Javascript must be enabled to continue!
A Systems Approach to Production Management: Beryl Field Case Study
View through CrossRef
Abstract
When Beryl Field gas sales commenced in 1992, a production management system was implemented to ensure that gas sales targets were met without compromising oil production rates. This paper describes the operator's experience in establishing this system.
In the Beryl Field, systems analysis techniques are applied in both the data gathering and well modelling procedures. This approach has resulted in significant improvements in both the quality of field data and the accuracy of model predictions. The production system model is used for optimising lift gas allocation, production forecasting for normal and maintenance scenarios and workover planning.
The evolution of the production management system is described and its application to routine operations and special projects is illustrated by examples. The techniques described are general and can be applied to all production optimisation applications.
Introduction
Production optimisation is as much a culture as a technology. For any production optimisation initiative to succeed, the entire organisation must accept responsibility for data gathering and interpretation. This paper describes changes in the operating environment that catalysed the development of this system, along with the operators approach to data acquisition, the management of the collected and interpreted data, well model construction and maintenance practices, and the cultural elements which influenced the Beryl Field optimisation project. The resulting production management system has significantly increased production efficiencies and today, is a reliable component of the Beryl Field design, decision and implementation processes.
Background
The Beryl field, located in Block 9/13 of the UK sector of the North Sea, has produced approximately 650 MMSTB of oil and 700 Bcf of gas since production commenced in June 1976. The Beryl A Condeep structure, which contains the crude storage and loading facilities, has two separation trains each capable of handling 70 MSTB/D of oil, 60 MSTB/D of produced water and 300 MMscf/D of gas. The Beryl B platform, which began production in 1984, has a single separator train with a throughput capacity of 70 MSTB/D of oil, 60 MSTB/D of produced water and 200 MMscf/D of gas. On both platforms, gas compression capacity is the limiting production constraint.
P. 199
Title: A Systems Approach to Production Management: Beryl Field Case Study
Description:
Abstract
When Beryl Field gas sales commenced in 1992, a production management system was implemented to ensure that gas sales targets were met without compromising oil production rates.
This paper describes the operator's experience in establishing this system.
In the Beryl Field, systems analysis techniques are applied in both the data gathering and well modelling procedures.
This approach has resulted in significant improvements in both the quality of field data and the accuracy of model predictions.
The production system model is used for optimising lift gas allocation, production forecasting for normal and maintenance scenarios and workover planning.
The evolution of the production management system is described and its application to routine operations and special projects is illustrated by examples.
The techniques described are general and can be applied to all production optimisation applications.
Introduction
Production optimisation is as much a culture as a technology.
For any production optimisation initiative to succeed, the entire organisation must accept responsibility for data gathering and interpretation.
This paper describes changes in the operating environment that catalysed the development of this system, along with the operators approach to data acquisition, the management of the collected and interpreted data, well model construction and maintenance practices, and the cultural elements which influenced the Beryl Field optimisation project.
The resulting production management system has significantly increased production efficiencies and today, is a reliable component of the Beryl Field design, decision and implementation processes.
Background
The Beryl field, located in Block 9/13 of the UK sector of the North Sea, has produced approximately 650 MMSTB of oil and 700 Bcf of gas since production commenced in June 1976.
The Beryl A Condeep structure, which contains the crude storage and loading facilities, has two separation trains each capable of handling 70 MSTB/D of oil, 60 MSTB/D of produced water and 300 MMscf/D of gas.
The Beryl B platform, which began production in 1984, has a single separator train with a throughput capacity of 70 MSTB/D of oil, 60 MSTB/D of produced water and 200 MMscf/D of gas.
On both platforms, gas compression capacity is the limiting production constraint.
P.
199.
Related Results
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Abstarct
Introduction
Isolated brain hydatid disease (BHD) is an extremely rare form of echinococcosis. A prompt and timely diagnosis is a crucial step in disease management. This ...
Development Of The Beryl A Field
Development Of The Beryl A Field
Abstract
Development drilling from the Beryl 'A' Platform has been in progress for over two years. A total of twelve wells nave been completed with two more neari...
Aquamarine Mineralization in the Black River Batholith, Yukon Territory, Canada
Aquamarine Mineralization in the Black River Batholith, Yukon Territory, Canada
The central Yukon Territory is renowned for its exceptionally abundant beryl occurrences. In 2003, widespread medium-blue aquamarine mineralization was discovered in the Black Rive...
Breast Carcinoma within Fibroadenoma: A Systematic Review
Breast Carcinoma within Fibroadenoma: A Systematic Review
Abstract
Introduction
Fibroadenoma is the most common benign breast lesion; however, it carries a potential risk of malignant transformation. This systematic review provides an ove...
Effect of beryl and graphene nano platelets reinforcements on the wear behaviour of AL7075- beryl graphene particulate hybrid nano composites
Effect of beryl and graphene nano platelets reinforcements on the wear behaviour of AL7075- beryl graphene particulate hybrid nano composites
The effect of beryl particles and graphene nano platelets (GNPs) on the wear behaviour of Al7075-beryl-graphene hybrid composites has been studied. The hybrid composites were devel...
High resolution zonation within a tide-dominated deltaic reservoir: the Middle Jurassic Beryl Formation, Beryl Field, UKCS
High resolution zonation within a tide-dominated deltaic reservoir: the Middle Jurassic Beryl Formation, Beryl Field, UKCS
The Middle Jurassic (Bajocian–Bathonian) Beryl Formation of the Beryl (Bravo) Field (Viking Graben), has been produced since 1979 and contains estimated remaining reserves of 180 ×...
Hydatid Cyst of The Orbit: A Systematic Review with Meta-Data
Hydatid Cyst of The Orbit: A Systematic Review with Meta-Data
Abstarct
Introduction
Orbital hydatid cysts (HCs) constitute less than 1% of all cases of hydatidosis, yet their occurrence is often linked to severe visual complications. This stu...
Chest Wall Hydatid Cysts: A Systematic Review
Chest Wall Hydatid Cysts: A Systematic Review
Abstract
Introduction
Given the rarity of chest wall hydatid disease, information on this condition is primarily drawn from case reports. Hence, this study systematically reviews t...

