Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Impact of Labour Productivity Factors on Construction Project Cost and Time

View through CrossRef
Productivity is the dominating aspect in construction as it encourages cost savings and effective utilization of resources. Poor labour productivity is one of the major causes of cost and time overrun in construction projects and as such requires attention. Previous studies have identified factors affecting labour productivity within building projects, however, there is need to understand these factors as it relates to their impact on cost and time. In view of this, the paper aimed at assessing the impact of factors affecting labour productivity on cost and time, with a view to minimizing their effects on construction projects. The study elicits knowledge gained by project managers actively engaged in construction projects within Abuja been the Federal Capital Territory and employed the use of a survey. A well-structured questionnaire was designed to collect data with respect to degree of impact of labour productivity factors on construction project cost, and time using a five-point Likert scale and distributed to 45 project managers using purposive sampling. Responses from the administered questionnaires were collated, interpreted, and analysed using descriptive statistics, and results presented in tables. The findings showed that material shortage at project site with a mean value of 3.68 had significant impact on construction project cost. Furthermore, lack of tools and equipment in the market, and workforce absenteeism with mean values of 3.65 and 3.62 respectively had significant impacts on construction project time. The study concludes that material shortage, lack of tools and equipment in the market, and workforce absenteeism are labour productivity factors that had significant impact on construction project cost and time. Thus, Construction managers should enforce the use of material supply schedule, and adopt appropriate financial incentives for employee’s that could curtail the problem of absenteeism.
Title: Impact of Labour Productivity Factors on Construction Project Cost and Time
Description:
Productivity is the dominating aspect in construction as it encourages cost savings and effective utilization of resources.
Poor labour productivity is one of the major causes of cost and time overrun in construction projects and as such requires attention.
Previous studies have identified factors affecting labour productivity within building projects, however, there is need to understand these factors as it relates to their impact on cost and time.
In view of this, the paper aimed at assessing the impact of factors affecting labour productivity on cost and time, with a view to minimizing their effects on construction projects.
The study elicits knowledge gained by project managers actively engaged in construction projects within Abuja been the Federal Capital Territory and employed the use of a survey.
A well-structured questionnaire was designed to collect data with respect to degree of impact of labour productivity factors on construction project cost, and time using a five-point Likert scale and distributed to 45 project managers using purposive sampling.
Responses from the administered questionnaires were collated, interpreted, and analysed using descriptive statistics, and results presented in tables.
The findings showed that material shortage at project site with a mean value of 3.
68 had significant impact on construction project cost.
Furthermore, lack of tools and equipment in the market, and workforce absenteeism with mean values of 3.
65 and 3.
62 respectively had significant impacts on construction project time.
The study concludes that material shortage, lack of tools and equipment in the market, and workforce absenteeism are labour productivity factors that had significant impact on construction project cost and time.
Thus, Construction managers should enforce the use of material supply schedule, and adopt appropriate financial incentives for employee’s that could curtail the problem of absenteeism.

Related Results

A Study on Impact of Labour Productivity on Construction Project Process
A Study on Impact of Labour Productivity on Construction Project Process
In the construction industry, labour productivity is the most important factor in construction projects. As construction work widely depends on labour. When labour productivity is ...
Factors for improving productivity in the New Zealand residential construction sector
Factors for improving productivity in the New Zealand residential construction sector
Purpose The New Zealand (NZ) construction industry significantly impacts the country's economy and is one of the largest sectors in terms of total employment. H...
Time and Architecture
Time and Architecture
In the Italian language, the term “tempo” (literally time) is a word of daily use to which we attribute many meanings. It can signify a chronological dimension between past, prese...
The Factors Affecting Labour Productivity in the Construction of Prestressed Concrete Buildings in Ghana
The Factors Affecting Labour Productivity in the Construction of Prestressed Concrete Buildings in Ghana
The construction industries face several challenges related to productivity. Productivity mainly depends upon labour effort and performance. The poor productivity of labour is one ...
ISSUES OF PROVIDING GUARANTEES AND SOCIAL PROTECTION FOR EAEU LABOUR MIGRANTS
ISSUES OF PROVIDING GUARANTEES AND SOCIAL PROTECTION FOR EAEU LABOUR MIGRANTS
Background: Today, the Eurasian Economic Union (hereinafter the EAEU) has formed its own labour market; however, in the current international environment, issues related to ensurin...
IMPACT OF REGULATIONS ON CONSTRUCTION LABOUR PRODUCTIVITY
IMPACT OF REGULATIONS ON CONSTRUCTION LABOUR PRODUCTIVITY
Labour productivity in the construction industry has significantly declined. Therefore, there is a need to assess construction labour productivity in the present day. Regulation is...
LABOUR MARKET DYNAMICS IN UKRAINE DURING WAR: ANALYSIS OF MIGRATION TRENDS AND UNEMPLOYMENT INDICATORS
LABOUR MARKET DYNAMICS IN UKRAINE DURING WAR: ANALYSIS OF MIGRATION TRENDS AND UNEMPLOYMENT INDICATORS
Purpose. The aim of this study is to determine the influence of the wartime period on Ukraine's labour market, analyse key transformations and imbalances resulting from changes in ...
Exploring industry's contribution to the labour-intensive construction of low order rural community access roads
Exploring industry's contribution to the labour-intensive construction of low order rural community access roads
The Government of South Africa supports labour-intensive work methodologies as a means of alleviating unemployment in South Africa. In 2004 the Expanded Public Works Programme (EPW...

Back to Top