Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Productivity Improvement of An Assembly Line using MOST and Heuristic

View through CrossRef
In present global scenario where time and cost have become synonymous with one another, it is important improve the overall performance of the industry. Heavy industries such as automobile industries invest a lot of time and money in establishing manufacturing facilities which demands effective utilization of resources to save time and money. This research is an attempt in an assembly line to analyze and expose the effect of sequencing based on the takt time and its impact over the performance of the line. Initial study involves monitoring and standardization of process time for all operations using Maynard Operation Sequencing Technique. Work is further extended to the concept of sequencing and simulation. Calculated process time are used to sequence the operations based on standard Priority Dispatching Rules such as Longest Processing Time, Shortest Processing Time, Potential Score Method, Followers Based Ranking and a custom developed model based on takt time. Discrete Event Simulation of the assembly line was run for all these sequences and it was found that the model developed based on takt time fetched the best results. The model also showed the maximum utilization, line efficiency among all models and had a much better smoothness index than other models.
Title: Productivity Improvement of An Assembly Line using MOST and Heuristic
Description:
In present global scenario where time and cost have become synonymous with one another, it is important improve the overall performance of the industry.
Heavy industries such as automobile industries invest a lot of time and money in establishing manufacturing facilities which demands effective utilization of resources to save time and money.
This research is an attempt in an assembly line to analyze and expose the effect of sequencing based on the takt time and its impact over the performance of the line.
Initial study involves monitoring and standardization of process time for all operations using Maynard Operation Sequencing Technique.
Work is further extended to the concept of sequencing and simulation.
Calculated process time are used to sequence the operations based on standard Priority Dispatching Rules such as Longest Processing Time, Shortest Processing Time, Potential Score Method, Followers Based Ranking and a custom developed model based on takt time.
Discrete Event Simulation of the assembly line was run for all these sequences and it was found that the model developed based on takt time fetched the best results.
The model also showed the maximum utilization, line efficiency among all models and had a much better smoothness index than other models.

Related Results

Development and Applications of the SCARA Robot
Development and Applications of the SCARA Robot
In the 1980s, when the author worked for Seiko Epson Corporation as a wristwatch production engineer, consumer needs had become so diversified that wristwatches had to be assembled...
Application of innovative factors to increase labor productivity
Application of innovative factors to increase labor productivity
 The relevance of the research topic lies in the fact that increasing labor productivity is an urgent task for all levels of the economy. Labor productivity is the basis of long-te...
Soviet Shipbuilding: Productivity improvement Efforts
Soviet Shipbuilding: Productivity improvement Efforts
Constant demand for new naval and commercial vessels has created special conditions for the Government-owned Soviet shipbuilding industry, which practically has not been affected b...
Loop assembly v2
Loop assembly v2
This protocol is used for performing Type IIS assembly by either BsaI or SapI-mediated restriction/ligation using Loop assembly. Loop assembly comprises8receiver plasmids in odd ...
Loop and uLoop assembly v5
Loop and uLoop assembly v5
This protocol is used for performing Type IIS assembly by either BsaI or SapI-mediated restriction/ligation using Loop assembly with either Loop or uLoop plasmids. Loop assembly ...
Loop assembly protocol v1.0 v1
Loop assembly protocol v1.0 v1
This protocol is used for performing Type IIS assembly by either BsaI or SapI-mediated restriction/ligation using the Loop assembly system. Loop assembly comprises8receiver plasm...
Loop and uLoop assembly v4
Loop and uLoop assembly v4
This protocol is used for performing Type IIS assembly by either BsaI or SapI-mediated restriction/ligation using Loop assembly with either Loop or uLoop plasmids. Loop assembly ...
Loop and uLoop assembly v3
Loop and uLoop assembly v3
This protocol is used for performing Type IIS assembly by either BsaI or SapI-mediated restriction/ligation using Loop assembly with either Loop or uLoop plasmids. Loop assembly ...

Back to Top