Abstract
The Large Hadron Collider (LHC) Long Shutdown 2
(2019–2021), following LHC Run 2, was primarily dedicated to the
upgrade of the LHC Injectors but it included also a significant
amount of activities aimed at consolidation of the LHC machine
components, removal of known limitations and initial upgrades in
view of the High-Luminosity LHC (HL-LHC) to favour the intensity
ramp-up during Run 3 (2022–2025). An overview of the major
modifications to the accelerator and its systems is followed by a
summary of the results of the superconducting magnet training
campaign to increase the LHC operation energy beyond the maximum
value of 6.5 TeV reached during Run 2. The LHC configuration and
the scenarios for proton and ion operation for Run 3 are presented
considering the expected performance of the upgraded LHC Injectors
and the proton beam intensity limitations resulting from the heat
load on the cryogenic system due to beam-induced electron cloud and
impedance.
IOP Publishing
G. Arduini
V. Baglin
H. Bartosik
L. Bottura
C. Bracco
B. Bradu
G. Bregliozzi
K. Brodzinski
R. Bruce
M. Calviani
P. Chiggiato
P. Cruikshank
S. Claudet
D. Delikaris
S. Fartoukh
C. Garion
M. Himmerlich
M. Hostettler
G. Iadarola
S. Kostoglou
S. Le Naour
A. Lechner
T. Lefevre
L. Mether
Y. Papaphilippou
V. Petit
M. Pojer
A. Poyet
S. Redaelli
F. Rodriguez Mateos
G. Rumolo
B. Salvant
F. Sanchez Galan
A. Siemko
M. Solfaroli-Camillocci
G. Sterbini
M. Taborelli
L. Tavian
H. Timko
J.-Ph. Tock
A. Verweij
M. Wendt
J. Wenninger
D. Wollmann
Ch. Yin Vallgren
Title: LHC Upgrades in preparation of Run 3
Description:
Abstract
The Large Hadron Collider (LHC) Long Shutdown 2
(2019–2021), following LHC Run 2, was primarily dedicated to the
upgrade of the LHC Injectors but it included also a significant
amount of activities aimed at consolidation of the LHC machine
components, removal of known limitations and initial upgrades in
view of the High-Luminosity LHC (HL-LHC) to favour the intensity
ramp-up during Run 3 (2022–2025).
An overview of the major
modifications to the accelerator and its systems is followed by a
summary of the results of the superconducting magnet training
campaign to increase the LHC operation energy beyond the maximum
value of 6.
5 TeV reached during Run 2.
The LHC configuration and
the scenarios for proton and ion operation for Run 3 are presented
considering the expected performance of the upgraded LHC Injectors
and the proton beam intensity limitations resulting from the heat
load on the cryogenic system due to beam-induced electron cloud and
impedance.
Related Results
US contribution to the High Luminosity LHC Upgrade: focusing quadrupoles and crab cavities
US contribution to the High Luminosity LHC Upgrade: focusing quadrupoles and crab cavities
Abstract
In the early 2000’s, the US High Energy Physics community contributing to the Large Hadron Collider (LHC) launched the LHC Accelerator R&D Program (LARP...
Searching for long-lived particles beyond the Standard Model at the Large Hadron Collider
Searching for long-lived particles beyond the Standard Model at the Large Hadron Collider
Abstract
Particles beyond the Standard Model (SM) can generically have lifetimes that are long compared to SM particles at the weak scale. When produced at experimen...
Production of light nuclei and antinuclei in Pb-Pb collisions at the LHC
Production of light nuclei and antinuclei in Pb-Pb collisions at the LHC
Das Feld der Hochenergie-Schwerionenforschung hat sich der Untersuchung des Quark-Gluon-Plasmas (QGP) gewidmet. Ein QGP ist ein sehr heißer und dichter Materiezustand, der kurz nac...
Higgs trilinear coupling in the standard model effective field theory at the high luminosity LHC and the FCC-ee
Higgs trilinear coupling in the standard model effective field theory at the high luminosity LHC and the FCC-ee
Motivated by the updated high luminosity (HL)-LHC projections for Higgs pair production from ATLAS and CMS and by the release of the FCC-ee feasibility study, we critically revisit...
Results and Perspectives from the First Two Years of Neutrino Physics at the LHC by the SND@LHC Experiment
Results and Perspectives from the First Two Years of Neutrino Physics at the LHC by the SND@LHC Experiment
After rapid approval and installation, the SND@LHC Collaboration was able to gather data successfully in 2022 and 2023. Neutrino interactions from νμs originating at the LHC IP1 we...
Functional analysis and design of the cryogenic system for the HL-LHC IT String test bench at CERN
Functional analysis and design of the cryogenic system for the HL-LHC IT String test bench at CERN
Abstract
The High Luminosity LHC (HL-LHC) is a project aiming to upgrade the LHC collider to maintain scientific progress and exploit its full capacity. In the HL-LH...
Development of gas systems for gaseous detector operation at HL-LHC
Development of gas systems for gaseous detector operation at HL-LHC
Développement de systèmes de gaz pour le fonctionnement des détecteurs gazeux au HL-LHC
Après les résultats très remarquables obtenus au cours des premières décenni...
Algorithms for the Level-1 trigger with the HGCAL calorimeter for theCMS HL-LHC upgrade
Algorithms for the Level-1 trigger with the HGCAL calorimeter for theCMS HL-LHC upgrade
Algorithmes pour le déclenchement de niveau 1 pour le calorimètre HGCAL du détecteur CMS au HL-LHC
L'instrumentation moderne en physique des particules (HEP) fait f...