Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Research on the rework risk core tasks in prefabricated construction in China

View through CrossRef
PurposeThe purpose of this paper is to assess the process of prefabricated construction (PC) and analyze the impacts of rework risk to identify the core tasks for which the rework risk has severe impacts.Design/methodology/approachThe methods consist of a literature review, expert interviews, a questionnaire survey and a rework risk function. The expert interviews and questionnaire survey were administered to experts in the entire process of PC from the dimensions of rework frequency, rework cost and rework time. Descriptive and inferential statistics were employed to analyze the data. The rework risk function was based on the loss expectancy method.FindingsThere are 13 core tasks that have higher impacts than the average level. The core tasks in the design stage account for 100% of the tasks in the stage, those in the manufacturing stage account for 20% and those in the construction stage account for 23.1%. Compared with the other stages, the design stage is characterized by significantly more frequent rework, higher rework costs and longer rework time. The manufacturing stage is characterized by significantly higher rework costs than the construction stage. The manufacturing stage and construction stage are co-reliant, and both are impacted by the design stage.Practical implicationsThe findings provide stakeholders with a clear understanding of the core tasks of the PC process and represent a method for identifying core tasks. Stakeholders can learn from this to focus on the core tasks to reduce rework risk and manage the process with the priority of PC rework management based on the following order: design > manufacturing > construction. The approach is suitable for core task identification in other areas.Originality/valueThis research provides insight into rework risk management and provides a novel analysis method for rework risk and PC management from the perspective of the construction process. The findings are valuable for supporting stakeholders in making effective construction plans to reduce the impacts of rework risk in PC and provide a reference for future research on process optimization.
Title: Research on the rework risk core tasks in prefabricated construction in China
Description:
PurposeThe purpose of this paper is to assess the process of prefabricated construction (PC) and analyze the impacts of rework risk to identify the core tasks for which the rework risk has severe impacts.
Design/methodology/approachThe methods consist of a literature review, expert interviews, a questionnaire survey and a rework risk function.
The expert interviews and questionnaire survey were administered to experts in the entire process of PC from the dimensions of rework frequency, rework cost and rework time.
Descriptive and inferential statistics were employed to analyze the data.
The rework risk function was based on the loss expectancy method.
FindingsThere are 13 core tasks that have higher impacts than the average level.
The core tasks in the design stage account for 100% of the tasks in the stage, those in the manufacturing stage account for 20% and those in the construction stage account for 23.
1%.
Compared with the other stages, the design stage is characterized by significantly more frequent rework, higher rework costs and longer rework time.
The manufacturing stage is characterized by significantly higher rework costs than the construction stage.
The manufacturing stage and construction stage are co-reliant, and both are impacted by the design stage.
Practical implicationsThe findings provide stakeholders with a clear understanding of the core tasks of the PC process and represent a method for identifying core tasks.
Stakeholders can learn from this to focus on the core tasks to reduce rework risk and manage the process with the priority of PC rework management based on the following order: design > manufacturing > construction.
The approach is suitable for core task identification in other areas.
Originality/valueThis research provides insight into rework risk management and provides a novel analysis method for rework risk and PC management from the perspective of the construction process.
The findings are valuable for supporting stakeholders in making effective construction plans to reduce the impacts of rework risk in PC and provide a reference for future research on process optimization.

Related Results

ANALISIS PEKERJAAN YANG MENGALAMI REWORK PADA PROYEK PERUMAHAN DI BANDUNG
ANALISIS PEKERJAAN YANG MENGALAMI REWORK PADA PROYEK PERUMAHAN DI BANDUNG
AbstrakKebutuhan rumah pada tahun 2013 mencapai 12 juta unit, sedangkan suplai produksi rumah hanya 250.000 - 400.000 unit/tahun dan ada sekitar 900.000 rumah tangga baru per tahun...
Pricing Models under Three-Echelon Prefabricated Construction Supply Chains with Consumer Preferences
Pricing Models under Three-Echelon Prefabricated Construction Supply Chains with Consumer Preferences
With the growing ecological crisis and consumer environmental awareness, there is a general recognition of the urgent need for the reform of the energy-intensive construction indus...
Application of BIM Technology in Prefabricated Green Building Construction Management
Application of BIM Technology in Prefabricated Green Building Construction Management
Increasing the research on BIM Technology of prefabricated energy-saving green building construction can promote the process of prefabricated green construction in the construction...
Review of Cost Control Research in Prefabricated Construction under EPC Mode
Review of Cost Control Research in Prefabricated Construction under EPC Mode
Aims: Amidst the accelerating global urbanization and growing demand for sustainable development, prefabricated construction emerges as a pivotal transformational force in the cons...
Research on Risk Management of Prefabricated Construction Supply Chain Based on Immune Principle
Research on Risk Management of Prefabricated Construction Supply Chain Based on Immune Principle
Abstract The structure of the prefabricated construction supply chain is becoming more and more complex, and the related risks of the prefabricated construction supp...
Research and Application of Intelligent Construction in Prefabricated Building Construction
Research and Application of Intelligent Construction in Prefabricated Building Construction
The rapid development of emerging technologies such as BIM has greatly promoted the intelligent development of prefabricated building construction. This paper adopts a research met...
Numerical Analysis on Diffusion Mechanism of Prefabricated Technology Under Government Intervention Based on Evolutionary Game
Numerical Analysis on Diffusion Mechanism of Prefabricated Technology Under Government Intervention Based on Evolutionary Game
The diffusion of prefabricated construction technology is an important guarantee for industrialization of construction industry. To investigate the roles of government, developers ...
DESIGN PROCESS MODELLING TO MEASURE ENGINEERING PRODUCTIVITY IN BUILDING DESIGN
DESIGN PROCESS MODELLING TO MEASURE ENGINEERING PRODUCTIVITY IN BUILDING DESIGN
AbstractA multi-domain Matrix (MDM) is used to identify and analyse rework loops within the Building Design (BD) process caused by building regulations. To model this process, we u...

Back to Top