations were performed on 6.
5bbls and 1bbls kick taken in 12¼” hole prior to reaching the next casing seat at 13780ft-ss TVD.
The research presents results of delay in shut-in the well, kick volume and volume development during well control as well as gas migration.
In addition, the study examined implication of well control methods and drilling fluid type on bottom hole pressures and timing to handle well control incident during HPHT well drilling.
Related Results
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Drilling in deeper formations and in high pressure and high temperature (HPHT) environments is a new frontier for the oil industry. Fifty years ago, no one would have imagined dril...
The Newly Published BSEE Guidance Documents for the Approval of HPHT Equipment, Wells, and Projects in the Gulf of Mexico
The Newly Published BSEE Guidance Documents for the Approval of HPHT Equipment, Wells, and Projects in the Gulf of Mexico
Abstract
The Bureau of Safety and Environmental Enforcement (BSEE) first published High Pressure/High Temperature (HPHT) regulations at 30 CFR 250.807 in 2010. Addit...
Investigating the Effect of High Pressures and Temperatures on Corrosion Inhibition for Water-Based Muds
Investigating the Effect of High Pressures and Temperatures on Corrosion Inhibition for Water-Based Muds
Corrosion is defined as gradual degradation of metal caused by a chemical or electrochemical reaction with its environment. In oil and gas sector, components can corrode at any sta...
Exploring technological and operational challenges in high-pressure: High-temperature drilling techniques
Exploring technological and operational challenges in high-pressure: High-temperature drilling techniques
This comprehensive review explores the complex landscape of HPHT drilling, examining the underlying principles, innovative technologies, and operational strategies used to overcome...
Drilling Variables At Technical Limit Of Drilling Rate
Drilling Variables At Technical Limit Of Drilling Rate
Abstract
Recorded drilling times may show significant variations from well to well even for the same total depth in the same field. Apart from the formation chara...
Planning Drilling Fluid Programs in Southeast Asia
Planning Drilling Fluid Programs in Southeast Asia
Planning the drilling fluids program is one of the most important steps in Planning the drilling fluids program is one of the most important steps in preparation for the drilling o...
Casing Drilling with Retrievable Drilling Assemblies
Casing Drilling with Retrievable Drilling Assemblies
Abstract
Retrievable Casing Drilling* tools have been used to drill more than 600,000 ft of hole in over 120 wells encompassing six casing sizes ranging from 4-1/...
Numerical Modelling of Cuttings Transport With Foam in Inclined Wells
Numerical Modelling of Cuttings Transport With Foam in Inclined Wells
Abstract
In this study, a 1-D transient state mechanistic model of cuttings transport with foam in inclined wells has been developed. The model is solved numerica...

