Beachpull Installation of Long Pipelines and Cables
View through CrossRef
Conventional pipelay (i.e. S-lay) is not feasible in shallow water locations owing to the draft of pipelay barges. Pipelay using beachpull method provides an alternative to such restrictions. A typical long beachpull operation in shallow water environment presents a substantial challenge, which calls for a thorough engineering analysis along with a detailed installation procedure.
This paper highlights the methods and techniques of pipelay using beachpull method that were employed on the John Brookes joint venture (Apache and Santos) and the Aramco Karan project. The John Brookes project (Varanus Island, Australia) included the installation of a landfall section comprising an 18” FBE coated pipeline featuring a beachpull length of 7.0 km, one of the longest of its kind. The Karan project (Saudi Arabia) comprised the installation of a 38” trunkline, requiring a beachpull length of 3.0 km and also the installation of a 15kV cable having a beachpull length of 4.0 km.
Beachpull engineering comprised checking the pipeline’s lateral stability under the influence of near-shore current-induced hydrodynamic forces. For the Apache Project, the 7.0 km long beachpull coupled with the proximity to the existing pipeline and near-shore currents offered a unique challenge. Supplementary buoyancy was utilized to limit the required beachpull tension within allowable limits. The drifting of the pipeline from the installation corridor was restricted by installing sand-filled bulker bags at designed intervals. The beachpull installation on the Karan project offered a different challenge owing to a larger pipe size and a piggybacked cable in a shallow water depth. Special consideration was given to the attachment of supplementary buoyancy bags and dynamic loadings that were acting throughout the beachpull length, especially during cable installation.
This paper describes the technical challenges faced during the estimation of the pull-in loads and weather-induced lateral displacements encountered during the beachpull. This paper also elaborates the assessment of proposed winch, design of supplementary buoyancy, design of bulker bags, etc.
Data collected on-site during installation of the pipelines are in good agreement with computed / designed values, ensuring the correctness of the beachpull simulations. Detailed engineering studies along with well developed installation procedures resulted in successful completion of the installation.
American Society of Mechanical Engineers
Title: Beachpull Installation of Long Pipelines and Cables
Description:
Conventional pipelay (i.
e.
S-lay) is not feasible in shallow water locations owing to the draft of pipelay barges.
Pipelay using beachpull method provides an alternative to such restrictions.
A typical long beachpull operation in shallow water environment presents a substantial challenge, which calls for a thorough engineering analysis along with a detailed installation procedure.
This paper highlights the methods and techniques of pipelay using beachpull method that were employed on the John Brookes joint venture (Apache and Santos) and the Aramco Karan project.
The John Brookes project (Varanus Island, Australia) included the installation of a landfall section comprising an 18” FBE coated pipeline featuring a beachpull length of 7.
0 km, one of the longest of its kind.
The Karan project (Saudi Arabia) comprised the installation of a 38” trunkline, requiring a beachpull length of 3.
0 km and also the installation of a 15kV cable having a beachpull length of 4.
0 km.
Beachpull engineering comprised checking the pipeline’s lateral stability under the influence of near-shore current-induced hydrodynamic forces.
For the Apache Project, the 7.
0 km long beachpull coupled with the proximity to the existing pipeline and near-shore currents offered a unique challenge.
Supplementary buoyancy was utilized to limit the required beachpull tension within allowable limits.
The drifting of the pipeline from the installation corridor was restricted by installing sand-filled bulker bags at designed intervals.
The beachpull installation on the Karan project offered a different challenge owing to a larger pipe size and a piggybacked cable in a shallow water depth.
Special consideration was given to the attachment of supplementary buoyancy bags and dynamic loadings that were acting throughout the beachpull length, especially during cable installation.
This paper describes the technical challenges faced during the estimation of the pull-in loads and weather-induced lateral displacements encountered during the beachpull.
This paper also elaborates the assessment of proposed winch, design of supplementary buoyancy, design of bulker bags, etc.
Data collected on-site during installation of the pipelines are in good agreement with computed / designed values, ensuring the correctness of the beachpull simulations.
Detailed engineering studies along with well developed installation procedures resulted in successful completion of the installation.
Related Results
Braided tubular superelastic cables provide improved spinal stability compared to multifilament sublaminar cables
Braided tubular superelastic cables provide improved spinal stability compared to multifilament sublaminar cables
This study investigates the use of braided tubular superelastic cables, previously used for sternum closure following sternotomy, as sublaminar fixation method. It compares the bio...
Auscultation non destructive de la précontrainte extérieure des ouvrages d'art
Auscultation non destructive de la précontrainte extérieure des ouvrages d'art
Ce travail porte sur l’auscultation des câbles de précontrainte extérieure et des différentes méthodes, appliquées ou théoriques visant à détecter les défauts de ce type de câbles....
Make Simulatable 3D Cable Model from Single RGB Image
Make Simulatable 3D Cable Model from Single RGB Image
With the development of the times, use the electrical devices is essential for our daily live. For using these devices, we need cables to charge or connect them. So, for people, th...
Modélisation du transfert thermique des câbles en galerie
Modélisation du transfert thermique des câbles en galerie
Une analyse critique de la modélisation des échanges thermiques des câbles d’énergie en galerie est réalisée, avec l’étude de facteurs d’influences propres aux modes de pose des câ...
Discrete Reconfigurations of Cable-Driven Parallel Robots
Discrete Reconfigurations of Cable-Driven Parallel Robots
Reconfigurations discrètes de robots parallèles à câbles
Les Robots Parallèles à Câbles (RPCs) sont des robots parallèles dont les jambes se composent de câbles. Le...
Subsea Environmental Sensing with Operational Submarine Cables
Subsea Environmental Sensing with Operational Submarine Cables
I present the results of the Suboptic working group formed during the Suboptic 2023 conference to create a synergy between submarine cable owners and government institutions to imp...
SS: Spar Technology- Developments in Deepwater spar installation
SS: Spar Technology- Developments in Deepwater spar installation
Abstract
During the last seven years Heerema Marine Contractors (HMC) has installed more than half of all Spars in the deep waters of the Gulf of Mexico. The dual...
Pigging Previously Unpiggable Pipelines
Pigging Previously Unpiggable Pipelines
Abstract
The efficient and safe transportation of fluids through pipelines has been a cornerstone of modern infrastructure for decades. However, pipeline operators o...