Permanent Mooring System for the Vega Field: Design, Fabrication, and Installation

View through CrossRef
ABSTRACT I n mid 1987 a 250 000 DWT converted tanker will be connected, through a rigid mooring yoke, to an articulated column which was installed during October 1986 in the VEGA field offshore from Sicily. This ARC-YOKE Mooring System is equipped to handle an estimated production of 60 000 barrels per day with a system allow in addition of difluent to the crude circulation in order to avoid clogging. The Paper gives a complete description of the system and some details of the fabrication of the most noteworthy components, such as t h e large - size universal and tri - axial joints. A large part of the paper is also devoted to column installation, which resorted to original procedures in order not to require the need underwater assistance. INTRODUCTION The VEGA field, which is located 12 miles off the southern coast o f Sicily, was discovered in 1980. Subsequent drilling in 1983 established it to be the largest oil deposit lying under Italian waters. The field is operated by SELM, a subsidiry of the Italian group MONTEDISON, on behalf o f a consortium in which SELM has a 30 % participation. The other participants are AGIP with 40 %, CANADA NORTH WEST w i t h 20 % and PETRO MARINE with 10 %. The first phase of the development will consist of a single platform for extracting the crude oil which is to be pumped directly in t o a floating storage unit in the form o f a 250.000 DWT tanker permanently moored 1.5 mile from the platform. The ARC-YOKE Mooring System, comprising a gravity base, an articulated column and a mooring arm, is designed t o operate for 25 years. Shuttle tankers will be employed to transport an estimated production o f 75 000 barrels per day t o there fineries. Onshore mating o f the two major components of the mooring system, i.e. the gravity base and column, was carried out in September, 1986, and the combined unit installed at its location in mid-October, 1986. The storage tanker, complete with its mooring arm, will be brought to the site and connected to the column in April, 1987, after completion of conversion works in Sicily. Initial production is expected t o commence in early Sumer 1987. FIELD DATA Site Data The water depth at the location of the ARC-YOKE Mooring System is 116.6 m and the one hundred year return conditions are as follows: (Table available in fullpaper)
Title: Permanent Mooring System for the Vega Field: Design, Fabrication, and Installation
Description:
ABSTRACT I n mid 1987 a 250 000 DWT converted tanker will be connected, through a rigid mooring yoke, to an articulated column which was installed during October 1986 in the VEGA field offshore from Sicily.
This ARC-YOKE Mooring System is equipped to handle an estimated production of 60 000 barrels per day with a system allow in addition of difluent to the crude circulation in order to avoid clogging.
The Paper gives a complete description of the system and some details of the fabrication of the most noteworthy components, such as t h e large - size universal and tri - axial joints.
A large part of the paper is also devoted to column installation, which resorted to original procedures in order not to require the need underwater assistance.
INTRODUCTION The VEGA field, which is located 12 miles off the southern coast o f Sicily, was discovered in 1980.
Subsequent drilling in 1983 established it to be the largest oil deposit lying under Italian waters.
The field is operated by SELM, a subsidiry of the Italian group MONTEDISON, on behalf o f a consortium in which SELM has a 30 % participation.
The other participants are AGIP with 40 %, CANADA NORTH WEST w i t h 20 % and PETRO MARINE with 10 %.
The first phase of the development will consist of a single platform for extracting the crude oil which is to be pumped directly in t o a floating storage unit in the form o f a 250.
000 DWT tanker permanently moored 1.
5 mile from the platform.
The ARC-YOKE Mooring System, comprising a gravity base, an articulated column and a mooring arm, is designed t o operate for 25 years.
Shuttle tankers will be employed to transport an estimated production o f 75 000 barrels per day t o there fineries.
Onshore mating o f the two major components of the mooring system, i.
e.
the gravity base and column, was carried out in September, 1986, and the combined unit installed at its location in mid-October, 1986.
The storage tanker, complete with its mooring arm, will be brought to the site and connected to the column in April, 1987, after completion of conversion works in Sicily.
Initial production is expected t o commence in early Sumer 1987.
FIELD DATA Site Data The water depth at the location of the ARC-YOKE Mooring System is 116.
6 m and the one hundred year return conditions are as follows: (Table available in fullpaper).

Related Results

Evaluation of Advanced Fibers for Deepwater Synthetic Fiber Mooring Systems
Evaluation of Advanced Fibers for Deepwater Synthetic Fiber Mooring Systems
Abstract Mooring systems utilizing polyester ropes have facilitated exploration and production of deepwater fields and represent a step-change in mooring system d...
Mooring Safety Assessment Using Reliability Techniques
Mooring Safety Assessment Using Reliability Techniques
ABSTRACT The paper deals with the reliability of offshore mooring systems. Reliability techniques have been applied to assess mooring systems designed by the quas...
Comparative Evaluation Of Disconnectable And Permanent Moorings For Fpsoâ??S In Harsh Environments
Comparative Evaluation Of Disconnectable And Permanent Moorings For Fpsoâ??S In Harsh Environments
ABSTRACT This paper discusses the factors that operators considering FPSO developments in harsh environments should evaluate when selecting between a permanent or...
Dynamic Response of a SPAR-Type Floating Wind Turbine Foundation with Taut Mooring System
Dynamic Response of a SPAR-Type Floating Wind Turbine Foundation with Taut Mooring System
Compared with the traditional catenary or semi-taut mooring lines, the taut mooring system is more advantageous in many aspects, such as reduction of mooring line loads, erosion an...
SS: Spar Technology- Developments in Deepwater spar installation
SS: Spar Technology- Developments in Deepwater spar installation
Abstract During the last seven years Heerema Marine Contractors (HMC) has installed more than half of all Spars in the deep waters of the Gulf of Mexico. The dual...
Neptune Project: Spar Hull, Mooring and Topsides Installation
Neptune Project: Spar Hull, Mooring and Topsides Installation
Abstract This paper describes the installation of the Neptune Spar at Viosca Knoll Block 826, approximately 90 miles south of Mobile, Alabama in the Gulf of Mexic...
Reliability of Mooring Systems: Application to Polyester Moorings
Reliability of Mooring Systems: Application to Polyester Moorings
Abstract The trend to deep water oilfields has accelerated the development of mooring systems. Future moorings requirements represent a considerable step out on c...
SS: MODU Anchor: Improved Predictions of MODU Fluke Anchors Increases the Confidence in Mooring System Design
SS: MODU Anchor: Improved Predictions of MODU Fluke Anchors Increases the Confidence in Mooring System Design
Abstract An overview of the current Norwegian and international requirements for design and installation of fluke anchors is given. Important design and installat...

Back to Top