Javascript must be enabled to continue!
IWE and IWL
View through CrossRef
Abstract
This chapter addresses ASME Code Section XI, Subsections IWE and IWL, for nuclear power plant containments. Subsection IWE provides requirements for preservice and inservice examination/inspection, repair/replacement (R/R) activities, and testing of Class MC (metal containment) pressure-retaining components and their integral attachments and R/R activities. It also provides requirements for testing of Class CC (concrete containment) pressure-retaining components and their integral attachments for boiling water reactors (BWRs) and pressurized water reactors (PWRs). Similarly, Subsection IWL provides requirements for preservice and inservice examination/inspection, R/R activities, and testing of the reinforced concrete and post-tensioning systems of Class CC components for BWRs and PWRs. Together with Subsection IWA, a comprehensive basis is provided for ensuring the continued structural and leak-tight integrity of containments in nuclear power plants. The chapter includes a brief history of the development of ASME Code requirements, the latest information on the U.S. Nuclear Regulatory Commission regulatory review and incorporation of recent ASME Code Editions and Addenda, and current listings of U.S. ‘construction-complete’ commercial nuclear power plants and their containment types and operating status. A summary of recent nuclear industry developments in advanced plant designs and a discussion of the as-yet-unrealized ‘U.S. nuclear renaissance’ are also presented, along with information on the global demand for energy and the current status of commercial nuclear power around the world. Lastly, the current Subsection IWE and IWL Commentaries, as approved and maintained by the ASME Working Group on Containment, are included.
Title: IWE and IWL
Description:
Abstract
This chapter addresses ASME Code Section XI, Subsections IWE and IWL, for nuclear power plant containments.
Subsection IWE provides requirements for preservice and inservice examination/inspection, repair/replacement (R/R) activities, and testing of Class MC (metal containment) pressure-retaining components and their integral attachments and R/R activities.
It also provides requirements for testing of Class CC (concrete containment) pressure-retaining components and their integral attachments for boiling water reactors (BWRs) and pressurized water reactors (PWRs).
Similarly, Subsection IWL provides requirements for preservice and inservice examination/inspection, R/R activities, and testing of the reinforced concrete and post-tensioning systems of Class CC components for BWRs and PWRs.
Together with Subsection IWA, a comprehensive basis is provided for ensuring the continued structural and leak-tight integrity of containments in nuclear power plants.
The chapter includes a brief history of the development of ASME Code requirements, the latest information on the U.
S.
Nuclear Regulatory Commission regulatory review and incorporation of recent ASME Code Editions and Addenda, and current listings of U.
S.
‘construction-complete’ commercial nuclear power plants and their containment types and operating status.
A summary of recent nuclear industry developments in advanced plant designs and a discussion of the as-yet-unrealized ‘U.
S.
nuclear renaissance’ are also presented, along with information on the global demand for energy and the current status of commercial nuclear power around the world.
Lastly, the current Subsection IWE and IWL Commentaries, as approved and maintained by the ASME Working Group on Containment, are included.
Related Results
Inclusive working life and value conflict in Norway
Inclusive working life and value conflict in Norway
PurposeThis paper aims to offer an analysis of the conflicting values behind Norway's much celebrated inclusive working life (IWL) programme, which aims to reduce sickness absentee...
Open Science in Africa – Challenges, Opportunities and Perspectives
Open Science in Africa – Challenges, Opportunities and Perspectives
Open Science is becoming increasingly popular globally and provides unprecedented opportunities for scientists in Africa, South East Asia, and Latin America. African scientists fac...
Application of internal wool lipids to hair
Application of internal wool lipids to hair
Purpose: Hair lipids can contribute to physicochemical phenomena such as diffusion, cell cohesion and mechanical strength, although lipids occur at much lower levels (1–6% dry weig...
Islamic work ethic among Arab college students in Israel
Islamic work ethic among Arab college students in Israel
PurposeThe aim of this paper is to investigate the Islamic work ethic (IWE) and individualism among Arab college students in Israel, who represent an ethnic and religious minority ...
Islamic work ethic in Kuwait
Islamic work ethic in Kuwait
PurposeTo investigation the centrality of islamic work ethic (IWE) in the lives of managers in Kuwait and provide a useful insight into the nature of work environment and organizat...
Examining the link between Islamic work ethic and innovation capability
Examining the link between Islamic work ethic and innovation capability
PurposeThe purpose of this paper is to present an in‐depth analysis of the Islamic work ethic (IWE) and its influence on innovation capability in the public sector.Design/methodolo...
National legislative adoption of international wildlife law after treaty ratification
National legislative adoption of international wildlife law after treaty ratification
AbstractSince the 1970s, the world has witnessed a proliferation of international treaties championing the protection of wildlife. The effectiveness of those treaties, which togeth...
Application of a monitoring and evaluation method in irrigation water efficiency*
Application of a monitoring and evaluation method in irrigation water efficiency*
AbstractWater‐saving irrigation is of high priority in China for alleviation of the water resource supply–demand contradiction. Consequently, the objectives of irrigation water eff...

