Javascript must be enabled to continue!
Influence of rock bolt reinforcement on shear behaviour of a nonpersistent joint plane
View through CrossRef
Abstract
The impact of rock bolts on the mechanical behavior of nonpersistent joints, including the intricate interactions between the joints, rock bridges, and rock bolts, has received limited investigation despite their effectiveness in reinforcing rock mass discontinuities. In order to tackle this issue, a variety of normal stresses were applied during direct shear tests conducted on artificial rock-like specimens with nonpersistent joints, both bolted and unbolted. The findings indicated that the local shear deformation-shear displacement curves, whether with or without rock bolts, can be categorized into five distinct stages. Application of the rock bolts on the nonpersistent joint plane resulted in making the following two important statements: (a) The rock bolts delay the shear stress transmission along the joint plane from the joint parts to the rock bridge area; (b) The rock bolts limit the dilatancy occurring in both the joint parts and at the rock bridge area. Furthermore, the shear displacement of the bolted nonpersistent joint specimen at the peak shear strength was found to be greater than that of the unbolted nonpersistent joint specimen indicating protection of the rock bridge by the rock bolts. Whether bolted or unbolted, the stiffness values seem to be the same for the nonpersistent joint plane for a selected normal stress; this observation is significantly different from that observed for the persistent joint plane.
Springer Science and Business Media LLC
Title: Influence of rock bolt reinforcement on shear behaviour of a nonpersistent joint plane
Description:
Abstract
The impact of rock bolts on the mechanical behavior of nonpersistent joints, including the intricate interactions between the joints, rock bridges, and rock bolts, has received limited investigation despite their effectiveness in reinforcing rock mass discontinuities.
In order to tackle this issue, a variety of normal stresses were applied during direct shear tests conducted on artificial rock-like specimens with nonpersistent joints, both bolted and unbolted.
The findings indicated that the local shear deformation-shear displacement curves, whether with or without rock bolts, can be categorized into five distinct stages.
Application of the rock bolts on the nonpersistent joint plane resulted in making the following two important statements: (a) The rock bolts delay the shear stress transmission along the joint plane from the joint parts to the rock bridge area; (b) The rock bolts limit the dilatancy occurring in both the joint parts and at the rock bridge area.
Furthermore, the shear displacement of the bolted nonpersistent joint specimen at the peak shear strength was found to be greater than that of the unbolted nonpersistent joint specimen indicating protection of the rock bridge by the rock bolts.
Whether bolted or unbolted, the stiffness values seem to be the same for the nonpersistent joint plane for a selected normal stress; this observation is significantly different from that observed for the persistent joint plane.
Related Results
The Effect of Some Parameters on Behaviour and Bearing Capacity of Multi-Drum Stone Columns under Static Load and Earthquake
The Effect of Some Parameters on Behaviour and Bearing Capacity of Multi-Drum Stone Columns under Static Load and Earthquake
In this thesis, the effect of several important parameters on the behaviour and bearing capacity of multi-drum stone columns loaded by short-term static loads and earthquakes was i...
Stress Analysis of Full-length Bond Bolt Under Shear Deformation of Anchor Interface
Stress Analysis of Full-length Bond Bolt Under Shear Deformation of Anchor Interface
Abstract
Bolt anchoring force is closely related to the shear properties of the anchor interface. Considering the shear properties of anchoring agent and contact interface ...
Numerical modeling of optimized shear reinforcement inclination to improve ductility and punching shear capacity in RC slabs
Numerical modeling of optimized shear reinforcement inclination to improve ductility and punching shear capacity in RC slabs
Abstract
This study explores the interaction between shear reinforcement and inclined shear crack surfaces to identify the optimal shear reinforcement inclination...
Improvement of seismic performance of ordinary reinforced partially grouted concrete masonry shear walls
Improvement of seismic performance of ordinary reinforced partially grouted concrete masonry shear walls
Reinforced masonry constitutes about 10% of all low-rise construction in the US. Most of these structures are commercial and school buildings. It may also be used for multi-story h...
Experimental study on tensile behavior of blind bolt
Experimental study on tensile behavior of blind bolt
AbstractAs blind bolt can be installed only on one side, it has the advantage that ordinary high strength bolt doesn't have in the application of closed section connection. In this...
Bolt Loosening Behavior of Bolted Joints Under Repeated Transverse Loads
Bolt Loosening Behavior of Bolted Joints Under Repeated Transverse Loads
The objective of the paper is to examine bolt loosening behavior in a bolted joint under transverse loading both experimentally and numerically. Bolt loosening tests were carried o...
SCF Equations for T/Y and K Square-to-Round Tubular Joint
SCF Equations for T/Y and K Square-to-Round Tubular Joint
Summary
A parametric stress analysis of T/Y and K square-to-round tubular joints subjected to axial loads and in-plane and out-of-plane bending moments has been p...
Reliability-based design (RBD) of shallow foundations on rock masses
Reliability-based design (RBD) of shallow foundations on rock masses
[ACCESS RESTRICTED TO THE UNIVERSITY OF MISSOURI AT AUTHOR'S REQUEST.] The reliability-based design (RBD) approach that separately accounts for variability and uncertainty in load(...

