Abstract Located in 8,200 feet water depth, the Cascade & Chinook subsea development risers are the deepest production risers in the world. These are also the first offset free-standing hybrid risers to be installed in the Gulf of Mexico, and the world's first use of hybrid risers in combination with a disconnectable turret-moored FPSO. This paper presents the unique benefits and challenges associated with using hybrid riser tower technology in the deepwater Gulf of Mexico, based on the experience gained by both client and contractor in executing the Cascade & Chinook riser project. The authors review the history of the Cascade & Chinook riser system, from concept selection through engineering, procurement, construction, installation and pre-commissioning. The most significant challenges and the key project management decisions are highlighted, covering: field layout considerations; strength and fatigue performance; design verification; interfaces with the production facility and subsea infrastructure; procurement and fabrication logistics, and spare materials philosophy; installation engineering and execution; safety and quality management; and regulatory compliance. The project management strategy, and the relationship between client and contractor through the project life cycle, are presented and critically assessed. The paper concludes with an evaluation of the delivery time, cost and project execution risks associated with the hybrid riser concept, and compares this with more traditional deepwater riser solutions, in the context of a deepwater Gulf of Mexico development. Introduction Cascade and Chinook are two separate fields located in the Walker Ridge Outer Continental Shelf leasing area of the central Gulf of Mexico, in the United States. They are situated near the Sigsbee Escarpment on the abyssal plain, in ultra deep water. Cascade is 160 miles south of the Louisiana coast in 8,200 feet water depth and Chinook is 16 miles south of Cascade in 8,800 feet water depth. Each field is being independently developed but they share a floating production, storage, and offloading (FPSO) unit, located between the two fields, and export infrastructure including two shuttle tankers and a gas export pipeline (Figure 1). The Cascade & Chinook project was sanctioned in late 2007 based on a phased development strategy. Phase I is an early production program. Reservoir and well productivity information obtained during Phase I will form the basis of later field development phases. The Phase I development required five risers: one pair of production risers for each of the Cascade and Chinook fields; and, one shared gas export riser. These risers are the subject of this paper. More details on the overall subsea development are discussed by Porciuncula, Ribeiro and Cassity1. The Cascade & Chinook risers are the first offset free-standing hybrid risers installed in the Gulf of Mexico. The Placid Green Canyon 29 and Enserch Garden Banks 388 developments of the 1980's and 90's used free-standing hybrid risers located directly beneath the floating production facility2. BP's Macondo emergency response riser was installed after the Cascade & Chinook risers, although its short period of operation occurred prior to arrival of the Cascade & Chinook FPSO, BW Pioneer.
Title: Cascade and Chinook Subsea Development: the World
Description:
Abstract Located in 8,200 feet water depth, the Cascade & Chinook subsea development risers are the deepest production risers in the world.
These are also the first offset free-standing hybrid risers to be installed in the Gulf of Mexico, and the world's first use of hybrid risers in combination with a disconnectable turret-moored FPSO.
This paper presents the unique benefits and challenges associated with using hybrid riser tower technology in the deepwater Gulf of Mexico, based on the experience gained by both client and contractor in executing the Cascade & Chinook riser project.
The authors review the history of the Cascade & Chinook riser system, from concept selection through engineering, procurement, construction, installation and pre-commissioning.
The most significant challenges and the key project management decisions are highlighted, covering: field layout considerations; strength and fatigue performance; design verification; interfaces with the production facility and subsea infrastructure; procurement and fabrication logistics, and spare materials philosophy; installation engineering and execution; safety and quality management; and regulatory compliance.
The project management strategy, and the relationship between client and contractor through the project life cycle, are presented and critically assessed.
The paper concludes with an evaluation of the delivery time, cost and project execution risks associated with the hybrid riser concept, and compares this with more traditional deepwater riser solutions, in the context of a deepwater Gulf of Mexico development.
Introduction Cascade and Chinook are two separate fields located in the Walker Ridge Outer Continental Shelf leasing area of the central Gulf of Mexico, in the United States.
They are situated near the Sigsbee Escarpment on the abyssal plain, in ultra deep water.
Cascade is 160 miles south of the Louisiana coast in 8,200 feet water depth and Chinook is 16 miles south of Cascade in 8,800 feet water depth.
Each field is being independently developed but they share a floating production, storage, and offloading (FPSO) unit, located between the two fields, and export infrastructure including two shuttle tankers and a gas export pipeline (Figure 1).
The Cascade & Chinook project was sanctioned in late 2007 based on a phased development strategy.
Phase I is an early production program.
Reservoir and well productivity information obtained during Phase I will form the basis of later field development phases.
The Phase I development required five risers: one pair of production risers for each of the Cascade and Chinook fields; and, one shared gas export riser.
These risers are the subject of this paper.
More details on the overall subsea development are discussed by Porciuncula, Ribeiro and Cassity1.
The Cascade & Chinook risers are the first offset free-standing hybrid risers installed in the Gulf of Mexico.
The Placid Green Canyon 29 and Enserch Garden Banks 388 developments of the 1980's and 90's used free-standing hybrid risers located directly beneath the floating production facility2.
BP's Macondo emergency response riser was installed after the Cascade & Chinook risers, although its short period of operation occurred prior to arrival of the Cascade & Chinook FPSO, BW Pioneer.

Related Results

Subsea Factory–Standardization of the Brownfield Factory
Subsea Factory–Standardization of the Brownfield Factory
Abstract As part of the corporate technology strategy Statoil has launched a technology plan for the Subsea Factory concept. The plan describes how to combine subsea...
Ormen Lange Subsea Production System
Ormen Lange Subsea Production System
Abstract This paper presents the concept and the technical solutions developed and applied to the Ormen Lange subsea production system. First, the key technical c...
High Voltage Subsea Pump – A Low Cost Subsea Boosting Enabler
High Voltage Subsea Pump – A Low Cost Subsea Boosting Enabler
In a cost constrained scenario, technology driven solutions aiming at CAPEX reductions are crucial to make Subsea Processing (SSP) projects economically attractive. Subsea Processi...
Technology Focus: Subsea Systems (August 2025)
Technology Focus: Subsea Systems (August 2025)
_ From a broader and high-level perspective—considering importance, impact, significance, and criticality—subsea systems and advanced offshore engineering play an...
Subsea Facilities
Subsea Facilities
Abstract This paper presents the system design and concept solutions selected for the Ormen Lange subsea facilities. The field is located in a r...
Autonomous Subsea Field Development - Value Proposition, Technology Needs and Gaps for Future Advancement
Autonomous Subsea Field Development - Value Proposition, Technology Needs and Gaps for Future Advancement
Abstract With increasing demand of subsea processing and surveillance goals Best-in-Class Operators are developing advanced subsea instrumentation and controls to ch...
Mensa Project: Subsea Tree System
Mensa Project: Subsea Tree System
Abstract This paper describes the design, product development and offshore installation of the subsea trees for the Shell Offshore Inc. (SOI) Mensa Project. The M...
Implementing Deepwater Subsea Reliability Strategy
Implementing Deepwater Subsea Reliability Strategy
Abstract For more than a decade, subsea technology has been perceived as delivering innovative, reliable and cost effective solutions to oil & gas exploitatio...