Failure and Repair of Deck Closure Pour on Interstate 81
View through CrossRef
On April 6, 2009, a 3-ft × 3-ft section of a closure pour in a reinforced concrete deck on Interstate 81 punched through. The deck had been cast in 1992 during a deck replacement project in which each lane and shoulder of the deck was replaced while traffic used an adjacent lane. The center closure pour connected the two new deck placements. An examination of the failed section revealed that a total of 18 #5 rebars were sheared to create the hole in the deck. The epoxy-coated rebars had sustained section loss because of corrosion caused by water and chlorides leaking through the construction joint and a transverse crack. Repair consisted of removing an 8-ft wide section of the deck that spanned between the steel beams along each side of the closure pour over the entire length of the bridge, forming the opening, placing corrosion-resistant reinforcement (ASTM A1035) that spanned between the beams, and placing expansive bridge deck concrete prepared with Type K cement. Four slabs removed from the closure pour area were delivered to the Structures and Materials Research Facility of Virginia Polytechnic Institute and State University for evaluation. Evaluation methods included chloride contents, concrete resistivities, corrosion potentials, and currents and the electrical indication of the resistance of concrete to chloride penetration. Results are presented from the evaluation of the closure pour failure and the deck repair.
Title: Failure and Repair of Deck Closure Pour on Interstate 81
Description:
On April 6, 2009, a 3-ft × 3-ft section of a closure pour in a reinforced concrete deck on Interstate 81 punched through.
The deck had been cast in 1992 during a deck replacement project in which each lane and shoulder of the deck was replaced while traffic used an adjacent lane.
The center closure pour connected the two new deck placements.
An examination of the failed section revealed that a total of 18 #5 rebars were sheared to create the hole in the deck.
The epoxy-coated rebars had sustained section loss because of corrosion caused by water and chlorides leaking through the construction joint and a transverse crack.
Repair consisted of removing an 8-ft wide section of the deck that spanned between the steel beams along each side of the closure pour over the entire length of the bridge, forming the opening, placing corrosion-resistant reinforcement (ASTM A1035) that spanned between the beams, and placing expansive bridge deck concrete prepared with Type K cement.
Four slabs removed from the closure pour area were delivered to the Structures and Materials Research Facility of Virginia Polytechnic Institute and State University for evaluation.
Evaluation methods included chloride contents, concrete resistivities, corrosion potentials, and currents and the electrical indication of the resistance of concrete to chloride penetration.
Results are presented from the evaluation of the closure pour failure and the deck repair.
Related Results
REGULAR ARTICLES
REGULAR ARTICLES
L. Cowen and
C. J.
Schwarz
657Les Radio‐tags, en raison de leur détectabilitéélevée, ...
De la poésie à la peinture
De la poésie à la peinture
La poésie et la peinture étaient toujours deux différentes expressions de l’esprit et de l’âme de l’homme qui sont dédiées à présenter absolument chacune à sa façon ce qui était di...
00.06: Advances and development needs in the structural design of steel box girders for major bridges
00.06: Advances and development needs in the structural design of steel box girders for major bridges
ABSTRACTMajor cable‐supported bridges with a span exceeding 600m would not normally be feasible without a steel box girder to carry the traffic load. These box girders generally co...
Laparoscopic Incisional Hernia Mesh Repair With And Without Defect Closure
Laparoscopic Incisional Hernia Mesh Repair With And Without Defect Closure
Objectives: As a systematic review, the present paper is designed to compare laparoscopic incisional hernia mesh repair with or without mesh defect after evaluating the rates of re...
AN EXPERIENCE COMPARING INGUINAL HERNIA MESH REPAIR VS DARN REPAIR
AN EXPERIENCE COMPARING INGUINAL HERNIA MESH REPAIR VS DARN REPAIR
Background: Several methods for fixing inguinal hernias have been documented. Anterior or posterior approaches,open or laparoscopic procedures, may be used for hernia repair. While...
Abstract 3493: Comprehensive analysis of the DNA repair enzyme signature in tumor and blood cells from head and neck cancer patients and correlation with clinical data from a 18-months follow-up study
Abstract 3493: Comprehensive analysis of the DNA repair enzyme signature in tumor and blood cells from head and neck cancer patients and correlation with clinical data from a 18-months follow-up study
Abstract
Head and neck squamous cell carcinoma (HNSCC) is the sixth leading cancer worldwide. It is often associated with a history of smoking/alcohol consumption or...
The Jacking System and Simulator for Mating the Hutton TLP
The Jacking System and Simulator for Mating the Hutton TLP
ABSTRACT
The Hutton TLP Deck/ Hull mating and weldout operation required the use of a sophisticated and unique hydraulic jacking system. The system was designed t...
Anteo : the Float-over giant
Anteo : the Float-over giant
Abstract
Anteo is a "giant" hydraulic system providing one of the most reliable and cost-effective solution to the market demand of Integrated Deck installation b...