Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Improving Artificial Lift Design Through Dynamic Simulation

View through CrossRef
Abstract In a low commodity price environment, the quickest and most cost efficient way to increase production is by optimizing the existing well stock. The objective of this paper is to describe the successful use of transient flow and dynamic simulation to optimize artificial lift systems in tight gas wells. The most economical way to produce natural gas wells for the field in this study (Field A) is on a plunger lift system. However, optimal plunger lift relies heavily on certain wellbore conditions (e.g. liquid to gas ratio, differential pressure between the sand face and flow line, and annular and fracture volume). Dynamic simulation helped understand the optimal wellbore conditions for maximum plunger performance, optimized plunger lift cycles, and allowed engineers to develop a consistent plunger lift strategy across the field. Improved knowledge of the dynamics of the plunger lift system resulted in a few million dollars in cost savings by refining the selection criteria for candidate wells and reducing risks in well intervention execution. Dynamic simulation was also utilized for rod pump optimization for a 40 well rod pump pilot program. Preliminary results of the pilot program suggested that the initial rod pump design performed below expectations. The pilot well produced at a low gas rate with a high annulus liquid level. Dynamic simulation was used to test and improve the existing rod pump design and best practices. Understanding the downhole dynamics of the system allowed the engineers to identify a choke in the system resulting in a false-high fluid level reading while simultaneously causing the pump to gas lock. An optimized rod pump design was created from the learnings and the design was executed in the field. As a result, the rod pump was able to fully pump off the annulus volume and the gas production was increased by 50%. This paper discusses the methodology to match actual field data and investigate the downhole dynamics for plunger and rod pump operation using a commercial transient flow application. The learnings and observations from this study allowed engineers to answer key technical questions, to reduce project execution risks, and to increase gas production. In the end, dynamic simulation provided a quick way to improve existing designs, test new ideas, and refine operational procedures without the time and cost of field implementation.
Title: Improving Artificial Lift Design Through Dynamic Simulation
Description:
Abstract In a low commodity price environment, the quickest and most cost efficient way to increase production is by optimizing the existing well stock.
The objective of this paper is to describe the successful use of transient flow and dynamic simulation to optimize artificial lift systems in tight gas wells.
The most economical way to produce natural gas wells for the field in this study (Field A) is on a plunger lift system.
However, optimal plunger lift relies heavily on certain wellbore conditions (e.
g.
liquid to gas ratio, differential pressure between the sand face and flow line, and annular and fracture volume).
Dynamic simulation helped understand the optimal wellbore conditions for maximum plunger performance, optimized plunger lift cycles, and allowed engineers to develop a consistent plunger lift strategy across the field.
Improved knowledge of the dynamics of the plunger lift system resulted in a few million dollars in cost savings by refining the selection criteria for candidate wells and reducing risks in well intervention execution.
Dynamic simulation was also utilized for rod pump optimization for a 40 well rod pump pilot program.
Preliminary results of the pilot program suggested that the initial rod pump design performed below expectations.
The pilot well produced at a low gas rate with a high annulus liquid level.
Dynamic simulation was used to test and improve the existing rod pump design and best practices.
Understanding the downhole dynamics of the system allowed the engineers to identify a choke in the system resulting in a false-high fluid level reading while simultaneously causing the pump to gas lock.
An optimized rod pump design was created from the learnings and the design was executed in the field.
As a result, the rod pump was able to fully pump off the annulus volume and the gas production was increased by 50%.
This paper discusses the methodology to match actual field data and investigate the downhole dynamics for plunger and rod pump operation using a commercial transient flow application.
The learnings and observations from this study allowed engineers to answer key technical questions, to reduce project execution risks, and to increase gas production.
In the end, dynamic simulation provided a quick way to improve existing designs, test new ideas, and refine operational procedures without the time and cost of field implementation.

Related Results

Fundamental study on rope vibration suppression by middle transfer floor using risk information
Fundamental study on rope vibration suppression by middle transfer floor using risk information
Lifts are essential for means of vertical transportation. Recently, the lifts installed in the high-rise buildings are long travel, thus the lift ropes are becoming longer. The nat...
Pig Lift: A New Artificial Lift Method
Pig Lift: A New Artificial Lift Method
Abstract Artificial lift of oil wells is a fairly broad subject. There are many different methods available but in a few cases none of them turns out to be a fit ...
Artificial Lift Selection Strategy to Maximize Unconventional Oil and Gas Assets Value
Artificial Lift Selection Strategy to Maximize Unconventional Oil and Gas Assets Value
Abstract The challenges of producing and lifting unconventional oil and gas economically is no doubt the most daunting phase of unconventional oil and gas developmen...
Gas Lift - Past & Future
Gas Lift - Past & Future
Abstract This paper will describe the evolution of gas lift systems over the past few decades, making parallels with other artificial lift technologies (ESP, SRP, an...
The Future of Plunger Lift Control Using Artificial Intelligence
The Future of Plunger Lift Control Using Artificial Intelligence
Abstract Plunger lift is a form of artificial lift popular due to its low installation and operating costs. Historically plunger lift was reserved for low producing ...
A Conceptual Study of Dual Lift Design in Ultradeep Wells
A Conceptual Study of Dual Lift Design in Ultradeep Wells
Abstract For many years rod pumping has been a desirable artificial lift method for on-shore oil wells. Today, in addition to rod pumps, other artificial lift method...
Design
Design
Conventional definitions of design rarely capture its reach into our everyday lives. The Design Council, for example, estimates that more than 2.5 million people use design-related...
High Pressure Gas-Lift: Is Industry Missing a Potentially Huge Application to Horizontal Wells?
High Pressure Gas-Lift: Is Industry Missing a Potentially Huge Application to Horizontal Wells?
AbstractTraditional gas-lift technology blossomed between 1929 and 1945, with about 25000 patents being issued during this time (Wikipedia 2017). Minimal innovation other than impr...

Back to Top