Status of the 10-Pattern Steamflood, Kern River Field, California
View through CrossRef
Summary
The 10-pattern steamflood was converted to water injection in Sept. 1975 after 7 years of operation. Recovery is now 59 % of the presteam oil in place (OIP), with 22 % of this oil produced during the waterflood. Poststeam water injection apparently works best in reservoirs with large hot and unaffected zones remaining at the end of steam injection.
Introduction
Finding a way to end a steamflood project has been a problem for many operators. Usually this is done by stopping steam injection at the economic limit on the steam/oil ratio (SOR) and producing the reservoir to its new economic limit without steam assistance. Simulation studies conducted by Chevron U.S.A. Inc. have shown that higher ultimate recovery was possible by injecting water after a steamflood. This subsequent recovery results from heat scavenging (areally and vertically) and pressure maintenance effects. Maintaining reservoir pressure aided well productivity, prevented lateral resaturation of the depleted zone by oil from outside steamdrive areas, and prevented possible subsidence. Project economics also are improved because fuel is not needed to generate steam for the recovery of this additional oil. A successful poststeam water-injection project was reported previously. This project followed an unsuccessful steam injection program. A similar poststeam project, using a mixture of air and water, also has been reported. To our knowledge, no other poststeam waterinjection projects currently exist. Our first application of poststeam water injection was in the 10-pattern steamflood, Section 3 of the Kern River field. Steam injection began in Sept. 1968. The project was converted to cold-water injection in Sept. 1975. A previous papers described this project and its performance through Sept. 1973. Our paper updates the project's performance and status as of Jan. 1, 1981.
Project Description
The changes in well completions, operating practices, surface facilities and reservoir data since the first report are discussed in the following Fig. 1 shows the location and status of all wells in the project.
Well Completions
No temperature observation wells have been added or reworked since the beginning of the steamflood. Two of the 14 observation wells, T5-1 and T5-6, are no longer used because of apparent cement breakdowns. The 10 injection wells were 5 1/2-in. jet-perforated completions without packers. All injectors were completed in the middle of the drive zone, although originally this was not recognized. None of the injection wells have required work since completion. Wellhead injection pressures during the final steamflood period ranged from 150 to 200 psi. All injection wells have been on vacuum since water injection began. Even a change in April 1979 to unfiltered produced water apparently has not hurt injectivity. Thirty-three producers now are included in the project. Well 12-4 was drilled in Jan. 1977 to replace Well 163, which was in poor mechanical condition. Well 12-4 was completed with a 6 5/8-in. liner with 40-mesh slots. Producer 7-7 was redrilled in May 1977 to sidetrack a collapsed liner. It was completed the same way as the previous wells but with 50-mesh slots. All producers in the project have slotted liners opened to other producing intervals.
Slot plugging and lack of control of placement during steam stimulations are the major drawbacks to liner completions.
JPT
P. 2251^
Society of Petroleum Engineers (SPE)
Title: Status of the 10-Pattern Steamflood, Kern River Field, California
Description:
Summary
The 10-pattern steamflood was converted to water injection in Sept.
1975 after 7 years of operation.
Recovery is now 59 % of the presteam oil in place (OIP), with 22 % of this oil produced during the waterflood.
Poststeam water injection apparently works best in reservoirs with large hot and unaffected zones remaining at the end of steam injection.
Introduction
Finding a way to end a steamflood project has been a problem for many operators.
Usually this is done by stopping steam injection at the economic limit on the steam/oil ratio (SOR) and producing the reservoir to its new economic limit without steam assistance.
Simulation studies conducted by Chevron U.
S.
A.
Inc.
have shown that higher ultimate recovery was possible by injecting water after a steamflood.
This subsequent recovery results from heat scavenging (areally and vertically) and pressure maintenance effects.
Maintaining reservoir pressure aided well productivity, prevented lateral resaturation of the depleted zone by oil from outside steamdrive areas, and prevented possible subsidence.
Project economics also are improved because fuel is not needed to generate steam for the recovery of this additional oil.
