Malaysian Larut Drilling - Pushing the Envelope in Extended Interval Drilling

View through CrossRef
Abstract Summary This paper presents a case history of a systematic approach to extending the typical open-hole section length seen in ExxonMobil Exploration & Production Malaysia Inc (EMEPMI) wells offshore the east coast of Peninsular Malaysia. Incremental improvements in shallower wells have allowed acceleration of the learning curve for use in the deeper, more complex wells. This approach was successfully completed at the Larut Platform with project wells breaking Malaysian records for open-hole section lengths and total measured depth, while minimizing the casing strings required and overall well cost. With prior drilling experience limited to relatively shallow wells of about 4000 meters (m) measured depth (MD), there was a concern that Malay Basin formations would not support open-hole sections with lengths greater than 2200m. To meet this challenge, successive Larut wells were planned with incremental increases in open-hole section length of up to 200m. Drilling parameters were monitored and documented in these wells to calibrate predicted torque and drag values for future extended reach wells in the development program. Drilling the first well in Larut Field resulted in little non-productive time associated with open-hole length or other related problems. As the open-hole section was systematically lengthened in subsequent wells, clean up time associated with circulation and back reaming operations at connections was optimized to compensate for the increased hole section length. Drilling data from the early wells provided credible friction factors which when used to model torque and drag in future extended reach wells did not predict any significant increase in risk for extending the open-hole sections. The documented data in the early step-out wells allowed the team to refine and execute best practices in hole cleaning and operational practices to suit even longer hole section drilling. The Larut program successfully pushed the envelope and produced two Malaysian record breaking wells with total depths (TD) greater than 5900m initially and then 6300m, both with a horizontal displacement (HD) to true vertical depth (TVD) ratio of 2.5. The project savings associated with pushing the envelope exceeds $4,000k USD to date.
Title: Malaysian Larut Drilling - Pushing the Envelope in Extended Interval Drilling
Description:
Abstract Summary This paper presents a case history of a systematic approach to extending the typical open-hole section length seen in ExxonMobil Exploration & Production Malaysia Inc (EMEPMI) wells offshore the east coast of Peninsular Malaysia.
Incremental improvements in shallower wells have allowed acceleration of the learning curve for use in the deeper, more complex wells.
This approach was successfully completed at the Larut Platform with project wells breaking Malaysian records for open-hole section lengths and total measured depth, while minimizing the casing strings required and overall well cost.
With prior drilling experience limited to relatively shallow wells of about 4000 meters (m) measured depth (MD), there was a concern that Malay Basin formations would not support open-hole sections with lengths greater than 2200m.
To meet this challenge, successive Larut wells were planned with incremental increases in open-hole section length of up to 200m.
Drilling parameters were monitored and documented in these wells to calibrate predicted torque and drag values for future extended reach wells in the development program.
Drilling the first well in Larut Field resulted in little non-productive time associated with open-hole length or other related problems.
As the open-hole section was systematically lengthened in subsequent wells, clean up time associated with circulation and back reaming operations at connections was optimized to compensate for the increased hole section length.
Drilling data from the early wells provided credible friction factors which when used to model torque and drag in future extended reach wells did not predict any significant increase in risk for extending the open-hole sections.
The documented data in the early step-out wells allowed the team to refine and execute best practices in hole cleaning and operational practices to suit even longer hole section drilling.
The Larut program successfully pushed the envelope and produced two Malaysian record breaking wells with total depths (TD) greater than 5900m initially and then 6300m, both with a horizontal displacement (HD) to true vertical depth (TVD) ratio of 2.
5.
The project savings associated with pushing the envelope exceeds $4,000k USD to date.

Related Results

Spontaneous Versus Directed Pushing Technique: Maternal and Neonatal Outcomes: A Comparative Study in Northern Upper Egypt
Spontaneous Versus Directed Pushing Technique: Maternal and Neonatal Outcomes: A Comparative Study in Northern Upper Egypt
Background: Maternal pushing during the 2nd stage of labor is indispensable and important contributor to the involuntary expulsive force developed by uterine contraction results to...
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Drilling in deeper formations and in high pressure and high temperature (HPHT) environments is a new frontier for the oil industry. Fifty years ago, no one would have imagined dril...
Planning Drilling Fluid Programs in Southeast Asia
Planning Drilling Fluid Programs in Southeast Asia
Planning the drilling fluids program is one of the most important steps in Planning the drilling fluids program is one of the most important steps in preparation for the drilling o...
Casing Drilling with Retrievable Drilling Assemblies
Casing Drilling with Retrievable Drilling Assemblies
Abstract Retrievable Casing Drilling* tools have been used to drill more than 600,000 ft of hole in over 120 wells encompassing six casing sizes ranging from 4-1/...
Potensi Antimikroba Fraksi Aktif Ekstrak n-Heksan Daun Rami (B.virgata F.) Guill terhadap Beberapa Mikroba Uji
Potensi Antimikroba Fraksi Aktif Ekstrak n-Heksan Daun Rami (B.virgata F.) Guill terhadap Beberapa Mikroba Uji
This study aims to determine the potential antimicrobial activity of extracts soluble, insoluble n-hexane and fractions of n-hexane extract of leaves of B. virgata, some microbial ...
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Abstract Pit less Drilling technology is a technology that eliminates the requirement for earthen pits or sumps to capture waste fluid. In this paper we will examine...
Application of Multiphase Flow Methods to Horizontal Underbalanced Drilling
Application of Multiphase Flow Methods to Horizontal Underbalanced Drilling
Abstract Multiphase flow can be present in all aspects of underbalanced drilling. This paper outlines the ways in which multiphase flow pressure loss calculations...
Recent Developments In Drilling Fluid Technology
Recent Developments In Drilling Fluid Technology
Drilling Technology has been continuously faced with new problems in drilling deeper and more difficult holes. A major problem is excessive friction caused by unstable hole conditi...