Failure and Repair of Deck Closure Pour on Interstate 81

View through CrossRef
On April 6, 2009, a 3-ft × 3-ft section of a closure pour in a reinforced concrete deck on Interstate 81 punched through. The deck had been cast in 1992 during a deck replacement project in which each lane and shoulder of the deck was replaced while traffic used an adjacent lane. The center closure pour connected the two new deck placements. An examination of the failed section revealed that a total of 18 #5 rebars were sheared to create the hole in the deck. The epoxy-coated rebars had sustained section loss because of corrosion caused by water and chlorides leaking through the construction joint and a transverse crack. Repair consisted of removing an 8-ft wide section of the deck that spanned between the steel beams along each side of the closure pour over the entire length of the bridge, forming the opening, placing corrosion-resistant reinforcement (ASTM A1035) that spanned between the beams, and placing expansive bridge deck concrete prepared with Type K cement. Four slabs removed from the closure pour area were delivered to the Structures and Materials Research Facility of Virginia Polytechnic Institute and State University for evaluation. Evaluation methods included chloride contents, concrete resistivities, corrosion potentials, and currents and the electrical indication of the resistance of concrete to chloride penetration. Results are presented from the evaluation of the closure pour failure and the deck repair.
Title: Failure and Repair of Deck Closure Pour on Interstate 81
Description:
On April 6, 2009, a 3-ft × 3-ft section of a closure pour in a reinforced concrete deck on Interstate 81 punched through.
The deck had been cast in 1992 during a deck replacement project in which each lane and shoulder of the deck was replaced while traffic used an adjacent lane.
The center closure pour connected the two new deck placements.
An examination of the failed section revealed that a total of 18 #5 rebars were sheared to create the hole in the deck.
The epoxy-coated rebars had sustained section loss because of corrosion caused by water and chlorides leaking through the construction joint and a transverse crack.
Repair consisted of removing an 8-ft wide section of the deck that spanned between the steel beams along each side of the closure pour over the entire length of the bridge, forming the opening, placing corrosion-resistant reinforcement (ASTM A1035) that spanned between the beams, and placing expansive bridge deck concrete prepared with Type K cement.
Four slabs removed from the closure pour area were delivered to the Structures and Materials Research Facility of Virginia Polytechnic Institute and State University for evaluation.
Evaluation methods included chloride contents, concrete resistivities, corrosion potentials, and currents and the electrical indication of the resistance of concrete to chloride penetration.
Results are presented from the evaluation of the closure pour failure and the deck repair.

Related Results

REGULAR ARTICLES
REGULAR ARTICLES
L. Cowen and C. J. Schwarz       657Les Radio‐tags, en raison de leur détectabilitéélevée, ...
Snorre TLP Topside Design
Snorre TLP Topside Design
ABSTRACT This paper gives a brief description of the topside facilities and integrated deck structure for the Snorre TLP which will operate on Block 34/7 in the N...
Structural Aspects Of Snorre Mating
Structural Aspects Of Snorre Mating
ABSTRACT The deck and the hull of the Snorre TLP were successfully connected South of Stord on the Norwegian westcoast in September 1991. The 28.000 tonnes deck w...
De la poésie à la peinture
De la poésie à la peinture
La poésie et la peinture étaient toujours deux différentes expressions de l’esprit et de l’âme de l’homme qui sont dédiées à présenter absolument chacune à sa façon ce qui était di...
[RETRACTED] Diaetoxil Avis :Diaetoxil Kapseln Avis :Detoxil Avis v1
[RETRACTED] Diaetoxil Avis :Diaetoxil Kapseln Avis :Detoxil Avis v1
[RETRACTED]Must Visit : https://ipsnews.net/business/2022/07/01/diaetoxil-avis-france-gelules-diaetoxil-erfahrungen-bezugsquellen-entgiftung-avis/ https://ipsnews.net/business/2022...
[RETRACTED] Diaetoxil Avis :Diaetoxil Kapseln Avis :Detoxil Avis :Detoxil En Pharmacie :Diaetoxil 600mg! v1
[RETRACTED] Diaetoxil Avis :Diaetoxil Kapseln Avis :Detoxil Avis :Detoxil En Pharmacie :Diaetoxil 600mg! v1
[RETRACTED]Must Visit : https://www.facebook.com/DiaetoxilAvis/ https://ipsnews.net/business/2022/07/01/diaetoxil-avis-france-gelules-diaetoxil-erfahrungen-bezugsquellen-entgiftung...
[RETRACTED] Diaetoxil Avis Fr: Acheter {Diaetoxil Avis France} & Utiliser Diaetoxyl Avis Ou Detoxil Avis! v1
[RETRACTED] Diaetoxil Avis Fr: Acheter {Diaetoxil Avis France} & Utiliser Diaetoxyl Avis Ou Detoxil Avis! v1
[RETRACTED] REGARDEZ NOTRE VIDÉO OFFICIELLE AVANT D'ACHETER Diaetoxil Avis France : Le complément alimentaire révolutionnaire Diaetoxil Gélules, dont l’efficacité a été scient...

Back to Top