A Numerical Study Of Pressure Cycling Athabasca Oil Sand With Steam And Carbon Dioxide

View through CrossRef
Abstract An investigation was made into the efficacy of various post-communication development processes in an inverted [our-spot pattern in an Athabasca oil sand deposit. The recovery mechanism is the gravity drainage of mobilized bitumen into a previously established basal communication zone in the reservoir. Several different operating procedures were considered using two-dimensional (cross-sectional) thermal reservoir simulations. Five cases were considered:a direct steam flood of dead bitumen;pressure cycling dead bitumen;pressure cycling dead bitumen with CO2, added during the pressure build up cycle, using CO2, concentrations of 3 mol%. and5 mol%.;pressure cycling live bitumen. The efficiency of each process was compared using the cumulative oil-steam ratio (OSR) achieved. The results show that the addition of 3 mol%. CO2, yielded the highest OSR, while the addition of 5 mol% was slightly less effective. The total recoveries at the cut off time were actually highest when no steam additive was used, but the process efficiency measured by the OSR was poorest A study was also undertaken to investigate the sensitivity of the gravity drainage process to anisotropy in the permeability, grid refinement, and relative permeabilities. Introduction The study is of an Athabasca oil-sand deposit in which 26m of pay were identified, of which the bottom 4-6m contain a low bitumen saturation. The proposed recovery scheme required the development of communication between the injection and production wells in the low bitumen saturation basal zone. Once communication had been established the bitumen was expected to be recovered through the mechanism of gravity drainage, enhanced by steam pressure cycling and steam additives. A numerical study can provide insight into combinations of operating procedures with particular emphasis on individual mechanisms. In this work pressure cycling a dead bitumen was compared to a direct steam drive. Subsequently, the addition of carbon dioxide to the steam was considered during the reservoir pressure build up portions of the pressure cycles. Then the study was extended to the effect of a solution gas-oil ratio (GOR) in the bitumen. The final study was of parametric sensitivity, to provide a level of confidence in the results generated. The simulations were performed using an element of symmetry in an inverted four-spot pattern. A 5 × 10 grid was chosen to represent the reservoir for silJ1ulation, comprising five areal blocks of irregular widths and ten vertical blocks. Gravity Drainage Butler and Stevens1 have fully described the gravity drainage process in bitumen, where vertical and lateral growth of a steam chamber occurs. Closmann and Smith,2 discussed "ceiling drainage" into a horizontal fracture, where the steam front only expands vertically, heat being applied al an interface covering the entire base of the tar sand. This latter form of gravity drainage could occur where an initial communication path was present, such as a basal water sand. For these two cases the essential mechanics of recovery are the same. Pressure Cycling One complete pressure cycle consists of raising the reservoir pressure to a given maximum followed by blow down of the reservoir.
Title: A Numerical Study Of Pressure Cycling Athabasca Oil Sand With Steam And Carbon Dioxide
Description:
Abstract An investigation was made into the efficacy of various post-communication development processes in an inverted [our-spot pattern in an Athabasca oil sand deposit.
The recovery mechanism is the gravity drainage of mobilized bitumen into a previously established basal communication zone in the reservoir.
Several different operating procedures were considered using two-dimensional (cross-sectional) thermal reservoir simulations.
Five cases were considered:a direct steam flood of dead bitumen;pressure cycling dead bitumen;pressure cycling dead bitumen with CO2, added during the pressure build up cycle, using CO2, concentrations of 3 mol%.
and5 mol%.
;pressure cycling live bitumen.
The efficiency of each process was compared using the cumulative oil-steam ratio (OSR) achieved.
The results show that the addition of 3 mol%.
CO2, yielded the highest OSR, while the addition of 5 mol% was slightly less effective.
The total recoveries at the cut off time were actually highest when no steam additive was used, but the process efficiency measured by the OSR was poorest A study was also undertaken to investigate the sensitivity of the gravity drainage process to anisotropy in the permeability, grid refinement, and relative permeabilities.
Introduction The study is of an Athabasca oil-sand deposit in which 26m of pay were identified, of which the bottom 4-6m contain a low bitumen saturation.
The proposed recovery scheme required the development of communication between the injection and production wells in the low bitumen saturation basal zone.
Once communication had been established the bitumen was expected to be recovered through the mechanism of gravity drainage, enhanced by steam pressure cycling and steam additives.
A numerical study can provide insight into combinations of operating procedures with particular emphasis on individual mechanisms.
In this work pressure cycling a dead bitumen was compared to a direct steam drive.
Subsequently, the addition of carbon dioxide to the steam was considered during the reservoir pressure build up portions of the pressure cycles.
Then the study was extended to the effect of a solution gas-oil ratio (GOR) in the bitumen.
The final study was of parametric sensitivity, to provide a level of confidence in the results generated.
The simulations were performed using an element of symmetry in an inverted four-spot pattern.
A 5 × 10 grid was chosen to represent the reservoir for silJ1ulation, comprising five areal blocks of irregular widths and ten vertical blocks.
Gravity Drainage Butler and Stevens1 have fully described the gravity drainage process in bitumen, where vertical and lateral growth of a steam chamber occurs.
Closmann and Smith,2 discussed "ceiling drainage" into a horizontal fracture, where the steam front only expands vertically, heat being applied al an interface covering the entire base of the tar sand.
This latter form of gravity drainage could occur where an initial communication path was present, such as a basal water sand.
For these two cases the essential mechanics of recovery are the same.
Pressure Cycling One complete pressure cycle consists of raising the reservoir pressure to a given maximum followed by blow down of the reservoir.

Related Results

Sand Production Management
Sand Production Management
Abstract Sand production may be inevitable in many fields that have a relatively lower formation strength. Sand erosion and settling predictions and sand monitori...
Steam-CO Recovery Processes For Bottom Water Oil Reservoirs
Steam-CO Recovery Processes For Bottom Water Oil Reservoirs
Abstract Based on Pujol and Boberg's scaling criteria, a series of experiments on steam-CO2 injection strategies was conducted in a high temperature, high pressur...
TINBOP Cyclic Steam Injection Enhances Oil Recovery in Mature Steamfloods
TINBOP Cyclic Steam Injection Enhances Oil Recovery in Mature Steamfloods
Abstract In a previous paper (SPE/PS-CIM/CHOA 97850), we presented our findings on a novel cyclic steam injection method that we developed. The Top-Injection Bott...
Design and Evaluation of the Shiells Canyon Field Steam-Distillation Drive Pilot Project
Design and Evaluation of the Shiells Canyon Field Steam-Distillation Drive Pilot Project
This paper describes a steam-distillation drive pilot project being conducted in the Shiells Canyon Field to determine the effectiveness of steamflooding a light-oil reservoir. Ove...
Oil Vaporization During Steamflooding
Oil Vaporization During Steamflooding
Here is a procedure, intended for use with other techniques, for predicting the amount of oil vaporized, or distilled, in a steam zone predicting the amount of oil vaporized, or di...
Downhole Steam Generation for Green Heavy Oil Recovery
Downhole Steam Generation for Green Heavy Oil Recovery
Abstract The ultimate target of heavy oil recovery is to enhance oil mobility by transferring steam's thermal energy to the oil phase, incrementing its temperature, ...
The Hot Test of Primary Separation Equipment of Steam Generator for CAP1400 Nuclear Power Plant
The Hot Test of Primary Separation Equipment of Steam Generator for CAP1400 Nuclear Power Plant
A new type of Steam separator for CAP1400 Steam Generator is introduced. The result of characteristic experiment, the variables of which contain steam load, saturated water flow an...