Javascript must be enabled to continue!
Deepwater Pipeline Challenges
View through CrossRef
With the ever-increasing demand of energy in the country, the Indian exploration and production is now compelled to move into deepwater frontiers. The country’s energy reserve is getting exhausted with drying shallow water assets and the mainland is already overwhelmed with the pressure of sustaining the world’s second largest population. Therefore, “the upstream oil and gas fraternity of the country” has to now enter “less explored” Indian deepwater block which has already started with the launch of the NELP block by the government.
Although, the world has moved into deepwater long back, the Indian industry is still developing the ways and means to tackle the challenges involved in deep water. This paper presents the insights into design and installation of deepwater pipelines along with case study of Middle East to India Deepwater Pipeline (MEIDP) of M/s SAGE, which shall be laid at a maximum water depth of 3450 m.
This paper broadly elucidates the challenges in designing the deepwater pipelines such as requirement of thick-walled line pipes to sustain collapse due to external over-pressure and tensile stresses generated due to installation forces, pipeline route selection and optimization, geo-hazard assessment & mitigation, design against fault line crossings/ seismic design, free span, repair systems, seabed intervention etc. It also covers the additional manufacturing & testing requirements including tighter tolerances for line pipes suitable for deepwater installations. It also highlights the deepwater installation capabilities of Pipe lay Barges for the laying of pipeline in the deepwater to ultra-deep waters along with new evolving testing and commissioning philosophies.
This paper intends to bring awareness among the “oil and gas fraternity” regarding challenges involved in deep water pipelines with respect to design, installation etc.
American Society of Mechanical Engineers
Title: Deepwater Pipeline Challenges
Description:
With the ever-increasing demand of energy in the country, the Indian exploration and production is now compelled to move into deepwater frontiers.
The country’s energy reserve is getting exhausted with drying shallow water assets and the mainland is already overwhelmed with the pressure of sustaining the world’s second largest population.
Therefore, “the upstream oil and gas fraternity of the country” has to now enter “less explored” Indian deepwater block which has already started with the launch of the NELP block by the government.
Although, the world has moved into deepwater long back, the Indian industry is still developing the ways and means to tackle the challenges involved in deep water.
This paper presents the insights into design and installation of deepwater pipelines along with case study of Middle East to India Deepwater Pipeline (MEIDP) of M/s SAGE, which shall be laid at a maximum water depth of 3450 m.
This paper broadly elucidates the challenges in designing the deepwater pipelines such as requirement of thick-walled line pipes to sustain collapse due to external over-pressure and tensile stresses generated due to installation forces, pipeline route selection and optimization, geo-hazard assessment & mitigation, design against fault line crossings/ seismic design, free span, repair systems, seabed intervention etc.
It also covers the additional manufacturing & testing requirements including tighter tolerances for line pipes suitable for deepwater installations.
It also highlights the deepwater installation capabilities of Pipe lay Barges for the laying of pipeline in the deepwater to ultra-deep waters along with new evolving testing and commissioning philosophies.
This paper intends to bring awareness among the “oil and gas fraternity” regarding challenges involved in deep water pipelines with respect to design, installation etc.
Related Results
New Tendon and Riser Technologies Improve TLP Competitiveness in Ultra- Deepwater
New Tendon and Riser Technologies Improve TLP Competitiveness in Ultra- Deepwater
Abstract
The extensive industry experience with design, fabrication, installation, and operation of TLPs in water depths up to 4,000 ft has demonstrated the flexi...
The Future of Regulations for the Deepwater GOM
The Future of Regulations for the Deepwater GOM
Abstract
Deepwater oil and gas activities in the U.S. Gulf of Mexico Outer ContinentalShelf (OCS) are regulated by the Minerals Management Service (MMS). The leve...
Installation Analysis of Matterhorn Pipeline Replacement
Installation Analysis of Matterhorn Pipeline Replacement
Abstract
The paper describes the installation analysis for the Matterhorn field pipeline replacement, located in water depths between 800-ft to 1200-ft in the Gul...
Selecting Seal Materials for Deepwater Completions
Selecting Seal Materials for Deepwater Completions
Abstract
A variety of seal materials have been used in downhole completions since the first cement plug was invented circa 1924. That first plug had a canvas wrap...
The Deep Star Project: An Overview Of Industry Cooperation
The Deep Star Project: An Overview Of Industry Cooperation
ABSTRACT
Texaco's vision for development of the deepwater in the Gulf of Mexico is closely tied to the concept of cooperation and evolution of a synergistic relat...
Installation of Deepwater Pipelines With Sled Assemblies Using The New J-Lay System of the DCV Balder
Installation of Deepwater Pipelines With Sled Assemblies Using The New J-Lay System of the DCV Balder
Abstract
This paper describes the most important features required for installing deepwater pipelines, pipelines with in-line sled assemblies, PLETs, and SCRs. Th...
First Arctic Subsea Pipelines Moving to Reality
First Arctic Subsea Pipelines Moving to Reality
Abstract
Two offshore development projects which involve subsea arctic pipelines are being proposed by British Petroleum Exploration (BP). Both projects are locat...
Deepwater Cone Penetration Tests
Deepwater Cone Penetration Tests
Abstract
This paper focuses on ground investigation by deepwater cone penetration tests (CPT). All current offshore CPT systems deploy subtraction-type cone penet...