Design and Construction Challenges of a Roped Insulated Pipeline

View through CrossRef
Abstract Thermally insulated hot buried pipelines pose a unique set of challenges. This paper discusses those challenges and how they were met during design and construction of the 150 km long Husky LLB Direct Pipeline, the longest thermally insulated oil pipeline in Canada. Thermal insulation materials are soft and can be easily damaged during construction and backfilling, and by large restraining forces at bends when the pipeline is operating at high temperatures. The large temperature difference between pipeline installation temperature and maximum operating temperature leads to large axial compressive forces that can cause movement at bends, crush insulation, increase temperatures at ground surface, cause loss of restraint, and in the worst case, lead to upheaval buckling and loss of containment. Special design and construction features to deal with these challenges, including insulation specifications, insulation of pipe bends, pipeline pre-straining, long radius bends, deeper burial, and pipeline roping, were therefore necessary. After pipe has been insulated with polyurethane foam it cannot be bent in standard field bending machines used for uninsulated pipes because the foam is too soft. The induction bends and cold bends that are shop insulated after bending are expensive. The Project minimized the number of these expensive insulated bends by using an engineered ditch bottom profile. This meant that shop bends were only needed to reduce excavation depth at sharp changes in ground surface elevation where the roped profile required excessive grading. Care was therefore necessary in the selection and development of specifications for the insulation system and shop fabricated bends, and to design and construct a ditch profile to minimize forces on the insulation and control upheaval buckling. Close co-ordination with vendors and the construction contractor was crucial for a successful and timely completion.
Title: Design and Construction Challenges of a Roped Insulated Pipeline
Description:
Abstract Thermally insulated hot buried pipelines pose a unique set of challenges.
This paper discusses those challenges and how they were met during design and construction of the 150 km long Husky LLB Direct Pipeline, the longest thermally insulated oil pipeline in Canada.
Thermal insulation materials are soft and can be easily damaged during construction and backfilling, and by large restraining forces at bends when the pipeline is operating at high temperatures.
The large temperature difference between pipeline installation temperature and maximum operating temperature leads to large axial compressive forces that can cause movement at bends, crush insulation, increase temperatures at ground surface, cause loss of restraint, and in the worst case, lead to upheaval buckling and loss of containment.
Special design and construction features to deal with these challenges, including insulation specifications, insulation of pipe bends, pipeline pre-straining, long radius bends, deeper burial, and pipeline roping, were therefore necessary.
After pipe has been insulated with polyurethane foam it cannot be bent in standard field bending machines used for uninsulated pipes because the foam is too soft.
The induction bends and cold bends that are shop insulated after bending are expensive.
The Project minimized the number of these expensive insulated bends by using an engineered ditch bottom profile.
This meant that shop bends were only needed to reduce excavation depth at sharp changes in ground surface elevation where the roped profile required excessive grading.
Care was therefore necessary in the selection and development of specifications for the insulation system and shop fabricated bends, and to design and construct a ditch profile to minimize forces on the insulation and control upheaval buckling.
Close co-ordination with vendors and the construction contractor was crucial for a successful and timely completion.

Related Results

Installation Analysis of Matterhorn Pipeline Replacement
Installation Analysis of Matterhorn Pipeline Replacement
Abstract The paper describes the installation analysis for the Matterhorn field pipeline replacement, located in water depths between 800-ft to 1200-ft in the Gul...
Evaluation and Modeling the Performance of Rice Husk Gasifier Cook Stove for Household Energy Use
Evaluation and Modeling the Performance of Rice Husk Gasifier Cook Stove for Household Energy Use
This research paper aims to evaluate and model the performance of rice husk gasifier cook stoves for household energy use, a byproduct of rice milling. The study aims to address en...
Evaluation and Modeling the Performance of Rice Husk Gasifier Cook Stove for Household Energy Use
Evaluation and Modeling the Performance of Rice Husk Gasifier Cook Stove for Household Energy Use
This research paper aims to evaluate and model the performance of rice husk gasifier cook stoves for household energy use, a byproduct of rice milling. The study aims to address en...
Evaluation and Modeling the Performance of Rice Husk Gasifier Cook Stove for Household Energy Use
Evaluation and Modeling the Performance of Rice Husk Gasifier Cook Stove for Household Energy Use
This research paper aims to evaluate and model the performance of rice husk gasifier cook stoves for household energy use, a byproduct of rice milling. The study aims to address en...
First Arctic Subsea Pipelines Moving to Reality
First Arctic Subsea Pipelines Moving to Reality
Abstract Two offshore development projects which involve subsea arctic pipelines are being proposed by British Petroleum Exploration (BP). Both projects are locat...
Development and Use of Simulation Trainers for Pipeline Controllers
Development and Use of Simulation Trainers for Pipeline Controllers
Enbridge is in the forefront of development and application of computer simulation based training systems for Pipeline Controllers. Since 1985, the Pipeline Dynamics section of Enb...
A Fluid-pipe-soil Approach to Stability Design of Submarine Pipelines
A Fluid-pipe-soil Approach to Stability Design of Submarine Pipelines
Abstract The conventional approach to submarine pipeline stability design considers interactions between water and pipeline (fluid-pipe) and pipeline and seabed (...
Pipeline Resistance
Pipeline Resistance
Pipeline resistance is where an often abstract and wonky climate movement meets the bravery and boldness of Indigenous and other frontline defenders of land and water who inspire d...

Back to Top