Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Multigrid Methods for Petroleum Reservoir Simulation on SIMD Machines

View through CrossRef
Abstract In this paper we consider several multigrid methods on SIMD (single instruction, multiple data) architectures. The advantages and disadvantages of these methods are discussed. Actual timing data will be presented only at the meeting, since otherwise this paper would contain data five months old, rendering it obsolete in the current fast-moving world of parallel computation. In a previous paper [DMRRS], a semicoarsening multigrid procedure was considered for solving three-dimensional problems that arise from pressure equations in reservoir simulation. In this procedure, semicoarsening was coupled with plane relaxation in order to accommodate anisotropies and heterogeneities. Subsequent work by Schaffer [S,SW] has improved the robustness of this procedure. Results of the implementation on the CM-200 of the twodimensional version of this procedure will be described, as will progress on the implementation on the CM-5 of the two-dimensional and three-dimensional versions. Another possibility involves the use of Mulder's method as developed by Naik and Van Rosendale. [NR] In this method semicoarsened grids in both x and y (and z in three dimensions) are employed. The advantage is that general anisotropic problems require only point relaxation. This approach is compared to the above approach and shown to have better convergence factors but to be less efficient than the above method on machines like the CRAY-YMP. This method is being implemented on the CM-200 and CM-5 by using concurrent relaxation, interpolation, and restriction. This approach yields great parallelism but at the sacrifice of the splendid convergence factors. A third possibility involves standard coarsening multigrid. This method seems less attractive than semicoarsening multigrid for SIMD machines, especially for three-dimensional problems. A final possibility is the method referred to as BHT in [DIR]. This method uses standard coarsening but for every grid employs four coarse grids, thus keeping all the processors busy at every level. Busyness of processors is not innately virtuous, but the employment of supplemental coarse grids gives rise to a method which requires only point relaxation for simple anisotropic problems. It is the latter feature which makes the BHT method potentially attractive.
Title: Multigrid Methods for Petroleum Reservoir Simulation on SIMD Machines
Description:
Abstract In this paper we consider several multigrid methods on SIMD (single instruction, multiple data) architectures.
The advantages and disadvantages of these methods are discussed.
Actual timing data will be presented only at the meeting, since otherwise this paper would contain data five months old, rendering it obsolete in the current fast-moving world of parallel computation.
In a previous paper [DMRRS], a semicoarsening multigrid procedure was considered for solving three-dimensional problems that arise from pressure equations in reservoir simulation.
In this procedure, semicoarsening was coupled with plane relaxation in order to accommodate anisotropies and heterogeneities.
Subsequent work by Schaffer [S,SW] has improved the robustness of this procedure.
Results of the implementation on the CM-200 of the twodimensional version of this procedure will be described, as will progress on the implementation on the CM-5 of the two-dimensional and three-dimensional versions.
Another possibility involves the use of Mulder's method as developed by Naik and Van Rosendale.
[NR] In this method semicoarsened grids in both x and y (and z in three dimensions) are employed.
The advantage is that general anisotropic problems require only point relaxation.
This approach is compared to the above approach and shown to have better convergence factors but to be less efficient than the above method on machines like the CRAY-YMP.
This method is being implemented on the CM-200 and CM-5 by using concurrent relaxation, interpolation, and restriction.
This approach yields great parallelism but at the sacrifice of the splendid convergence factors.
A third possibility involves standard coarsening multigrid.
This method seems less attractive than semicoarsening multigrid for SIMD machines, especially for three-dimensional problems.
A final possibility is the method referred to as BHT in [DIR].
This method uses standard coarsening but for every grid employs four coarse grids, thus keeping all the processors busy at every level.
Busyness of processors is not innately virtuous, but the employment of supplemental coarse grids gives rise to a method which requires only point relaxation for simple anisotropic problems.
It is the latter feature which makes the BHT method potentially attractive.

Related Results

RC-SIMD: Reconfigurable communication SIMD architecture for image processing applications
RC-SIMD: Reconfigurable communication SIMD architecture for image processing applications
During the last two decades, Single Instruction Multiple Data (SIMD) processors have become important architectures in embedded systems for image processing applications. The main ...
New Perspectives for 3D Visualization of Dynamic Reservoir Uncertainty
New Perspectives for 3D Visualization of Dynamic Reservoir Uncertainty
This reference is for an abstract only. A full paper was not submitted for this conference. Abstract 1 Int...
Casing Deformation in Ekofisk
Casing Deformation in Ekofisk
Summary Casing deformation resulting from reservoir compaction occurred in the Ekofisk field operated by Phillips Petroleum Co. Norway and is a serious problem in...
Petroleum Education in the People’s Republic of China
Petroleum Education in the People’s Republic of China
Abstract Petroleum education in China is, like petroleum production itself, a development of relatively recent years. In 1949, when the annual crude oil output was 1...
Risk Assessment of Oil Fields Using Proxy Models: A Case Study
Risk Assessment of Oil Fields Using Proxy Models: A Case Study
Abstract Reservoir studies commonly consider many scenarios, cases and realizations. However, reservoir simulation can be expensive. Statistical design has been u...
Microcomputers and Petroleum Economics Software: A Purchaser's Guide
Microcomputers and Petroleum Economics Software: A Purchaser's Guide
Summary Microcomputers with software designed specifically for the petroleum industry can provide a highly cost-effective alternative to petroleum industry can pr...
Improved Reservoir Fluid Estimation for Prospect Evaluation Using Mud Gas Data
Improved Reservoir Fluid Estimation for Prospect Evaluation Using Mud Gas Data
Abstract Reservoir fluid estimation for exploration prospects can be random and of large uncertainties. Typically, the reservoir fluid estimation in a prospect can b...

Back to Top