A successful poststeam water-injection project was reported previously.
This project followed an unsuccessful steam injection program.
A similar poststeam project, using a mixture of air and water, also has been reported.
To our knowledge, no other poststeam waterinjection projects currently exist.
Our first application of poststeam water injection was in the 10-pattern steamflood, Section 3 of the Kern River field.
Steam injection began in Sept.
1968.
The project was converted to cold-water injection in Sept.
1975.
A previous papers described this project and its performance through Sept.
1973.
Our paper updates the project's performance and status as of Jan.
1, 1981.
Project Description
The changes in well completions, operating practices, surface facilities and reservoir data since the first report are discussed in the following Fig.
1 shows the location and status of all wells in the project.
Well Completions
No temperature observation wells have been added or reworked since the beginning of the steamflood.
Two of the 14 observation wells, T5-1 and T5-6, are no longer used because of apparent cement breakdowns.
The 10 injection wells were 5 1/2-in.
jet-perforated completions without packers.
All injectors were completed in the middle of the drive zone, although originally this was not recognized.
None of the injection wells have required work since completion.
Wellhead injection pressures during the final steamflood period ranged from 150 to 200 psi.
All injection wells have been on vacuum since water injection began.
Even a change in April 1979 to unfiltered produced water apparently has not hurt injectivity.
Thirty-three producers now are included in the project.
Well 12-4 was drilled in Jan.
1977 to replace Well 163, which was in poor mechanical condition.
Well 12-4 was completed with a 6 5/8-in.
liner with 40-mesh slots.
Producer 7-7 was redrilled in May 1977 to sidetrack a collapsed liner.
It was completed the same way as the previous wells but with 50-mesh slots.
All producers in the project have slotted liners opened to other producing intervals.
Slot plugging and lack of control of placement during steam stimulations are the major drawbacks to liner completions.
JPT
P.
2251^.
Related Results
The Ten-Pattern Steamflood, Kern River Field, California
The Ten-Pattern Steamflood, Kern River Field, California
The steamflood project at Kern River field consists of 10 inverted seven-spot injection patterns, with 32 producing wells covering 61 acres. Steam injection is confined to a 70-ft ...
Steam Distillation Studies For The Kern River Field
Steam Distillation Studies For The Kern River Field
Abstract
The interactions of heavy oil and injected steam in the mature steamflood at the Kern River Field have been extensively studied to gain insight into the ...
Sweep Efficiency In Steamflooding
Sweep Efficiency In Steamflooding
Abstract
The chief objectives of this investigation were to study, theoretically and experimentally, the sweep efficiency and oil recovery for steam injection int...
Flodfund - Bronzealderdeponeringer fra Gudenåen
Flodfund - Bronzealderdeponeringer fra Gudenåen
River findsBronze Age metalwork from the river GudenåBronze Age metalwork (primarily swords and other weapons) found in European rivers has aroused interest for many years, but lit...
Oil Saturation Log Prediction Using Neural Network in New Steamflood Area
Oil Saturation Log Prediction Using Neural Network in New Steamflood Area
Surveillance is very important in managing a steamflood project. On the current surveillance plan, Temperature and steam ID logs are acquired on observation wells at least every ye...
Evaluation of Steam-Injection Designs for the Duri Steamflood Project
Evaluation of Steam-Injection Designs for the Duri Steamflood Project
Abstract
The Duri Steamflood (DSF) Project is the largest thermal enhanced oil recovery (EOR) project in the world, surpassing in production both Kern River and Belr...
Simulation Of The Saner Ranch Fracture Assisted Steamflood Pilot
Simulation Of The Saner Ranch Fracture Assisted Steamflood Pilot
Abstract
Conventional steamflooding of heavy oils and tars in thin reservoirs generally suffers from excessive heat losses to the over-and-under burden. High rate...
Improved Steamflood Analytical Model
Improved Steamflood Analytical Model
Abstract
The Jones (1981) steamflood model incorporates oil displacement by steam as described by Myhill and Stegemeier, and a three-component capture factor based o...